Inspection Status: Canceled
Inspection History: COT - LCEL - Electrical Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2022 |
COT - LCEL - Electrical Intermediate |
|
Canceled |
Inspection Canceled |
| 01/10/2024 |
COT - LCEL - Electrical Intermediate |
|
Not Ready |
|
| 01/25/2024 |
COT - LCEL - Electrical Intermediate |
|
Not Ready |
Not ready. Drop ceilings penetrations needs to be sealed off. Exhaust fans not wired. Registers need to be blocked on three sides. Duct work incomplete. 1/25/24 |
| 01/29/2024 |
COT - LCEL - Electrical Intermediate |
|
Partial Pass |
Second floor drop ceiling approved. All third floor units MEP“S but 2303 not ready. Pex leaking at bathroom and water heater. 1/29/2024 |
| 02/21/2024 |
COT - LCEL - Electrical Intermediate |
|
Passed |
2/21/24: Smoke detectors are installed throughout building, missing receptacles have been installed. |
| 09/17/2024 |
COT - LCEL - Electrical Intermediate |
|
Not Ready |
Added to permit to allow scheduling when ready. |
|
COT - LCEL - Electrical Intermediate |
|
Passed |
|
| 11/22/2023 |
COT - LCEL - Electrical Intermediate |
|
Partial Pass |
Level one. |
| 12/04/2023 |
COT - LCEL - Electrical Intermediate |
|
Re-inspection required |
Not ready missing smoke detectors add receptacle in bedroom that's over 12' 2nd floor. 12/4/2023 |
| 12/07/2023 |
COT - LCEL - Electrical Intermediate |
|
Partial Pass |
Partial pass. 2nd floor electrical okay to proceed progress areas. 12/7/2023 |