Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM01185
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
1360 W SENTINEL VIEW LP
Address NEW:
1360 W SENTINEL VIEW LP
Apply Date:
02/09/2021
Applicant:
Description:
SFR MPLAN1510 T20-M0040
Permit Reviews
Permit Number - T21CM01185
Permit Status: Issued
Permit Description: SFR MPLAN1510 T20-M0040
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/14/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 05/15/2025 | REQUIRES RESUBMIT |
| 05/16/2025 | RESIDENTIAL NEW DWELLING REVISION v.2 | 06/20/2025 | APPROVED |
| 08/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/25/2025 | REQUIRES RESUBMIT |
| 05/14/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 05/14/2025 | REQUIRES RESUBMIT |
| 09/19/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/22/2025 | APPROVED |
| 07/22/2024 | RESIDENTIAL NEW DWELLING v.1 | 08/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM01185
Permit Status: Issued
Permit Description: SFR MPLAN1510 T20-M0040
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/22/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - T21CM01185
Permit Status: Issued
Permit Description: SFR MPLAN1510 T20-M0040
| Date | Description | Comments |
|---|---|---|
| 02/09/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 01/27/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 01/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/19/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/19/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/25/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/19/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM01185
Permite Description: SFR MPLAN1510 T20-M0040
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 01/17/2023 | COT - RSPL - Sewer | N/A | Partial Pass | Maintain permit activity |
| 05/12/2025 | RSME - Mechanical Progress | N/A | Partial Pass | |
| 05/12/2025 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 5-12-25, pex lines not per plans-make corrections/transitions from 3/4" to 1" where required by plans, DWV not under test, add strapping to all DWV upstairs, firefoam all penetrations. Also, pex lines require a 12” clearance from recessed/can lights. Relocate pex to provide 12” clearance or block with osb, plywood, 2x4’s, drywall. (ic rating for light relates to insulation). |
| 05/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | 5/21/25 1. Partial pass; Okay to proceed with drywall on firewalls. |
| 09/03/2025 | BULD - Electrical Clearance | N/A | Not Ready | 9.3.2025 Not ready, needs grounded. |
| 05/14/2025 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 5-12-25, pex lines not per plans-make corrections/transitions from 3/4" to 1" where required by plans, DWV not under test, add strapping to all DWV upstairs, firefoam all penetrations. 5/14/25: IPC T308.5 DWV must be supported midway on vertical runs, IPC T308.5 DWV must be supported every 4' on horizontal runs, IRC R302.11 blocking/ draft stop required at drop ceiling at main floor, IRC R302.11 all penetrations must be sealed through top plates and vapor barrier, IFGC G2424.1 support gas piping at range in wall, up stairs double lav must be properly pitched, DWV not fully under test, Vent at main floor bathroom cannot terminate in between floors, nail plates missing throughout, proper nail plates required at plumbing walls. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM01185
Permit Description: SFR MPLAN1510 T20-M0040
Total Completed Inspections - 14