Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
| 09/11/2023 | COT - LCBU - Building Final | Partial Pass | 9/11/23: Partial pass--plumbing is not complete for salon sinks, toilet is 15" from wall and needs to be 18" centered, and bathroom sink is not completely connected to water or sewer lines. Electrical and mechanical are completed and operational. | |
| 11/27/2023 | COT - LCBU - Building Final | Re-inspection required | 9/11/23: Partial pass--plumbing is not complete for salon sinks, toilet is 15" from wall and needs to be 18" centered, and bathroom sink is not completely connected to water or sewer lines. Electrical and mechanical are completed and operational. 11/27/23:called at 10:36am no answer (left message), called at 10:45am no answer. No access to site. |
|
| 12/18/2023 | COT - LCBU - Building Final | Passed |