Inspection Status: Not Ready
Inspection History: SITE - Zoning Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/11/2023 |
SITE - Zoning Final
|
|
Not Ready |
electrical transformer still needs installing, dead plants need replacing, and two inflows into storm water basin (on north side) need riprap installed. |
| 10/03/2023 |
SITE - Zoning Final
|
|
Not Ready |
no electricity |
| 10/27/2023 |
SITE - Zoning Final
|
|
Not Ready |
Nick, please schedule all remaining required inspections from development package DP 21–0108. |
| 11/07/2023 |
SITE - Zoning Final
|
|
Passed |
|