Permit: T21CM06290
Permit Details
Apply Date:
08/03/2021
Applicant:
Christopher Perry
Description:
Install new conduit and wire from existing panel to 208/240V 30A receptacle into kitchen for a new s
Permit Reviews
Permit Number - T21CM06290
Permit Status: Complete
Permit Description: Install new conduit and wire from existing panel to 208/240V 30A receptacle into kitchen for a new s
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/03/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 08/26/2021 | COMPLETED |
| 09/09/2021 | RESUBMITTAL | 09/14/2021 | COMPLETED |
| 11/02/2021 | RESUBMITTAL | 11/03/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM06290
Permite Description: Install new conduit and wire from existing panel to 208/240V 30A receptacle into kitchen for a new s
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2022 | COT - LCEL - Electrical Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM06290
Permit Description: Install new conduit and wire from existing panel to 208/240V 30A receptacle into kitchen for a new s
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2021 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 11/19/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} | |
| 11/19/2021 | COT - LCEL - Electrical Above Ceiling | Passed | {Activity date: 11/19/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} | |
| 12/13/2021 | COT - FCON - Fire - Final | Passed | {Activity date: 12/13/2021; Status: Approved; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - } | |
| 12/13/2021 | COT - FCON - Hood System - Final | Passed | {Activity date: 12/13/2021; Status: Approved; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - } |