Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 01/05/2024 | ENGR Engineering Final | Passed | ||
| 12/04/2023 | ENGR Engineering Final | Not Ready | ||
| 12/13/2023 | ENGR Engineering Final | Partial Pass | TC of O Level 4 for Building 2656 & 2636 5 panels of sidewalk at entry off of Ginter leading to 2656 are cracked continuously and are being replaced and inspection will be recalled after completion. 12” drain covers for both drainage areas of 2656 and 2636 are to be installed this week and inspection will be recalled when completed. Tension cable for 15 gal. mesquite tree is to be adjusted for building 2636. |
|
| 12/15/2023 | ENGR Engineering Final | Partial Pass | (3) steel backflow enclosures have been installed in landscape area in front of building 2636. | |
| 12/28/2023 | ENGR Engineering Final | Partial Pass | (2) 12” overflow drains in water harvesting locations to be cut and drain covers installed by 01/05/24 and sections of sidewalks replaced by the same date and recalled for inspection. |