Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2656 E GINTER RD
Address NEW:
2656 E GINTER RD
Apply Date:
06/21/2021
Applicant:
Keith Campbell
Description:
New Pre-Fab Metal Industrial Building

Permit Reviews

Permit Number - T21CM05153
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
Start Date Submittal Complete Date Status  
06/21/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 07/29/2021 COMPLETED Review Details
08/11/2021 RESUBMITTAL 09/01/2021 COMPLETED Review Details
10/12/2021 RESUBMITTAL 10/13/2021 COMPLETED Review Details
12/12/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/12/2023 REQUIRES RESUBMIT Review Details
12/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/15/2023 APPROVED Review Details
10/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/27/2023 APPROVED Review Details

Conditions

Permit Number - T21CM05153
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
Date Description Comments
08/18/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/18/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
08/18/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
08/18/2021 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
08/18/2021 SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED METAL BUILDING

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM05153
Permite Description: New Pre-Fab Metal Industrial Building
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
01/09/2023 COT - LCBU - Excavation/Rebar/Zoning N/A Canceled
04/05/2023 COT - LCPL - Plumbing Roof Drains N/A Not Applicable
01/09/2023 COT - LCBU - Preslab N/A Canceled
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready
01/09/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass interior rough-in complete. system pressured to 60# psi and holding.
04/28/2023 COT - LCPL - Sewer N/A Not Applicable Not applicable, building is on a septic system.
04/28/2023 COT - LCBU - Building Progress N/A Partial Pass Cabinets are installed with plumbing fixtures. HVAC ductwork from main trunk to registers are being installed. Grid ceiling is installed with lights and duct registers.
09/05/2023 COT - LCEL - Outdoor Lighting N/A Canceled 9/5/23: canceled per contractor
09/05/2023 COT - LCEL - Electrical Final N/A Canceled
09/05/2023 COT - LCEL - Service Upgrade N/A Canceled
12/14/2023 COT - LCBU - Building Final N/A Partial Pass 12/14/23: Passed. Pending fire final
12/15/2023 COT - FCON - Fire - Final N/A Partial Pass FDC locking caps, knox box, fire extinguishers and riser/FACP signage.
12/04/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready
12/04/2023 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM05153
Permit Description: New Pre-Fab Metal Industrial Building
Total Completed Inspections - 36
Date Description Inspector Results Comments
08/04/2022 COT - LCPL - Rough Soil Passed {Activity date: 08/04/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover}
08/15/2022 COT - LCEL - Electrical Underground Passed {Activity date: 08/15/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
01/30/2023 COT - LCME - Mechanical Intermediate Passed All above ceiling units and ductwork is installed in office area. Coolers and ductwork is installed in open Bay Area.
01/30/2023 COT - LCEL - Electrical Intermediate Passed All electrical conduit and flex conduit is installed for outlets throughout building. Okay to Sheetrock office area.
01/30/2023 COT - LCBU - Framing Passed All metal stud framing is completed in office area. Okay to Sheetrock office area.
02/21/2023 COT - LCBU - Exterior Clips/Sheathing Passed
02/21/2023 COT - LCBU - Roof Nailing Passed
02/21/2023 COT - HCBU - Interior Shear Bracing Passed
04/05/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
04/05/2023 COT - LCBU - Preslab Passed
04/05/2023 COT - LCEL - Electrical Progress Passed
04/25/2023 COT - LCME - Mechanical Progress Passed
04/25/2023 COT - LCEL - Grounding/Bonding Passed
04/25/2023 COT - LCPL - Plumbing Intermediate Passed
04/25/2023 COT - LCPL - Plumbing Progress Passed
05/19/2023 COT - LCBU - Building Progress Passed Buildings #3 and #4.
05/22/2023 COT - LCME - Mechanical Above Ceiling Passed
05/22/2023 COT - LCEL - Electrical Above Ceiling Passed
05/22/2023 COT - LCBU - Building Above Ceiling Passed
05/22/2023 COT - LCPL - Plumbing Above Ceiling Passed
09/05/2023 BULD - Electrical Clearance Passed TEP ECO SUITE A and B
12/01/2023 COT - LCBU - Sustainability Passed
12/01/2023 PDSD Building Division - Sign Final Passed
12/01/2023 COT - LCEL - Outdoor Lighting Passed
12/04/2023 PDSD Site/Engineering Division - NPPO Passed
12/04/2023 COT - LCEL - Electrical Final Passed
12/14/2023 COT - LCME - Mechanical Final Passed
12/14/2023 COT - LCPL - Plumbing Final Passed
12/14/2023 COT - LCPL - Backwater Valve Passed
12/15/2023 COT - FCON - Alarm - Final Passed
12/15/2023 COT - FCON - Sprinkler - Final Passed
12/15/2023 TRSP - ROW - Final/Close-Out Passed
12/15/2023 COT - LCBU - Building Final Passed
12/26/2023 COT - FCON - Fire - Final Passed
01/05/2024 PDSD Site/Engineering Division - Landscaping Passed
01/05/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CHANGE OF ADDRESS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECH REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 5152 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 5153 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 5154 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 5155 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 5152 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 5153 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 5154 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 5155 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SPECIAL INSPECTION__CONCRETE_2656_FINAL-2023-12-14_V2.PDF DOCUMENTS VIEW
SPECIAL INSPECTION_FOUNDATION AND PAD_2656_COPY-2023-12-14_V2.PDF DOCUMENTS VIEW
SPECIAL INSPECTION_FOUNDATION AND PAD_2656_V2.PDF DOCUMENTS VIEW
TESTING FOR MECHANICAL_AIR AND BALANCE_2656 E GINTER_V1.PDF DOCUMENTS VIEW
TESTING FOR MECHANICAL_AIR AND BALANCE_GINTER_TYPICAL FLOOR PLAN_V1.PDF DOCUMENTS VIEW
TESTING FOR PLUMBING_WATER_TESTING_2656 E GINTER-2023-12-12_V1.PDF DOCUMENTS VIEW
SHOPDWG_PE METAL BLDG_CALCS REVIEWED_V1.PDF DOCUMENTS VIEW
SHOPDWG_PE METAL BLDG_CBRS REVIEWED_V1.PDF DOCUMENTS VIEW
SHOPDWG_PE METAL BLDG_DRAWINGS REVIEWED_V1.PDF DOCUMENTS VIEW
SHOPDWG_PE METAL BLDG_LOCREVIEWED_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CHANGE OF ADDRESS.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
JOB CARD 5152.PDF DOCUMENTS VIEW
JOB CARD 5153.PDF DOCUMENTS VIEW
JOB CARD 5154.PDF DOCUMENTS VIEW
JOB CARD 5155.PDF DOCUMENTS VIEW
PERMIT 5152.PDF DOCUMENTS VIEW
PERMIT 5153.PDF DOCUMENTS VIEW
PERMIT 5154.PDF DOCUMENTS VIEW
PERMIT 5155.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW