Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 01/05/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 12/04/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 12/13/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | TC of O Level 4 for Building 2656 & 2636 5 panels of sidewalk at entry off of Ginter leading to 2656 are cracked continuously and are being replaced and inspection will be recalled after completion. 12” drain covers for both drainage areas of 2656 and 2636 are to be installed this week and inspection will be recalled when completed. Tension cable for 15 gal. mesquite tree is to be adjusted for building 2636. |
|
| 12/15/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | 12” overflow drain covers still need to be installed in both water harvesting locations in front of 2636 and 2656 | |
| 12/28/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | (2) 12” overflow drains in water harvesting locations to be cut and drain covers installed by 01/05/24 and sections of sidewalks replaced by the same date and recalled for inspection. |