Status:
Complete
Type:
Commercial Building
Address:
6565 E GRANT RD
Address NEW:
6565 E GRANT RD
Apply Date:
06/11/2021
Applicant:
Description:
New single-story quickserve restaurant with drive-thru. Proposed building will be roughly 3000 squar

Permit Reviews

Permit Number - T21CM04894
Permit Status: Complete
Permit Description: New single-story quickserve restaurant with drive-thru. Proposed building will be roughly 3000 squar
Start Date Submittal Complete Date Status  
06/11/2021 3RD PARTY REVIEW - COMMERCIAL 11/24/2021 COMPLETED Review Details
10/12/2022 RESUBMITTAL 10/12/2022 ACTIVE Review Details
12/08/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.3 12/11/2023 REQUIRES RESUBMIT Review Details
12/05/2022 COMMERCIAL REVIEW - FULL v.2 12/08/2022 REQUIRES RESUBMIT Review Details
01/04/2023 COMMERCIAL REVIEW - FULL v.2 01/04/2023 APPROVED Review Details
12/12/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.6 12/14/2023 APPROVED Review Details
11/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 11/22/2023 REQUIRES RESUBMIT Review Details
10/04/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/04/2023 APPROVED Review Details
12/12/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.5 12/12/2023 REQUIRES RESUBMIT Review Details
11/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/09/2023 REQUIRES RESUBMIT Review Details
12/08/2022 COMMERCIAL REVIEW - FULL v.1 01/04/2023 REQUIRES RESUBMIT Review Details
12/11/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.4 12/11/2023 REQUIRES RESUBMIT Review Details
10/27/2022 COMMERCIAL REVIEW - FULL v.1 12/05/2022 REQUIRES RESUBMIT Review Details
08/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/28/2023 APPROVED Review Details
01/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/30/2023 APPROVED Review Details

Conditions

Permit Number - T21CM04894
Permit Status: Complete
Permit Description: New single-story quickserve restaurant with drive-thru. Proposed building will be roughly 3000 squar
Date Description Comments
12/11/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
11/24/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
11/24/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
11/24/2021 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
11/24/2021 SHOP DRAWINGS REQUIRED FOR PREFABRICATED WOOD TRUSSES
11/24/2021 SPECIAL INSPECTION FOR POST INSTALLED ANCHORS
11/09/2023 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/09/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM04894
Permite Description: New single-story quickserve restaurant with drive-thru. Proposed building will be roughly 3000 squar
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
01/09/2023 COT - HCPL - Rough Soil N/A Partial Pass Inside building; grease trap remains to be inspected.
02/08/2023 COT - HCEL - Electrical Underground N/A Partial Pass Looked at pre-slab, which builder was unable to schedule.
05/12/2023 COT - HCBU - Framing N/A Partial Pass 5-12-23: Metal Kitchen hood wall and office.
08/17/2023 FCON – Fire – Intermediate N/A Not Ready 200 lb test for two hours is required. not ready.
08/22/2023 COT - HCPL - Medical Gas Preconstruction Mtg N/A Not Applicable
08/22/2023 COT - HCPL - Medical Gas/Final N/A Not Applicable N/A
08/22/2023 COT - HCPL - Medical Gas/Test N/A Not Applicable N/A
08/22/2023 COT - HCEL - Electrical Progress N/A Not Ready
11/08/2023 ENGR Engineering Final N/A Not Ready ADA parking lacks van accessible parking slot and signage, not built per plan.
COT - FCON - Sprinkler - Final N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM04894
Permit Description: New single-story quickserve restaurant with drive-thru. Proposed building will be roughly 3000 squar
Total Completed Inspections - 37
Date Description Inspector Results Comments
01/09/2023 COT - HCPL - Sewer Passed
02/08/2023 COT - HCBU - Stem Wall/Retaining Wall Passed Mono-pour. pre-slab is approved.
05/12/2023 COT - HCBU - Roof Nailing Passed
05/12/2023 COT - HCPL - Rough Soil Passed
05/12/2023 COT - HCEL - Electrical Intermediate Passed
05/12/2023 COT - HCBU - Exterior Clips/Sheathing Passed
05/19/2023 COT - LCME - Mechanical Intermediate Passed 5-19-24: Hard lids.
05/19/2023 COT - HCPL - Plumbing Intermediate Passed 5-19-24: Including roof drains.
05/19/2023 COT - HCPL - Gas Pressure Test Passed
06/16/2023 COT - HCPL - Yard Water Line Passed 6/5/23: yard water service tested at 92 psi. Approved to cover.
6/16/23: water service from meter to back flow approved to cover.
07/14/2023 COT - HCBU - Building Progress Passed Lath
08/16/2023 COT - HCBU - Building Above Ceiling Passed
08/17/2023 COT - LCME - Kitchen Hood Passed
08/17/2023 COT - HCEL - Electrical Underground Passed
08/17/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
08/17/2023 COT - HCPL - Plumbing Progress Passed
08/17/2023 COT - HCBU - Framing Passed
08/22/2023 COT - HCPL - Plumbing Above Ceiling Passed
08/22/2023 COT - HCEL - Electrical Above Ceiling Passed
08/22/2023 COT - HCBU - Preslab Passed
08/22/2023 COT - HCBU - Masonry Pregrout Passed
08/22/2023 COT - HCBU - Interior Shear Bracing Passed
08/22/2023 COT - LCME - Mechanical Above Ceiling Passed
08/22/2023 COT - HCPL - Plumbing Roof Drains Passed
08/22/2023 COT - HCEL - Grounding/Bonding Passed
08/22/2023 COT - LCME - Mechanical Progress Passed
10/27/2023 COT - HCEL - Outdoor Lighting Passed
11/07/2023 COT - HCEL - Electrical Final Passed
11/07/2023 COT - LCME - Mechanical Final Passed
11/07/2023 COT - HCBU - Building Final Passed
11/07/2023 SITE - Zoning Final Passed
11/07/2023 COT - HCEL - Electrical Progress Passed
11/08/2023 COT - HCPL - Plumbing Final Passed
11/15/2023 COT - FCON - Sprinkler - Final Passed
11/15/2023 COT - FCON - Fire - Final Passed
11/15/2023 COT - FCON - Alarm - Final Passed Approved on 11/14/23 on permit TF-FCP-0523-00692
11/15/2023 COT - FCON - Hood System - Final Passed Approved on 11/14/23 on permit TF-FCP-1123-01296

Documents

File Name Document Type  
TEST AND BALANCE REPORT 11-07-23__V1.PDF DOCUMENTS VIEW
22-063M CONCRETE LETTER AND REVISED REPORT_V1.PDF DOCUMENTS VIEW
CITY APPROVED POP 685 SUBMITTAL 1 - TRUSSES_KREHER 07-13-22_V1_CITY APPROVED_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
POPEYES 685 CHLORINATION REPORT 10-03-23-2023-10-31_V1.PDF DOCUMENTS VIEW
POPEYES ON GRANT SPECIAL INSPECTION PACKET-2023-10-30_V1.PDF DOCUMENTS VIEW
SHEAR WALL - WOOD INSPECTION POPEYES GRANT RD_V1.PDF DOCUMENTS VIEW
TEST AND BALANCE REPORT 11-07-23__V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
POPEYES 685 CHLORINATION REPORT 10-03-23-2023-10-03_V1.PDF DOCUMENTS VIEW
POPEYES 685 SPECIAL INSPECTION CERTIFICATE - SIGNED BY OWNER-2023-08-23_V1.PDF DOCUMENTS VIEW
POP 685 SUBMITTAL 1 - TRUSSES_KREHER 07-13-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_CUTSHEETS_ELECT_V1_V1.PDF DOCUMENTS VIEW
1_ENVELOPE COMCHECK_V1_V1.PDF DOCUMENTS VIEW
1_LIGHTING AND MECHANICAL COMCHECKS_V1_V1.PDF DOCUMENTS VIEW
1_PSA 20-00089_STANTEC_V1_V1.PDF DOCUMENTS VIEW
1_SPEC_INSPEC_CERT-2022-10-27_V1-2022-12-05_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS_V1_V1.PDF DOCUMENTS VIEW
2_GEOTECH REPORT 2_V1_V1.PDF DOCUMENTS VIEW
2_GEOTECH REPORT_V1_V1.PDF DOCUMENTS VIEW
5_PLAN SET_ZONING - POPEYES TUCSON (GRANT) FS 2022-12-08_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
CONS-2_CONDITIONAL APPROVAL_V1_V1.PDF DOCUMENTS VIEW
GCL_V1_V1.PDF DOCUMENTS VIEW
1_CUTSHEETS_ELECT_V1_V1.PDF DOCUMENTS VIEW
1_ENVELOPE COMCHECK_V1_V1.PDF DOCUMENTS VIEW
1_LIGHTING AND MECHANICAL COMCHECKS_V1_V1.PDF DOCUMENTS VIEW
1_PSA 20-00089_STANTEC_V1_V1.PDF DOCUMENTS VIEW
1_SPEC_INSPEC_CERT-2022-10-27_V1-2022-12-05_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS_V1_V1.PDF DOCUMENTS VIEW
2_GEOTECH REPORT 2_V1_V1.PDF DOCUMENTS VIEW
2_GEOTECH REPORT_V1_V1.PDF DOCUMENTS VIEW
5_PLAN SET_ZONING - POPEYES TUCSON (GRANT) FS 2022-12-08_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
CONS-2_CONDITIONAL APPROVAL_V1_V1.PDF DOCUMENTS VIEW
GCL_V1_V1.PDF DOCUMENTS VIEW
1_CUTSHEETS_ELECT_V1.PDF DOCUMENTS VIEW
1_ENVELOPE COMCHECK_V1.PDF DOCUMENTS VIEW
1_GEOTECH_V1.PDF DOCUMENTS VIEW
1_LIGHTING AND MECHANICAL COMCHECKS_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
1_PSA 20-00089_STANTEC_V1.PDF DOCUMENTS VIEW
1_SPEC_INSPEC_CERT-2022-10-27_V1.PDF DOCUMENTS VIEW
2_CIVIL IMPROVEMENT PLAN SET(FIR REFERENCE ONLY)_V1.PDF DOCUMENTS VIEW
2_CONDITIONAL APPROVAL_V1.PDF DOCUMENTS VIEW
2_GEOTECH REPORT 2_V1.PDF DOCUMENTS VIEW
2_GEOTECH REPORT_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
2_RESPONSE LETTER TO COMMENTS_V1.PDF DOCUMENTS VIEW
2_SIC-2022-10-27_V1.PDF DOCUMENTS VIEW
2022-10-11 - UPDATE TO T21CM04894_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
GCL_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW