Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/28/2021
Applicant:
Description:
OFFICE

Permit Reviews

Permit Number - T21CM00886
Permit Status: Complete
Permit Description: OFFICE
Start Date Submittal Complete Date Status  
01/28/2021 3RD PARTY REVIEW - COMMERCIAL 05/14/2021 COMPLETED Review Details
05/14/2021 POST 3RD PARTY REVIEW 05/17/2021 COMPLETED Review Details
05/21/2021 POST 3RD PARTY REVIEW 05/21/2021 COMPLETED Review Details
06/17/2022 3RD PARTY REVIEW - REVISION/OTHER 07/05/2022 COMPLETED Review Details
06/23/2021 REVISION - - 1ST 10/14/2021 COMPLETED Review Details
03/09/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/10/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM00886
Permit Status: Complete
Permit Description: OFFICE
Total Outstanding Activity Conditions - 1
Date Name
05/14/2021 SPECIAL INSPECTION IS REQUIRED FOR OUTDOOR LIGHTING

Conditions

Permit Number - T21CM00886
Permit Status: Complete
Permit Description: OFFICE
Date Description Comments
05/14/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
05/14/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
05/14/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
05/14/2021 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
05/14/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
05/14/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/14/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/14/2021 DEFERRED SUBMITTALS: STEEL JOISTS/JOIST GIRDERS, STEEL STAIRS, AND TILT-UP CONCRETE PANEL LIFT REINFORCING
07/28/2022 AIR BALANCE REPORT

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM00886
Permite Description: OFFICE
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
07/08/2022 COT - LCBU - Exterior Clips/Sheathing N/A Canceled {Activity date: 07/08/2022; Status: Not Applicable; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NA}
11/07/2022 COT - LCME - Mechanical Final N/A Canceled Inspection Canceled
11/07/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Canceled Inspection Canceled
11/07/2022 COT - FCON - Alarm - Final N/A Canceled Inspection Canceled
11/10/2022 Building Inspection - Outside Normal Hours Building Inspection N/A Partial Pass Electrical final. new 225 KVA transformer, 600A panel in room #112
11/07/2022 COT - FCON - Fire - Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Complete
Permit Number: T21CM00886
Permit Description: OFFICE
Total Completed Inspections - 32
Date Description Inspector Results Comments
07/30/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 07/30/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - AP}
10/29/2021 COT - LCBU - Preslab Passed {Activity date: 10/29/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
1 1/2” WATER SERVICE, 3 FEET INSIDE AND 3 FEET OUTSIDE. 100 PSI TEST.} ; {Activity date: 07/09/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Not ready}
11/10/2021 COT - FCON - Underground Flush Passed {Activity date: 11/10/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
11/10/2021 COT - FCON - Underground Pressure Passed {Activity date: 11/10/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - 200lb test approved saw all pipe and flushed.} ; {Activity date: 07/30/2021; Status: Prior to Final Inspectn; Inspector: wmotto1; Comment: Entered by WMOTTO1 - T21FC00436 Underground permit.

I saw the sweep inside the trench. Ok to burry a portion of the sweep so they can poor a footer. Still need a 200lb test along with the rest of the underground fire line.}
12/06/2021 COT - LCPL - Rough Soil Passed {Activity date: 12/06/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
Both restrooms and janitors room approved} ; {Activity date: 06/16/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - } ; {Activity date: 06/15/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - PARTIAL OK TO COVER 50 FEET SECTION ADJACENT TO ELEVATOR SHAFT}
02/15/2022 COT - LCEL - Service Upgrade Passed {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
TEP ECO}
03/30/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 03/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP 2nd floor all areas} ; {Activity date: 03/15/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. 1st floor south half} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. North half 1st floor office area} ; {Activity date: 02/25/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
Screws countersunk into Sheetrock thru out. Surface paper of Sheetrock can not be broken per manufactures specs}
04/04/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 04/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CODE EC0/UNIT 1} ; {Activity date: 04/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO} ; {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO}
06/09/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TUNDBERG; Comment: Entered by VVERA1 - PA
2nd floor ok to install all ceiling tiles} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval 1st floor excludes rm 112 rm 130, 131, 137, 139, 117 and 118, 136 awaiting snorkels for labs}
06/09/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/07/2021; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CA} ; {Activity date: 12/02/2021; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CA} ; {Activity date: 09/16/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for walls 1-8 ok for concrete placement} ; {Activity date: 09/10/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for walls 26,27,and 24 ok for concrete placement} ; {Activity date: 09/08/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for walls 9,11,13,18, and 20 ok for concrete placement} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - NR, cancelled by Contractor} ; {Activity date: 09/02/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -PA panels 21, 22, 23, and 25.} ; {Activity date: 08/31/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor

} ; {Activity date: 08/30/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Not ready} ; {Activity date: 08/26/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Inspection canceled by contractor}
06/09/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TUNDBERG; Comment: Entered by VVERA1 - PA} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval 1st floor excludes rm 112 rm 130, 131, 137, 139, 117 and 118, 136 awaiting snorkels for labs}
06/09/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/15/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
All soil and domestic water lines on 2nd floor approved. Water tested at 100psi hydro} ; {Activity date: 01/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval first floor only DWV and potable system excluding the lounge room
} ; {Activity date: 12/09/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready} ; {Activity date: 12/06/2021; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA}
06/09/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/15/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA} ; {Activity date: 01/06/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
Domestic hot, cold, and return for first level approved. Tested at 110 psi}
06/09/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TUNDBERG; Comment: Entered by VVERA1 - PA} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval 1st floor excludes rm 112 rm 130, 131, 137, 139, 117
} ; {Activity date: 03/30/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA. 2nd floor restrooms

} ; {Activity date: 03/15/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. Framing & electric in restroom hard-lids}
06/09/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. 2nd floor duct approved to wrap} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA. 1st floor duct approved to wrap} ; {Activity date: 12/07/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - . PA
Supply duct joints sealed and marked on page m101}
06/09/2022 COT - LCBU - Roof Nailing Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 01/12/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA}
06/09/2022 COT - LCBU - Building Progress Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/30/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for panels 9,12,14,15,16 and 19 ok for concrete placement}
06/09/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/07/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP
2nd lift/top-out grout at trash enclosure approved.} ; {Activity date: 12/02/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - PA
1st lift of CMU trash inclosure approved.}
07/08/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/01/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA} ; {Activity date: 03/24/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Inspection canceled by contractor

} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. 2nd floor} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA 1st floor approved}
07/08/2022 COT - LCBU - Framing Passed {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA 2nd floor kickers not install, OK to sheetrock} ; {Activity date: 01/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval first floor only ok to one side

}
07/08/2022 COT - LCEL - Electrical Underground Passed {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/07/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for east light poles 4 each and area from building across drive to east side} ; {Activity date: 12/02/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - PA
Underground conduit from north side of building to the christy box and 2 light pole bases approved as noted on page e101.} ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - PA

Eight 4” and four 2 1/2” communications conduit starting at new TUSIMPLE
Building and terminating in lot to the west for future buildings.} ; {Activity date: 07/20/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for all UG under slab, ok for concrete} ; {Activity date: 06/23/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VLEON1 - PARTIAL UNDER SLAB ONLY}
07/08/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/26/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval elevator shaft remains to be inspected} ; {Activity date: 05/13/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready
}
07/08/2022 COT - LCBU - Sustainability Passed {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/08/2022 COT - LCPL - Sewer Passed {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/09/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for clean outs and back flow valve ok to cover} ; {Activity date: 07/22/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval need two way clean out and back flow} ; {Activity date: 07/09/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval 4 inch line from building C/O to HCS with 5 C/O total
Ok to cover

}
08/18/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 08/18/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - } ; {Activity date: 07/13/2022; Status: Cancelled; Inspector: CGates; Comment: Entered by CGATES1 - Cancelled per contractor.}
08/18/2022 FCON – OH Piping & Hydro Passed {Activity date: 08/18/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - Approved 2/28/22 permit T21FC00518}
08/19/2022 COT - LCEL - Outdoor Lighting Passed {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/19/2022 COT - LCPL - Plumbing Final Passed {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/02/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA} ; {Activity date: 07/27/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED}
02/16/2023 COT - FCON - Fire - Final Passed Approved by C Gates on 1/20/2023
02/16/2023 COT - LCBU - Building Final Passed
02/16/2023 COT - LCEL - Electrical Final Passed
02/16/2023 ENGR Engineering Final Passed N/A

Documents

File Name Document Type  
T21CM00886 WATER REPORT1.PDF DOCUMENTS VIEW
AIR BALANCE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FINAL SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LB BOOK 2022-01-03 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLUMBING DELTA 2 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_STAIR DEFERRED SUBMITTAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV3_ REVISION LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV3_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV3_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV3_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO EXTENSION REQUEST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO T21CM00886 11.22.2022 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
AIR BALANCE.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FINAL SIC.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LB BOOK 2022-01-03.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLUMBING DELTA 2.PDF DOCUMENTS VIEW
REV2_APPLICATION.PDF DOCUMENTS VIEW
REV2_STAIR DEFERRED SUBMITTAL.PDF DOCUMENTS VIEW
REV2_STRUCTURAL CALCS.PDF DOCUMENTS VIEW
REV3_ REVISION LETTER.PDF DOCUMENTS VIEW
REV3_JOB CARD.PDF DOCUMENTS VIEW
REV3_PERMIT.PDF DOCUMENTS VIEW
REV3_PLAN SET.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
TCO EXTENSION REQUEST.PDF DOCUMENTS VIEW
TCO T21CM00886 11.22.2022.PDF DOCUMENTS VIEW
TCO.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
HVAC LOADS 1.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
ENERGY ENVELOPE.PDF DOCUMENTS VIEW
HVAC LOADS 2.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
OUTDOOR LIGHTING SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERTS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW