Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2020 W PRINCE RD
Apply Date:
08/30/2021
Applicant:
Jeffrey Lang
Description:
Addition: Warehouse

Permit Reviews

Permit Number - T21CM07041
Permit Status: Complete
Permit Description: Addition: Warehouse
Start Date Submittal Complete Date Status  
01/10/2022 RESUBMITTAL 02/17/2022 COMPLETED Review Details
02/25/2022 RESUBMITTAL 03/15/2022 COMPLETED Review Details
06/23/2022 REVISION - - 1ST 07/07/2022 COMPLETED Review Details
08/30/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 11/22/2021 COMPLETED Review Details
05/09/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/10/2023 APPROVED Review Details
11/10/2022 COMMERCIAL REVIEW - FULL v.1 12/06/2022 REQUIRES RESUBMIT Review Details
12/07/2022 COMMERCIAL REVIEW - FULL v.2 12/14/2022 APPROVED Review Details
02/16/2023 COMMERCIAL REVIEW - FULL v.1 02/16/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM07041
Permit Status: Complete
Permit Description: Addition: Warehouse
Date Description Comments
03/03/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/03/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
03/03/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
03/03/2022 SPECIAL INSPECTION IS REQUIRED FOR STEEL CONSTRUCTION.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM07041
Permite Description: Addition: Warehouse
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCME - Mechanical Progress N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - LCBU - Roof Nailing N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
11/29/2022 COT - LCBU - Framing N/A Partial Pass partial approval for offices, restrooms and riser room
12/22/2022 COT - FCON - Sprinkler - Final N/A Partial Pass Functioning properly, needs to be retested when permanent power is connected.
12/22/2022 COT - FCON - Alarm - Final N/A Partial Pass Functioning properly, needs to be retested when permanent power is connected.
11/29/2022 COT - LCEL - Electrical Intermediate N/A Partial Pass partial approval for Offices, restroom, fire riser room
10/26/2022 COT - LCEL - Electrical Progress N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
12/22/2022 COT - FCON - Fire - Final N/A Partial Pass Fire protection systems are functioning properly, will need to final after permanent power is connected. Approved to obtain TCO for storage.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM07041
Permit Description: Addition: Warehouse
Total Completed Inspections - 25
Date Description Inspector Results Comments
04/06/2022 COT - LCPL - Sewer Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
07/19/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 07/19/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap
Ufer attachment at south 1/2 of building - east side turndown.}
11/29/2022 COT - LCME - Mechanical Intermediate Passed
12/01/2022 COT - LCPL - Plumbing Intermediate Passed
12/07/2022 COT - LCPL - Plumbing Progress Passed
12/09/2022 COT - HCBU - Interior Shear Bracing Passed
12/14/2022 COT - LCEL - Electrical Underground Passed
12/19/2022 COT - LCPL - Plumbing Above Ceiling Passed
12/19/2022 COT - LCBU - Exterior Clips/Sheathing Passed per third party
12/21/2022 COT - LCBU - Building Above Ceiling Passed
12/21/2022 COT - LCEL - Electrical Above Ceiling Passed
12/21/2022 FCON – OH Piping & Hydro Passed
12/22/2022 COT - HCEL - Electrical Underground Passed
02/10/2023 BULD - Electrical Clearance Passed
03/08/2023 COT - LCPL - Plumbing Final Passed
03/08/2023 COT - LCBU - Building Final Passed
03/08/2023 COT - LCEL - Electrical Final Passed
03/08/2023 COT - LCME - Mechanical Final Passed
03/08/2023 COT - FCON - Sprinkler - Final Passed
03/08/2023 COT - FCON - Alarm - Final Passed
03/08/2023 COT - LCBU - Building Progress Passed
03/08/2023 COT - LCEL - Electrical Intermediate Passed
03/08/2023 COT - LCEL - Electrical Progress Passed
03/08/2023 COT - LCEL - Outdoor Lighting Passed
04/21/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CONCRETE TILT PANEL SUBMITTAL_ABQ FOR REFERENCE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
DEFERRED SUBMITTAL - PEMB DRAWING SUBMITTAL (2) 2022-03-24 - UPLOADED FILE TYPE PLANS 1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FIRE SPRINKLER REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECH REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECH SOILS REPORT EXPANSION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PEMB DRAWING 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_TILT-PANEL-DRAWINGS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CONCRETE TILT PANEL SUBMITTAL_ABQ FOR REFERENCE.PDF DOCUMENTS VIEW
DEFERRED SUBMITTAL - PEMB DRAWING SUBMITTAL (2) 2022-03-24 - UPLOADED FILE TYPE PLANS 1.PDF DOCUMENTS VIEW
FIRE SPRINKLER REPORT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
GEOTECH SOILS REPORT EXPANSION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PEMB DRAWING.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
REV1_TILT-PANEL-DRAWINGS.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FINAL SIC-2023-05-08_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
CONS-REV_PLAN SET_V1.PDF DOCUMENTS VIEW
REV_REV NARRATIVE_V1.PDF DOCUMENTS VIEW