Permit: T21CM07719
Permit Details
Apply Date:
09/27/2021
Applicant:
Cheyenne Palmer
Description:
REMODEL AND EXPANSION (ADDING SQ FOOTAGE)
Permit Reviews
Permit Number - T21CM07719
Permit Status: Complete
Permit Description: REMODEL AND EXPANSION (ADDING SQ FOOTAGE)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/20/2022 | 3RD PARTY REVIEW - COMMERCIAL TI | 03/07/2022 | COMPLETED |
03/12/2022 | RESUBMITTAL | 05/13/2022 | COMPLETED |
01/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/11/2024 | APPROVED |
Conditions
Permit Number - T21CM07719
Permit Status: Complete
Permit Description: REMODEL AND EXPANSION (ADDING SQ FOOTAGE)
Date | Description | Comments |
---|---|---|
02/03/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
02/03/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
02/03/2022 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
02/03/2022 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
02/03/2022 | SPECIAL INSPECTION IS REQUIRED FOR HELICAL PIERS. | |
02/03/2022 | SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL. | |
02/03/2022 | SHOP DRAWINGS REQUIRED FOR I-JOISTS | |
02/03/2022 | SHOP DRAWINGS REQUIRED FOR AUTOMATIC SPRINKLER SYSTEM | |
02/03/2022 | SHOP DRAWINGS REQUIRED FOR SOLAR (PV) |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM07719
Permite Description: REMODEL AND EXPANSION (ADDING SQ FOOTAGE)
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCEL - Temporary Service | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Masonry Pregrout | N/A | Not Ready | |
02/13/2023 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Stem wall (formed) at 44” AFFE, South wall. Ok to place concrete in progress areas. Two pier footings on west side of existing building. Ok to place concrete in progress areas. |
10/26/2023 | COT - LCBU - Building Final | N/A | Partial Pass | 10/26/23: stem wall/ retaining reinforcement per plan ok to pour. |
06/26/2023 | COT - LCBU - Framing | N/A | Partial Pass | Rough framing is partially complete with clips and sheathing still needing to be done. Ledger boards and glulam beams are in place, ready for trusses to be installed. |
10/26/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
12/20/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Need to final out Fire Alarm. |
01/04/2024 | COT - LCPL - Medical Gas Preconstruction Mtg | N/A | Not Applicable | |
08/22/2023 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | Contractor cancelled. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM07719
Permit Description: REMODEL AND EXPANSION (ADDING SQ FOOTAGE)
Total Completed Inspections - 31
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Ufer to temp power panels.} | |
07/11/2023 | COT - LCBU - Roof Nailing | Passed | ||
07/19/2023 | COT - LCPL - Plumbing Roof Drains | Passed | ||
10/02/2023 | COT - LCEL - Electrical Underground | Passed | Roof drains: two each 4” - 6” roof leaders under hydro test. | |
10/23/2023 | COT - LCBU - Stem Wall/Retaining Wall | Passed | Ok to place concrete in footing areas. | |
12/21/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
12/21/2023 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | ||
12/21/2023 | COT - LCBU - Building Final | Passed | Pending Fire Final, Ok to move in equipment and stock shelves. | |
12/21/2023 | COT - LCME - Mechanical Final | Passed | ||
12/21/2023 | COT - LCEL - Electrical Final | Passed | ||
12/21/2023 | COT - LCPL - Plumbing Final | Passed | ||
01/04/2024 | COT - LCBU - Framing | Passed | ||
01/04/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
01/04/2024 | COT - LCPL - Rough Soil | Passed | ||
01/04/2024 | COT - LCBU - Sustainability | Passed | ||
01/04/2024 | COT - LCME - Mechanical Above Ceiling | Passed | ||
01/04/2024 | COT - FCON - Fire - Final | Passed | ||
01/04/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
01/04/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
01/04/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
01/04/2024 | COT - FCON - Hood System - Final | Passed | ||
01/04/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
01/04/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
01/04/2024 | COT - FCON - Sprinkler - Final | Passed | ||
01/04/2024 | COT - LCEL - Construction Power | Passed | ||
01/04/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
01/04/2024 | COT - LCBU - Preslab | Passed | ||
01/04/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
01/04/2024 | COT - FCON - Alarm - Final | Passed | ||
01/04/2024 | BULD - Electrical Clearance | Passed | No clearance required. | |
01/04/2024 | COT - BULD - SWG Clearance | Passed | No clearance required. |