Permit: T21CM06656
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
935 S FREMONT AV
Address NEW:
935 S FREMONT AV
Apply Date:
08/17/2021
Applicant:
Dean Neubauer
Description:
SFR
Permit Reviews
Permit Number - T21CM06656
Permit Status: Inspections complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/07/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/17/2022 | REQUIRES RESUBMIT |
| 08/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/20/2024 | APPROVED |
| 09/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/22/2023 | REQUIRES RESUBMIT |
| 04/27/2023 | RESIDENTIAL NEW DWELLING v.4 | 04/27/2023 | APPROVED |
| 01/04/2023 | RESIDENTIAL NEW DWELLING v.3 | 04/05/2023 | REQUIRES RESUBMIT |
| 01/04/2023 | RESIDENTIAL NEW DWELLING v.2 | 01/04/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T21CM06656
Permit Status: Inspections complete
Permit Description: SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - T21CM06656
Permit Status: Inspections complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 04/27/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 02/01/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: T21CM06656
Permite Description: SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | Not ready. Provide third party inspection for post tension. 9/14/2023 Add rebar around tub box. |
| 11/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 11/13/24. Not ready, no water in per or pvc |
| 12/30/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Ok to set meter. TEP needs to move power pole and set transformer before service can be applied. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: T21CM06656
Permit Description: SFR
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading is required. 8/18/2023 | |
| 09/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Corrections were made. 9/22/2023 | |
| 09/22/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 09/22/2023 | COT - RSBU - Preslab | Passed | ||
| 08/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 08/21/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/21/2024 | COT - RSPL - Sewer | Passed | ||
| 12/03/2024 | COT - RSPL - Yard Water Line | Passed | Main water line to house (1 1/2”). Ok to cover progress areas. | |
| 12/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and sheet rock walls | |
| 06/23/2025 | BULD - Electrical Clearance | Passed | 6/23/25 TEP clearance: ECO |
|
| 06/15/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/15/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/15/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/15/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/15/2026 | RSBU - Building Final | Passed | ||
| 06/15/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |