Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3333 E GLENN ST
Apply Date:
09/20/2021
Applicant:
alex enoch
Description:
SFR T20-M0055

Permit Reviews

Permit Number - T21CM07543
Permit Status: Complete
Permit Description: SFR T20-M0055
Start Date Submittal Complete Date Status  
09/20/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 11/15/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM07543
Permit Status: Complete
Permit Description: SFR T20-M0055
Date Description Comments
10/25/2021 SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
10/25/2021 FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
10/25/2021 FUP T21OT00765 MUST BE PAID BEFORE FINAL INSPECTIONS.
10/25/2021 FUP T21OT00765 MUST BE PAID BEFORE FINAL INSPECTIONS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM07543
Permite Description: SFR T20-M0055
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
09/01/2022 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Canceled {Activity date: 09/01/2022; Status: Not Applicable; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not a required inspection}
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
02/01/2023 COT - LCBU - Framing N/A Re-inspection required (with fee) Corrections not complete.
02/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass tub is leaking and Titans have not been inspected; ok to proceed elsewhere.
02/01/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass tub is leaking; ok to proceed elsewhere.
03/09/2023 COT - RSEL - Construction Power N/A Re-inspection required 3-9-23: Address label is incorrect.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM07543
Permit Description: SFR T20-M0055
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/16/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved to c/o}
06/20/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
06/20/2022 COT - RSBU - Preslab Passed {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
09/01/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/10/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 10/10/2022; Status: Approved; Inspector: WGALLAGER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval CS strapping not fully nailed and missing in one area and should be 48" per detail}
01/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/06/2023 RSME - Mechanical Progress Passed
02/03/2023 COT - LCBU - Framing Passed
02/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/03/2023 COT - LCPL - Plumbing Intermediate Passed
05/22/2023 COT - RSEL - Construction Power Passed Clearance for TEP ECO. 5/22/2023
05/22/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 5/22/2023
05/22/2023 COT - RSEL - Electrical Underground Passed
06/20/2023 COT - RSEL - Outdoor Lighting Passed
06/20/2023 COT - RSEL - Service Upgrade Passed
07/10/2023 COT - RSPL - Sewer Passed
12/08/2023 COT - RSME - Mechanical Final Passed 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs.
12/08/2023 RSBU - Building Final Passed 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs.
12/08/2023 COT - RSPL - Yard Water Line Passed 12/8/23: Main water line is connected to meter and fully functional.
12/08/2023 COT - RSPL - Plumbing Final Passed 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs.
12/08/2023 COT - RSEL - Electrical Final Passed 12/8/23: Electrical panel has been properly labeled, U/V tape has been installed on line set for A/C Unit, spinners have been installed on Freon ports of A/C unit, waterproof covers have been installed on all exterior outlets, proper fuses for A/C unit and air handler have been installed, 2 new outlets were added at kitchen counter, handrails for stairs have been installed, U/V tape has been installed on exterior water line, and anti-siphon devices have been installed on all exterior hose bibs.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FUP INFORMATION SHEET.DOCX DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
OWNER TRANSFER PERMIT LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW
WASTEWATER RECEIPT.PDF DOCUMENTS VIEW