Permit: T21CM05153
Permit Details
Apply Date:
06/21/2021
Applicant:
Keith Campbell
Description:
New Pre-Fab Metal Industrial Building
Permit Reviews
Permit Number - T21CM05153
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/21/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/29/2021 | COMPLETED |
| 08/11/2021 | RESUBMITTAL | 09/01/2021 | COMPLETED |
| 10/12/2021 | RESUBMITTAL | 10/13/2021 | COMPLETED |
| 12/12/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/12/2023 | REQUIRES RESUBMIT |
| 12/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/15/2023 | APPROVED |
| 10/23/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/27/2023 | APPROVED |
Conditions
Permit Number - T21CM05153
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
| Date | Description | Comments |
|---|---|---|
| 08/18/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 08/18/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 08/18/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 08/18/2021 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 08/18/2021 | SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED METAL BUILDING |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM05153
Permite Description: New Pre-Fab Metal Industrial Building
Total Outstanding Inspections - 14
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2023 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Canceled | |
| 04/05/2023 | COT - LCPL - Plumbing Roof Drains | N/A | Not Applicable | |
| 01/09/2023 | COT - LCBU - Preslab | N/A | Canceled | |
| 10/26/2022 | COT - LCEL - Grounding/Bonding | N/A | Not Ready | |
| 01/09/2023 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | interior rough-in complete. system pressured to 60# psi and holding. |
| 04/28/2023 | COT - LCPL - Sewer | N/A | Not Applicable | Not applicable, building is on a septic system. |
| 04/28/2023 | COT - LCBU - Building Progress | N/A | Partial Pass | Cabinets are installed with plumbing fixtures. HVAC ductwork from main trunk to registers are being installed. Grid ceiling is installed with lights and duct registers. |
| 09/05/2023 | COT - LCEL - Outdoor Lighting | N/A | Canceled | 9/5/23: canceled per contractor |
| 09/05/2023 | COT - LCEL - Electrical Final | N/A | Canceled | |
| 09/05/2023 | COT - LCEL - Service Upgrade | N/A | Canceled | |
| 12/14/2023 | COT - LCBU - Building Final | N/A | Partial Pass | 12/14/23: Passed. Pending fire final |
| 12/15/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | FDC locking caps, knox box, fire extinguishers and riser/FACP signage. |
| 12/04/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 12/04/2023 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM05153
Permit Description: New Pre-Fab Metal Industrial Building
Total Completed Inspections - 36
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover} | |
| 08/15/2022 | COT - LCEL - Electrical Underground | Passed | {Activity date: 08/15/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
| 01/30/2023 | COT - LCME - Mechanical Intermediate | Passed | All above ceiling units and ductwork is installed in office area. Coolers and ductwork is installed in open Bay Area. | |
| 01/30/2023 | COT - LCEL - Electrical Intermediate | Passed | All electrical conduit and flex conduit is installed for outlets throughout building. Okay to Sheetrock office area. | |
| 01/30/2023 | COT - LCBU - Framing | Passed | All metal stud framing is completed in office area. Okay to Sheetrock office area. | |
| 02/21/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
| 02/21/2023 | COT - LCBU - Roof Nailing | Passed | ||
| 02/21/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 04/05/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/05/2023 | COT - LCBU - Preslab | Passed | ||
| 04/05/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 04/25/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 04/25/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
| 04/25/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 04/25/2023 | COT - LCPL - Plumbing Progress | Passed | ||
| 05/19/2023 | COT - LCBU - Building Progress | Passed | Buildings #3 and #4. | |
| 05/22/2023 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 05/22/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 05/22/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 05/22/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 09/05/2023 | BULD - Electrical Clearance | Passed | TEP ECO SUITE A and B | |
| 12/01/2023 | COT - LCBU - Sustainability | Passed | ||
| 12/01/2023 | PDSD Building Division - Sign Final | Passed | ||
| 12/01/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 12/04/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 12/04/2023 | COT - LCEL - Electrical Final | Passed | ||
| 12/14/2023 | COT - LCME - Mechanical Final | Passed | ||
| 12/14/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 12/14/2023 | COT - LCPL - Backwater Valve | Passed | ||
| 12/15/2023 | COT - FCON - Alarm - Final | Passed | ||
| 12/15/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 12/15/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 12/15/2023 | COT - LCBU - Building Final | Passed | ||
| 12/26/2023 | COT - FCON - Fire - Final | Passed | ||
| 01/05/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 01/05/2024 | ENGR Engineering Final | Passed |