Permit: T21CM06028
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
1863 W KING AV UNIT 1
Address NEW:
1863 W KING AV UNIT 1
Apply Date:
07/26/2021
Applicant:
Description:
SFR, 1 of 2 on parcel
Permit Reviews
Permit Number - T21CM06028
Permit Status: Expired
Permit Description: SFR, 1 of 2 on parcel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/26/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/30/2021 | COMPLETED |
| 09/30/2021 | RESUBMITTAL | 11/08/2021 | COMPLETED |
| 03/02/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/06/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM06028
Permit Status: Expired
Permit Description: SFR, 1 of 2 on parcel
| Date | Description | Comments |
|---|---|---|
| 02/01/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T21CM06028
Permite Description: SFR, 1 of 2 on parcel
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | interior shear bracing is gypsum board |
Completed Inspections
Permit Status: Expired
Permit Number: T21CM06028
Permit Description: SFR, 1 of 2 on parcel
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to cover **Please revise contact information: Settlers West Home Builder, 3301 W Bayleaf Dr Tucson,AZ 85741, Andrew 520-867-1095} ; {Activity date: 08/22/2022; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by VVERA1 - Cancelled, several messages left with office 520-616-0309, no response } |
|
| 08/30/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 08/30/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay for concrete placement} | |
| 08/30/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 02/15/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 02/17/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/17/2023 | COT - LCBU - Framing | Passed | ||
| 03/23/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/23/2023 approved. Corrections were made. | |
| 03/23/2023 | COT - LCPL - Plumbing Intermediate | Passed | 3/23/2023 approved. Corrections were made. | |
| 04/13/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 07/28/2023 | COT - RSPL - Sewer | Passed | Approved 4" ABS from SFR #1 and SFR #2 connected to a single 4" ABS sewer line to the HCS connection, okay to shade/backfill progress areas | |
| 08/07/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 01/08/2024 | BULD - Electrical Clearance | Passed | 1/8/24 resent | |
| 12/28/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 12/28/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 12/28/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 12/28/2023 | RSME - Mechanical Progress | Passed | ||
| 12/28/2023 | COT - RSME - Mechanical Final | Passed | ||
| 12/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/28/2023 | COT - RSEL - Electrical Final | Passed | Submitted for electric clearance at 0950 hours. | |
| 12/28/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 01/25/2024 | RSBU - Building Final | Passed | OK to make application for Certificate of Occupancy | |
| 01/25/2024 | COT - RSEL - Construction Power | Passed |