Permit: T21CM01185

Parcel: 116214570

Inspection Status: Not Ready

Inspection History: COT - RSPL - Gas Pressure Test 

Permit Number - T21CM01185

Inspection Description - COT - RSPL - Gas Pressure Test 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Gas Pressure Test  Not Ready
COT - RSPL - Gas Pressure Test  Not Ready 5-12-25, not ready.
05/14/2025 COT - RSPL - Gas Pressure Test  Re-inspection required 5-12-25, pex lines not per plans-make corrections/transitions from 3/4" to 1" where required by plans, DWV not under test, add strapping to all DWV upstairs, firefoam all penetrations.
5/14/25: IPC T308.5 DWV must be supported midway on vertical runs, IPC T308.5 DWV must be supported every 4' on horizontal runs, IRC R302.11 blocking/ draft stop required at drop ceiling at main floor, IRC R302.11 all penetrations must be sealed through top plates and vapor barrier, IFGC G2424.1 support gas piping at range in wall, up stairs double lav must be properly pitched, DWV not fully under test, Vent at main floor bathroom cannot terminate in between floors, nail plates missing throughout, proper nail plates required at plumbing walls. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
09/16/2025 COT - RSPL - Gas Pressure Test  Passed