Permit: T21CM06279
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
150 W OKLAHOMA ST
Address NEW:
150 W OKLAHOMA ST
Apply Date:
08/03/2021
Applicant:
ALBERTO CABALLERO MORENO
Description:
Remodel and Addition with 2 Bedrooms
Permit Reviews
Permit Number - T21CM06279
Permit Status: Issued
Permit Description: Remodel and Addition with 2 Bedrooms
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/03/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/31/2021 | COMPLETED |
| 09/21/2021 | RESUBMITTAL | 09/30/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM06279
Permite Description: Remodel and Addition with 2 Bedrooms
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 6/24/25 1. Primary bedroom receptacles are wired improperly, open ground, reverse hot/neutral. 2. Hallway receptacle across from bathroom has open ground. 3. Kitchen outlet across from fridge has open ground. 5. Water hammer arrestors needed at ice maker and laundry washer machine water inlets. 6. Receptacles in pantry and just outside pantry has open hot. 7. Bedroom 2 all receptacles, hot/neutral reversed. 8. Bedroom 2 is missing receptacle on the right wall as you walk in. 9. Bedroom 3 all receptacles hot and neutral reversed. 10. Bedroom 4; smoke detectors is too close to supply diffuser it sitting 6" away, needs to be minimum of 3 ft away. 11. Bedroom 4; all receptacles hot/neutral reversed. 12. Missing outdoor receptacles front and back of house 13. No plans on site, must have plans available for all inspections 14. T/P line on the water heater needs to terminate no higher than 6" from ground. 15. Provide ladder access to check HVAC. |
| 06/24/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 6/24/25 1. Primary bedroom receptacles are wired improperly, open ground, reverse hot/neutral. 2. Hallway receptacle across from bathroom has open ground. 3. Kitchen outlet across from fridge has open ground. 5. Water hammer arrestors needed at ice maker and laundry washer machine water inlets. 6. Receptacles in pantry and just outside pantry has open hot. 7. Bedroom 2 all receptacles, hot/neutral reversed. 8. Bedroom 2 is missing receptacle on the right wall as you walk in. 9. Bedroom 3 all receptacles hot and neutral reversed. 10. Bedroom 4; smoke detectors is too close to supply diffuser it sitting 6" away, needs to be minimum of 3 ft away. 11. Bedroom 4; all receptacles hot/neutral reversed. 12. Missing outdoor receptacles front and back of house 13. No plans on site, must have plans available for all inspections 14. T/P line on the water heater needs to terminate no higher than 6" from ground. 15. Provide ladder access to check HVAC. |
| 06/24/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 6/24/25 1. Primary bedroom receptacles are wired improperly, open ground, reverse hot/neutral. 2. Hallway receptacle across from bathroom has open ground. 3. Kitchen outlet across from fridge has open ground. 5. Water hammer arrestors needed at ice maker and laundry washer machine water inlets. 6. Receptacles in pantry and just outside pantry has open hot. 7. Bedroom 2 all receptacles, hot/neutral reversed. 8. Bedroom 2 is missing receptacle on the right wall as you walk in. 9. Bedroom 3 all receptacles hot and neutral reversed. 10. Bedroom 4; smoke detectors is too close to supply diffuser it sitting 6" away, needs to be minimum of 3 ft away. 11. Bedroom 4; all receptacles hot/neutral reversed. 12. Missing outdoor receptacles front and back of house 13. No plans on site, must have plans available for all inspections 14. T/P line on the water heater needs to terminate no higher than 6" from ground. 15. Provide ladder access to check HVAC. |
| 06/24/2025 | RSBU - Building Final | N/A | Re-inspection required | Not ready. Called and waited 15 min for husband to show up. Need access to site. 6/13/2025 6/24/25 1. Primary bedroom receptacles are wired improperly, open ground, reverse hot/neutral. 2. Hallway receptacle across from bathroom has open ground. 3. Kitchen outlet across from fridge has open ground. 5. Water hammer arrestors needed at ice maker and laundry washer machine water inlets. 6. Receptacles in pantry and just outside pantry has open hot. 7. Bedroom 2 all receptacles, hot/neutral reversed. 8. Bedroom 2 is missing receptacle on the right wall as you walk in. 9. Bedroom 3 all receptacles hot and neutral reversed. 10. Bedroom 4; smoke detectors is too close to supply diffuser it sitting 6" away, needs to be minimum of 3 ft away. 11. Bedroom 4; all receptacles hot/neutral reversed. 12. Missing outdoor receptacles front and back of house 13. No plans on site, must have plans available for all inspections 14. T/P line on the water heater needs to terminate no higher than 6" from ground. 15. Provide ladder access to check HVAC. |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM06279
Permit Description: Remodel and Addition with 2 Bedrooms
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2021 | COT - RSPL - Yard Water Line | Passed | {Activity date: 11/17/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, okay to backfill} | |
| 11/17/2021 | COT - RSPL - Rough Soil | Passed | {Activity date: 11/17/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved} | |
| 11/17/2021 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 11/17/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved 11/2/21 under permit T21CM08368, clearance was called into SWG for meter set } |
|
| 11/24/2021 | COT - RSBU - Preslab | Passed | {Activity date: 11/24/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, okay to pour concrete } ; {Activity date: 11/23/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} |
|
| 11/24/2021 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 11/24/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 11/23/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} | |
| 05/23/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 05/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system} | |
| 05/23/2022 | COT - LCBU - Framing | Passed | {Activity date: 05/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to install intermediates. } |
|
| 05/23/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 05/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} | |
| 09/27/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 09/27/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE INCR} | |
| 09/27/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/08/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Provide DWV test.} | |
| 09/27/2022 | COT - RSEL - Service Upgrade | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, please send INCR Clearance to TEP for panel relocation} | |
| 06/24/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/24/2025 | COT - BULD - SWG Clearance | Passed | Southwest Gas clearance: SWG | |
| 04/07/2026 | COT - RSME - Mechanical Final | Passed | ||
| 04/07/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 05/06/2026 | COT - RSEL - Electrical Final | Passed | 5.6.26 Approved correction made |
|
| 05/06/2026 | RSBU - Building Final | Passed | 5.6.26 Approved correction made |