Permit: T21CM03542
Permit Details
Apply Date:
04/27/2021
Applicant:
Andrew Denton
Description:
Renovation of existing multi-family apartment building.
Permit Reviews
Permit Number - T21CM03542
Permit Status: Complete
Permit Description: Renovation of existing multi-family apartment building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2022 | REVISION - - 1ST | 03/10/2022 | COMPLETED |
| 03/11/2022 | REVISION - - 1ST | 03/23/2022 | COMPLETED |
| 04/28/2021 | COMMERCIAL - TI | 06/10/2021 | COMPLETED |
| 07/07/2021 | RESUBMITTAL | 07/29/2021 | COMPLETED |
| 10/25/2021 | RESUBMITTAL | 10/25/2021 | COMPLETED |
| 10/19/2023 | RESTAMP - COMMERCIAL v.1 | 10/19/2023 | APPROVED |
| 08/02/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/03/2023 | REQUIRES RESUBMIT |
| 01/10/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/24/2023 | REQUIRES RESUBMIT |
| 01/16/2024 | RESTAMP - COMMERCIAL v.1 | 01/16/2024 | APPROVED |
| 02/16/2023 | COMMERCIAL REVIEW - FULL v.3 | 02/28/2023 | APPROVED |
| 04/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/19/2024 | APPROVED |
| 08/03/2023 | COMMERCIAL REVIEW - FULL v.2 | 08/14/2023 | REQUIRES RESUBMIT |
| 12/15/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/03/2024 | REQUIRES RESUBMIT |
| 01/10/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/16/2024 | APPROVED |
| 02/16/2023 | COMMERCIAL REVIEW - FULL v.2 | 02/16/2023 | REQUIRES RESUBMIT |
| 10/02/2023 | COMMERCIAL REVIEW - FULL v.3 | 10/19/2023 | APPROVED |
Conditions
Permit Number - T21CM03542
Permit Status: Complete
Permit Description: Renovation of existing multi-family apartment building.
| Date | Description | Comments |
|---|---|---|
| 04/16/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03542
Permite Description: Renovation of existing multi-family apartment building.
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - FCON - Underground Pressure | N/A | Not Ready | ||
| 04/11/2023 | COT - LCME - Mechanical Above Ceiling | N/A | Partial Pass | rooms 109,111,113,209,211,213 ok to proceed |
| 04/28/2023 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 4-28-23: Units 102-108, and 201-208. |
| 05/17/2023 | COT - LCBU - Framing | N/A | Partial Pass | 5-17-23: Framing is good, left for firewall inspections. |
| 07/10/2023 | COT - HCBU - Preslab | N/A | Partial Pass | The footer and the slab area has been approved for placement of concrete for the trash and closure on the site. Additional inspections Will be required for the structure in the following areas. Once the walls have been constructed up to the 4 foot level, internal grout will be required and a final inspection for the completion of the wall placement of the grout for the upper 2 feet will also be required. |
| 02/05/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 2/5/24: reinforcement per plan at Ramada columns ok to grout first lift at 4', ok to proceed |
| 04/08/2024 | COT - LCME - Kitchen Hood | N/A | Not Applicable | |
| 06/22/2023 | COT - LCEL - Outdoor Lighting | N/A | Canceled | |
| 03/30/2023 | COT - HCPL - Sewer | N/A | Partial Pass | Partial. 3" sewer line under pressure with tracer wire for all units. Okay to backfill progress areas. Shading required. 3/30/2023 |
| 03/30/2023 | COT - HCPL - Rough Soil | N/A | Not Ready | |
| 04/08/2024 | COT - LCBU - Sustainability | N/A | Not Applicable | |
| 10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
| 08/07/2023 | COT - LCBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03542
Permit Description: Renovation of existing multi-family apartment building.
Total Completed Inspections - 30
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 07/26/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/25/2022; Status: Correction Required; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - correction required. Replace 4 sheets of plywood. Re nail sheets of plywood throughout the field.} | |
| 12/09/2022 | COT - LCPL - Plumbing Progress | Passed | ||
| 04/06/2023 | COT - LCEL - Electrical Above Ceiling | Passed | Units101-103-105-107/ 201-203-205-207 intermediates approved. Okay to insulate and drywall. 4/6/2023 | |
| 04/11/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 04/11/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 04/11/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 04/11/2023 | COT - HCPL - Plumbing Progress | Passed | ||
| 04/11/2023 | COT - LCBU - Building Progress | Passed | ||
| 04/28/2023 | COT - LCPL - Plumbing Intermediate | Passed | 4-28-23: Units 102-108, and 201-208. | |
| 05/17/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
| 05/17/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 05/17/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
| 05/24/2023 | COT - LCBU - Framing | Passed | ||
| 08/15/2023 | BULD - Electrical Clearance | Passed | TEP ECO units: 101,102,103,104,105,106,107,108,109,110,111,112,113,114 201,202,203,204,205,206,207,208,209,210,211,212,213,214 |
|
| 09/15/2023 | COT - LCEL - Electrical Final | Passed | House Panel H | |
| 12/21/2023 | COT - HCPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 12/21/2023 | |
| 02/15/2024 | COT - HCBU - Preslab | Passed | 2/5/24: reinforcement per plan at Ramada columns ok to grout first lift at 4', ok to proceed 2/15/24: reinforcement per plan at Ramada columns ok to grout second lift Top out. |
|
| 02/29/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 04/08/2024 | COT - LCME - Mechanical Final | Passed | ||
| 04/08/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/08/2024 | COT - FCON - Underground Flush | Passed | Flushed at a previous date. | |
| 04/08/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
| 04/17/2024 | COT - FCON - Alarm - Final | Passed | Approved on 4/9/24 on permit TF-FCP-00224-00114 | |
| 04/08/2024 | COT - HCPL - Sewer | Passed | ||
| 04/08/2024 | COT - HCPL - Rough Soil | Passed | ||
| 04/08/2024 | FCON – OH Piping & Hydro | Passed | ||
| 04/08/2024 | COT - LCPL - Plumbing Final | Passed | ||
| 04/15/2024 | COT - LCBU - Building Final | Passed | ||
| 04/17/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 04/17/2024 | COT - FCON - Fire - Final | Passed |