Permit: T21CM04993
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
49 W LALO WY
Address NEW:
49 W LALO WY
Apply Date:
06/15/2021
Applicant:
Dan Kishinami
Description:
New Townhome
Permit Reviews
Permit Number - T21CM04993
Permit Status: Inspections
Permit Description: New Townhome
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2021 | 3RD PARTY REVIEW - RESIDENTIAL | 08/04/2021 | COMPLETED |
| 08/19/2021 | RESUBMITTAL | 10/04/2021 | COMPLETED |
| 04/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM04993
Permit Status: Inspections
Permit Description: New Townhome
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 01/17/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 08/04/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR CONCRETE COMPRESSIVE STRENGTH |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR RE-BAR |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR MORTAR AND GROUT |
Conditions
Permit Number - T21CM04993
Permit Status: Inspections
Permit Description: New Townhome
| Date | Description | Comments |
|---|---|---|
| 08/04/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 01/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T21CM04993
Permite Description: New Townhome
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSEL - Grounding/Bonding | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | RSBU - Building Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Outdoor Lighting | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Sustainability | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSPL - Sewer | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Construction Power | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSPL - Rough Soil | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Canceled | Inspection Canceled |
| 08/03/2023 | COT - RSEL - Electrical Underground | N/A | Partial Pass | 8/3/23: wanted to call building progress to renew permit |
| 09/20/2024 | BULD - Electrical Clearance | N/A | Not Ready | 9/20/24:not ready |
| 12/02/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 12/2/25: GFCI required at laundry/water heater room, GFCI not working at second floor bathroom, open chase at mechanical room, disconnect clearance required at mechanical room, pain clean out on exterior, knock out at mechanical room, leak repair behind refrigerator, microwave receptacle must have cover plate and cannot be further than 1/4" behind combustible material, kitchen exhaust not complete, appliances must be installed, receptacle cover plate required at garage, arc-fault required at laundry room breaker, receptacle at roof keeps tripping,supports required at refrigerant lines at roof, check all units for over amped condenser units. Water heater require lock out breakers |
| 12/02/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 12/2/25: GFCI required at laundry/water heater room, GFCI not working at second floor bathroom, open chase at mechanical room, disconnect clearance required at mechanical room, pain clean out on exterior, knock out at mechanical room, leak repair behind refrigerator, microwave receptacle must have cover plate and cannot be further than 1/4" behind combustible material, kitchen exhaust not complete, appliances must be installed, receptacle cover plate required at garage, arc-fault required at laundry room breaker, receptacle at roof keeps tripping,supports required at refrigerant lines at roof, check all units for over amped condenser units. Water heater require lock out breakers |
| 12/02/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 12/2/25: GFCI required at laundry/water heater room, GFCI not working at second floor bathroom, open chase at mechanical room, disconnect clearance required at mechanical room, pain clean out on exterior, knock out at mechanical room, leak repair behind refrigerator, microwave receptacle must have cover plate and cannot be further than 1/4" behind combustible material, kitchen exhaust not complete, appliances must be installed, receptacle cover plate required at garage, arc-fault required at laundry room breaker, receptacle at roof keeps tripping,supports required at refrigerant lines at roof, |
Completed Inspections
Permit Status: Inspections
Permit Number: T21CM04993
Permit Description: New Townhome
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2023 | RSBU - Building Progress | Passed | 8/3/23: wanted to call building progress to renew permit | |
| 07/24/2024 | COT - RSBU - Preslab | Passed | ||
| 09/24/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system | |
| 09/24/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | OK to cover exterior walls. | |
| 10/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/15/2024 | RSPL - Plumbing Progress | Passed | ||
| 10/15/2024 | RSME - Mechanical Progress | Passed | ||
| 10/31/2024 | RSEL - Electrical Progress | Passed | ||
| 11/06/2024 | BULD - Electrical Clearance | Passed | Ok to set meter and energize system. |