Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3350 E MEDINA RD
Address NEW:
3350 E MEDINA RD
Apply Date:
06/25/2021
Applicant:
Description:
Proposed construction of a 99,000 sf shell building and associated site work

Permit Reviews

Permit Number - T21CM05270
Permit Status: Complete
Permit Description: Proposed construction of a 99,000 sf shell building and associated site work
Start Date Submittal Complete Date Status  
06/25/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 08/23/2021 COMPLETED Review Details
08/20/2021 RESUBMITTAL 10/13/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM05270
Permit Status: Complete
Permit Description: Proposed construction of a 99,000 sf shell building and associated site work
Date Description Comments
07/01/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/01/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
07/01/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
07/01/2021 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
07/01/2021 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
07/01/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/01/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/01/2021 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM05270
Permite Description: Proposed construction of a 99,000 sf shell building and associated site work
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/11/2022 COT - LCEL - Service Upgrade N/A Canceled {Activity date: 03/11/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Applicable} ; {Activity date: 03/10/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable.}
11/04/2022 COT - LCEL - Electrical Intermediate N/A Partial Pass CLEARANCE: SES system, Ok to set meters for meters/panels #1 and #2. CODE: ECO
12/20/2022 FCON – OH Piping & Hydro N/A Not Applicable
COT - FCON - Pump - Final N/A Not Ready The alarm panel needed to moved out of the pump room. The pump rep was there and was going to commission the fire pump and hand it over to the sprinkler company so they could call in the fire pump final when the alarm was done.
01/24/2023 COT - FCON - Fire - Final N/A Partial Pass Exit signs on north exits need to be installed, egress lighting outside all exit doors in to be working. OK to obtain TCO

Completed Inspections

Permit Status: Complete
Permit Number: T21CM05270
Permit Description: Proposed construction of a 99,000 sf shell building and associated site work
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/10/2022 COT - LCEL - Electrical Progress Passed {Activity date: 03/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Clear TEP TMPP}
03/10/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 03/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - CODE TMPP}
05/05/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 05/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/14/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, 12 light pole base uffer a installed.}
08/17/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 08/17/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/11/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Pour back from grid line 5 to 8.} ; {Activity date: 08/08/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - partial. grid line 1-5 okay to pour concrete.

} ; {Activity date: 08/02/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - at site. No superintendent on site. Need contact information.} ; {Activity date: 07/29/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - grid line 5 to grid line 13. And C- H partial. Okay to proceed.} ; {Activity date: 06/30/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 06/20/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, NO INSPECTION REQUIRED SEE PREVIOUS NOTES.} ; {Activity date: 06/16/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, RETAINING WALLS AT LOADING DOCK LOCATIONS OK FOR CONCRETE PLACEMENT.

} ; {Activity date: 06/10/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, panels 70,71 ok for concrete placement
} ; {Activity date: 06/09/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR, cancelled by Contractor} ; {Activity date: 06/08/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for panels 72, 73, 74, 75

} ; {Activity date: 06/06/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, following tilt panels ok for concrete placement
9,10,11,12,13,68} ; {Activity date: 06/02/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, following tilt panels ok for concrete placement (33,35,36,39,40,41,42)} ; {Activity date: 05/26/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval panels 28, 29,30,31,32,34,37,38 ref 3rd party inspection

} ; {Activity date: 05/24/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, following tilt panels ok for concrete placement. 43,44,45,46,47,49,63} ; {Activity date: 05/19/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial Panels 22-27} ; {Activity date: 05/10/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Spandrel column footings X3 on South side ok for concrete placement.} ; {Activity date: 05/06/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - -Partial following tilt panels 48-54,62, & CF ok for concrete placement.} ; {Activity date: 05/05/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, following tilt panels 19,18,17,16,15, & CF progress ok for concrete placement.} ; {Activity date: 05/02/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial inspection for continuous footings at Gridline 4-6 with foundation for column pads at loading dock, and Gridline 8-11 with foundation for column pads at loading dock all ok for concrete placement.

} ; {Activity date: 04/28/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial, inspection for foundation from GL 1-5, & Continuous footings from GL 8-13 all ok for concrete placement.} ; {Activity date: 04/25/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial following tilt panels ok for concrete placement 55,56,57,58,59,61} ; {Activity date: 04/20/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for panels 1,2,69, 65,64, 66, 67 ok to place concrete

} ; {Activity date: 04/12/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, foundation slab GL 7-9, Tilt panels 3-8 ok for concrete placement} ; {Activity date: 04/04/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial GL 7-9 ok for concrete placement} ; {Activity date: 04/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - partial, west side slab from GL (A~E, 1~3) ok for concrete placement.} ; {Activity date: 03/14/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - - Partial, 12 light pole bas me Carson’s ok for concrete placement.} ; {Activity date: 02/22/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, inspection for north Continuous spread footing heading East and East footing heading south for future tilt panels ok for concrete placement and to proceed.} ; {Activity date: 02/17/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, re enforcement for continuous spread footing for future tilt panels ok for concrete placement South (GL 4-9).} ; {Activity date: 02/15/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Continuous Exterior footing for future tilt panels from Grid line (A-E)-(1-3) ok for concrete placement.

}
10/03/2022 COT - LCBU - Framing Passed {Activity date: 10/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Interior walls.} ; {Activity date: 09/28/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial, pending intermediates. Okay to drywall 1 side of Electrical Room, also okay to drywall 1 side of the TI perimeter walls (upper 18’ )

}
07/07/2023 COT - LCEL - Electrical Intermediate Passed
01/20/2023 COT - LCBU - Building Progress Passed
01/20/2023 COT - LCEL - Electrical Underground Passed
01/20/2023 COT - LCPL - Rough Soil Passed
01/20/2023 COT - LCBU - Preslab Passed
01/20/2023 COT - LCPL - Sewer Passed
01/20/2023 COT - LCPL - Plumbing Intermediate Passed
01/20/2023 COT - FCON - Alarm - Final Passed
01/20/2023 COT - LCPL - Plumbing Final Passed
01/20/2023 COT - FCON - Sprinkler - Final Passed
01/20/2023 COT - LCBU - Building Final Passed
01/20/2023 COT - LCEL - Electrical Final Passed
03/08/2023 COT - FCON - Pump - Final Passed
01/20/2023 COT - LCME - Mechanical Intermediate Passed
01/20/2023 COT - LCME - Mechanical Final Passed
01/20/2023 COT - LCPL - Plumbing Roof Drains Passed
03/10/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
2021 CERTIFICATE OF GOOD STANDING.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
CODE REVIEW CHECKLIST.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMMERCIAL CHECKLIST.PDF DOCUMENTS VIEW
GENERAL CONTRACTOR LETTER.PDF DOCUMENTS VIEW
FIRE FLOW.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
DRAINAGE ADDENDUM.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SEWER CONNECTION PERMIT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
TRAFFIC IMPACT STATEMENT.PDF DOCUMENTS VIEW
STRUCTUAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW