Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/24/2021
Applicant:
Alan Simpson
Description:
New 288 unit multi family apartment project of type v-b construction with tenant amenities and outdo

Permit Reviews

Permit Number - T21CM04376
Permit Status: Complete
Permit Description: New 288 unit multi family apartment project of type v-b construction with tenant amenities and outdo
Start Date Submittal Complete Date Status  
05/25/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 07/07/2021 COMPLETED Review Details
07/23/2021 RESUBMITTAL 09/01/2021 COMPLETED Review Details
08/29/2022 REVISION - - 1ST 09/12/2022 COMPLETED Review Details
09/10/2021 RESUBMITTAL 10/04/2021 COMPLETED Review Details
02/21/2023 COMMERCIAL REVIEW - FULL v.2 03/16/2023 REQUIRES RESUBMIT Review Details
04/10/2023 COMMERCIAL REVIEW - FULL v.3 05/02/2023 APPROVED Review Details
10/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/17/2023 APPROVED Review Details
02/16/2023 COMMERCIAL REVIEW - FULL v.1 02/21/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM04376
Permite Description: New 288 unit multi family apartment project of type v-b construction with tenant amenities and outdo
Total Outstanding Inspections - 23
Last Inspection Date Description Inspector Results Comments
03/02/2022 COT - LCPL - Backwater Valve N/A Canceled {Activity date: 03/02/2022; Status: Not Applicable; Inspector: TGAUSP; Comment: Entered by VVERA1 - NA}
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
11/22/2022 COT - LCPL - Plumbing Intermediate N/A Re-inspection required
10/26/2022 COT - HCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
11/17/2022 COT - LCEL - Electrical Intermediate N/A Partial Pass partial approval
11/16/2022 COT - LCBU - Building Above Ceiling N/A Re-inspection required
11/22/2022 COT - LCME - Mechanical Intermediate N/A Re-inspection required
12/14/2022 COT - LCPL - Plumbing Progress N/A Not Ready
12/01/2022 COT - LCME - Mechanical Above Ceiling N/A Re-inspection required (with fee) dry vents still not protected with nail stops
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
09/01/2023 BULD - Electrical Clearance N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/13/2023 COT - FCON - Alarm - Final N/A Partial Pass Flow switches need to be named correctly.
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
12/01/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass first floor building A only
11/24/2023 COT - LCBU - Masonry Pregrout N/A Not Applicable
11/29/2023 COT - LCME - Kitchen Hood N/A Not Applicable
11/24/2023 COT - LCBU - Sustainability N/A Not Applicable
11/27/2023 ENGR Engineering Final N/A Partial Pass contractor needs to stake the trees on building, four and two patch some of the curb and remove the fence and the Porta John. Good for level 3TCO.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM04376
Permit Description: New 288 unit multi family apartment project of type v-b construction with tenant amenities and outdo
Total Completed Inspections - 34
Date Description Inspector Results Comments
03/02/2022 COT - LCPL - Rough Soil Passed {Activity date: 03/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to backfill}
05/05/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 05/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
06/09/2022 COT - FCON - Underground Pressure Passed {Activity date: 06/09/2022; Status: Approved; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - }
10/04/2022 COT - LCBU - Roof Nailing Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to dry in roof system.}
10/20/2022 COT - FCON - Underground Flush Passed {Activity date: 10/20/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - UG piping and flush was approved on permit T21FC00895 on 8/30/22}
11/14/2022 COT - LCBU - Exterior Clips/Sheathing Passed
11/28/2022 COT - LCBU - Building Above Ceiling Passed
11/28/2022 COT - LCME - Mechanical Intermediate Passed all intermediaries.
11/28/2022 COT - LCEL - Electrical Above Ceiling Passed
12/01/2022 COT - LCEL - Electrical Progress Passed
12/22/2022 COT - LCPL - Plumbing Progress Passed
12/22/2022 COT - LCME - Mechanical Above Ceiling Passed
12/22/2022 COT - LCME - Mechanical Progress Passed
03/13/2023 COT - LCBU - Excavation/Rebar/Zoning Passed Completed to call him footers north side of building one OK to Place CONCRETE
09/28/2023 BULD - Electrical Clearance Passed 9/28/23 ok for clearance ECO, UNITS 2301,2302, 2303, 2203, 2202, 2201, 2101, 2102, 2103 and H2A
10/04/2023 COT - LCPL - Plumbing Final Passed
10/04/2023 COT - LCME - Mechanical Final Passed
10/04/2023 COT - LCEL - Electrical Final Passed
10/04/2023 COT - LCBU - Building Final Passed
10/13/2023 COT - FCON - Sprinkler - Final Passed
10/17/2023 COT - FCON - Alarm - Final Passed
10/17/2023 COT - HCPL - Plumbing Final Passed
10/20/2023 COT - FCON - Fire - Final Passed
10/20/2023 FCON – OH Piping & Hydro Passed
11/29/2023 COT - LCBU - Framing Passed
11/24/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
11/24/2023 COT - LCPL - Sewer Passed
11/24/2023 COT - LCEL - Outdoor Lighting Passed
11/24/2023 COT - HCBU - Interior Shear Bracing Passed
11/24/2023 COT - LCEL - Electrical Underground Passed
11/24/2023 COT - LCBU - Building Progress Passed
11/29/2023 COT - LCBU - Preslab Passed
12/01/2023 ENGR Engineering Final Passed
11/30/2023 COT - HCBU - Building Final Passed Ok for C OF O

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
WATER STERILIZATION REPORT-2023-10-16_V1.PDF DOCUMENTS VIEW
WATER STERILIZATION REPORT-2023-10-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT -WRONG MISSING INFO.PDF DOCUMENTS VIEW
SPECS VOL 1.PDF DOCUMENTS VIEW
SPECS VOL 2.PDF DOCUMENTS VIEW
STRUCTURAL CALCS VOL 1.PDF DOCUMENTS VIEW
STRUCTURAL CALCS VOL 2.PDF DOCUMENTS VIEW
STRUCTURAL CALCS VOL A.PDF DOCUMENTS VIEW
TRAFFIC IMPACT ANALYSIS.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW
ONE TIME BOND EXEMPT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW