Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/12/2021
Applicant:
Ginger Schaad
Description:
New Apartment Building #1

Permit Reviews

Permit Number - T21CM01303
Permit Status: Complete
Permit Description: New Apartment Building #1
Start Date Submittal Complete Date Status  
01/04/2022 RESUBMITTAL 03/02/2022 COMPLETED Review Details
02/16/2021 COMMERCIAL - NEW 04/02/2021 COMPLETED Review Details
10/13/2021 RESUBMITTAL 11/08/2021 COMPLETED Review Details
12/02/2021 RESUBMITTAL 12/17/2021 COMPLETED Review Details
08/28/2024 COMMERCIAL REVIEW - FULL v.2 08/29/2024 REQUIRES RESUBMIT Review Details
07/22/2024 COMMERCIAL REVIEW - FULL v.1 07/23/2024 REQUIRES RESUBMIT Review Details
09/09/2024 COMMERCIAL REVIEW - FULL v.3 09/10/2024 APPROVED Review Details

Conditions

Permit Number - T21CM01303
Permit Status: Complete
Permit Description: New Apartment Building #1
Date Description Comments
05/24/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM01303
Permite Description: New Apartment Building #1
Total Outstanding Inspections - 27
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - LCBU - Building Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Construction Power N/A Canceled Inspection Canceled
11/04/2022 COT - FCON - Underground Flush N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Medical Gas Preconstruction Mtg N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Sustainability N/A Canceled Inspection Canceled
11/04/2022 FCON – OH Piping & Hydro N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Building Progress N/A Canceled Inspection Canceled
11/04/2022 COT - FCON - Underground Pressure N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Medical Gas/Test N/A Canceled Inspection Canceled
07/12/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar N/A Partial Pass partial approval for exterior footers only, UFER not installed at this time, building 1 only
11/22/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass Level one.
01/10/2024 COT - LCME - Mechanical Intermediate N/A Not Ready
12/26/2023 COT - HCBU - Interior Shear Bracing N/A Not Ready Not ready 12/26/2023
09/29/2023 COT - LCPL - Plumbing Roof Drains N/A Re-inspection required 9/29/23: Not ready, still working on roof drains.
01/29/2024 COT - LCPL - Plumbing Progress N/A Partial Pass Second floor drop ceiling approved. All third floor units MEP´S but 2303 not ready. Pex leaking at bathroom and water heater. 1/29/2024
01/29/2024 COT - LCME - Mechanical Progress N/A Partial Pass Second floor drop ceiling approved. All third floor units MEP´S but 2303 not ready. Pex leaking at bathroom and water heater. 1/29/2024
07/19/2024 COT - BULD - SWG Clearance N/A Not Applicable
07/19/2024 FCON – Fire – Intermediate N/A Not Applicable
07/19/2024 COT - LCPL - Gas Final N/A Not Applicable
07/19/2024 COT - LCPL - Gas Pressure Test N/A Not Applicable
07/24/2024 COT - LCEL - Grounding/Bonding N/A Partial Pass Partial approval waiting for ADA unit clarification for TCO
09/17/2024 COT - HCBU - TCO N/A Not Ready 9/17/24 no access to site, no accurate contact info on notes. Please leave contact info for access
09/17/2024 COT - HCPL - Rough Soil N/A Not Ready Added to permit to allow scheduling when ready.
09/17/2024 COT - HCBU - Framing N/A Not Ready Added to permit to allow scheduling when ready.
09/20/2024 COT - HCEL - Electrical Intermediate N/A Not Ready Added to permit to allow scheduling when ready.
11/22/2023 COT - LCEL - Electrical Intermediate N/A Partial Pass Level one.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM01303
Permit Description: New Apartment Building #1
Total Completed Inspections - 33
Date Description Inspector Results Comments
06/30/2023 COT - LCPL - Rough Soil Passed
06/30/2023 COT - LCPL - Sewer Passed
07/21/2023 COT - LCBU - Preslab Passed
09/27/2023 COT - LCBU - Roof Nailing Passed
09/27/2023 COT - HCBU - Exterior Clips/Sheathing Passed
12/06/2023 COT - LCPL - Plumbing Intermediate Passed 12/6/23: plumbing okay all requested fixes have been done
01/12/2024 COT - LCME - Mechanical Intermediate Passed HVAC units installed in all individual rooms in North structure.
02/16/2024 COT - HCBU - Firewall/Fire Barrier/Firestop Passed Unit #2 drywall is properly installed and secured on the 3rd floor ceiling of each apartment. Okay to tape and texture all walls and ceilings.
06/26/2024 BULD - Electrical Clearance Passed
07/03/2024 COT - LCPL - Backwater Valve Passed
07/10/2024 COT - FCON - Alarm - Final Passed
07/19/2024 COT - LCPL - Plumbing Roof Drains Passed
07/19/2024 COT - LCPL - Plumbing Progress Passed
07/19/2024 COT - LCME - Mechanical Progress Passed
07/22/2024 TRSP - ROW - Final/Close-Out Passed
07/19/2024 COT - FCON - Sprinkler - Final Passed Passed by W. Motto
07/19/2024 COT - LCPL - Plumbing Above Ceiling Passed
07/19/2024 COT - LCEL - Electrical Above Ceiling Passed
07/19/2024 COT - LCEL - Electrical Progress Passed
07/19/2024 COT - LCEL - Electrical Underground Passed
07/19/2024 COT - LCEL - Outdoor Lighting Passed
07/19/2024 COT - LCME - Mechanical Above Ceiling Passed
07/25/2024 COT - LCEL - Grounding/Bonding Passed
09/30/2024 COT - LCEL - Electrical Intermediate Passed
09/30/2024 COT - HCPL - Plumbing Intermediate Passed 9/30/24: for ada apartment
09/30/2024 COT - HCME - Mechanical Intermediate Passed 9/30/24: for ada apartment
10/10/2024 COT - LCBU - Framing Passed
12/31/2024 COT - LCBU - Building Final Passed
12/31/2024 COT - FCON - Fire - Final Passed Approved by Will Motto
12/31/2024 COT - LCME - Mechanical Final Passed
12/31/2024 ENGR Engineering Final Passed
12/31/2024 COT - LCEL - Electrical Final Passed
12/31/2024 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STAMPED COMCHECK 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STAMPED SOILS REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLEVUE APARTMENTS_BDG RESPONSE LETTER 9.9.24_B_V1.PDF DOCUMENTS VIEW
CONS-BELLEVUE APTS_CD_9-9-24_B_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
STAMPED SOILS REPORT.PDF DOCUMENTS VIEW
STAMPED COMCHECK.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW