Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM07543
Permit Details
Apply Date:
09/20/2021
Applicant:
Fernan Salazar
Description:
SFR T20-M0055
Permit Reviews
Permit Number - T21CM07543
Permit Status: Complete
Permit Description: SFR T20-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/20/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 11/15/2021 | COMPLETED |
Conditions
Permit Number - T21CM07543
Permit Status: Complete
Permit Description: SFR T20-M0055
Date | Description | Comments |
---|---|---|
10/25/2021 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
10/25/2021 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
10/25/2021 | FUP T21OT00765 MUST BE PAID BEFORE FINAL INSPECTIONS. | |
10/25/2021 | FUP T21OT00765 MUST BE PAID BEFORE FINAL INSPECTIONS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM07543
Permite Description: SFR T20-M0055
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2022 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Canceled | {Activity date: 09/01/2022; Status: Not Applicable; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not a required inspection} |
10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
02/01/2023 | COT - LCBU - Framing | N/A | Re-inspection required (with fee) | Corrections not complete. |
02/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | tub is leaking and Titans have not been inspected; ok to proceed elsewhere. |
02/01/2023 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | tub is leaking; ok to proceed elsewhere. |
03/09/2023 | COT - RSEL - Construction Power | N/A | Re-inspection required | 3-9-23: Address label is incorrect. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM07543
Permit Description: SFR T20-M0055
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved to c/o} | |
06/20/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
06/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
09/01/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
10/10/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: WGALLAGER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval CS strapping not fully nailed and missing in one area and should be 48" per detail} | |
01/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
01/06/2023 | RSME - Mechanical Progress | Passed | ||
02/03/2023 | COT - LCBU - Framing | Passed | ||
02/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/03/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
05/22/2023 | COT - RSEL - Construction Power | Passed | Clearance for TEP ECO. 5/22/2023 | |
05/22/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 5/22/2023 | |
05/22/2023 | COT - RSEL - Electrical Underground | Passed | ||
06/20/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/20/2023 | COT - RSEL - Service Upgrade | Passed | ||
07/10/2023 | COT - RSPL - Sewer | Passed | ||
12/08/2023 | COT - RSME - Mechanical Final | Passed | 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs. | |
12/08/2023 | RSBU - Building Final | Passed | 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs. | |
12/08/2023 | COT - RSPL - Yard Water Line | Passed | 12/8/23: Main water line is connected to meter and fully functional. | |
12/08/2023 | COT - RSPL - Plumbing Final | Passed | 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs. | |
12/08/2023 | COT - RSEL - Electrical Final | Passed | 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs. |