Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/27/2021
Applicant:
Scott Martinez
Description:
Renovation of existing City of Tucson ParkNew Building Improvements Include. Plans and details for

Permit Reviews

Permit Number - T21CM03545
Permit Status: Complete
Permit Description: Renovation of existing City of Tucson ParkNew Building Improvements Include. Plans and details for
Start Date Submittal Complete Date Status  
04/28/2021 COMMERCIAL - NEW 07/07/2021 COMPLETED Review Details
07/07/2021 RESUBMITTAL 07/21/2021 COMPLETED Review Details
07/21/2021 RESUBMITTAL 04/18/2022 COMPLETED Review Details
09/03/2022 REVISION - - 1ST 10/17/2022 COMPLETED Review Details
05/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/02/2023 APPROVED Review Details
05/15/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/16/2023 APPROVED Review Details

Conditions

Permit Number - T21CM03545
Permit Status: Complete
Permit Description: Renovation of existing City of Tucson ParkNew Building Improvements Include. Plans and details for
Date Description Comments
05/13/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
05/13/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/13/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
05/13/2021 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
05/13/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
05/13/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
05/13/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
05/24/2021 SPECIAL INSPECTION REQUIRED FOR OUTDOOR LIGHTING
10/17/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM03545
Permite Description: Renovation of existing City of Tucson ParkNew Building Improvements Include. Plans and details for
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Sewer N/A Not Ready
11/18/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass PARTIAL for Ramada south of Shower Bldg
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCPL - Yard Water Line N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCEL - Construction Power N/A Not Ready
03/01/2023 COT - LCEL - Temporary Service N/A Not Applicable
05/15/2023 COT - LCBU - Building Final N/A Not Ready
05/15/2023 COT - LCEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM03545
Permit Description: Renovation of existing City of Tucson ParkNew Building Improvements Include. Plans and details for
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/29/2022 COT - LCBU - Roof Nailing Passed {Activity date: 09/29/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
01/10/2023 COT - LCBU - Masonry Pregrout Passed
02/03/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
03/01/2023 COT - LCBU - Stem Wall/Retaining Wall Passed
03/01/2023 COT - LCBU - Preslab Passed
03/01/2023 COT - LCPL - Rough Soil Passed
03/01/2023 COT - LCPL - Yard Water Line Passed
03/01/2023 COT - LCBU - Building Progress Passed
03/01/2023 COT - LCEL - Electrical Underground Passed
04/13/2023 COT - LCEL - Grounding/Bonding Passed S.E.S, pump room, new bathrooms and existing bathrooms are all grounded and bonded. 4/13/2023
04/13/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 5702 S. Campbell Ave Gunny Park
05/05/2023 COT - LCPL - Plumbing Intermediate Passed Stainless steel fixtures are installed and operational in both restroom buildings for Men's & Women's restrooms.
05/05/2023 COT - LCEL - Service Upgrade Passed 5-5-23: Service Entrance Section is installed and energized.
05/05/2023 COT - LCEL - Electrical Above Ceiling Passed 5-5-23: Electrical intermediate is complete for restrooms and pump room for splash pad. Panels are installed, wired, and properly labeled.
05/05/2023 COT - LCBU - Framing Passed Framing for gates and restrooms enclosure is complete.
05/05/2023 COT - LCBU - Building Above Ceiling Passed
05/05/2023 COT - LCEL - Electrical Intermediate Passed 5-5-23: Electrical intermediate is complete for restrooms and pump room for splash pad. Panels are installed, wired, and properly labeled.
05/05/2023 COT - LCEL - Outdoor Lighting Passed Outdoor lighting is being programmed to function automatically or remotely. All light poles & fixtures are installed.
05/19/2023 COT - LCPL - Plumbing Final Passed
05/19/2023 COT - LCBU - Building Final Passed
05/19/2023 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
2023_05_17 GUNNY BARRERAS PARK REPORT-2023-05-18_V1.PDF DOCUMENTS VIEW
T21CM03545 APPROVED TRUSS CALCS_V1.PDF DOCUMENTS VIEW
T21CM03545 APPROVED TRUSS LAYOUT_V1.PDF DOCUMENTS VIEW
FINAL REPORT 2305-059 PHILLIP'S PLUMBING-2023-05-12_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REV APPLICATION.PDF DOCUMENTS VIEW
REV1_PREENGINEERED RAMADA.PDF DOCUMENTS VIEW
REV1_TRUSS DEFERRED SUBMITTAL_CALCS AZ.PDF DOCUMENTS VIEW
REV1_TRUSS DEFERRED SUBMITTAL_PLACEMENT PLAN.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW