Permit: T21CM00886
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
9538 E OLD VAIL RD BLDG 1
Address NEW:
9538 E OLD VAIL RD BLDG 1
Apply Date:
01/28/2021
Applicant:
Description:
OFFICE
Permit Reviews
Permit Number - T21CM00886
Permit Status: Complete
Permit Description: OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/28/2021 | 3RD PARTY REVIEW - COMMERCIAL | 05/14/2021 | COMPLETED |
| 05/14/2021 | POST 3RD PARTY REVIEW | 05/17/2021 | COMPLETED |
| 05/21/2021 | POST 3RD PARTY REVIEW | 05/21/2021 | COMPLETED |
| 06/17/2022 | 3RD PARTY REVIEW - REVISION/OTHER | 07/05/2022 | COMPLETED |
| 06/23/2021 | REVISION - - 1ST | 10/14/2021 | COMPLETED |
| 03/09/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/10/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM00886
Permit Status: Complete
Permit Description: OFFICE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/14/2021 | SPECIAL INSPECTION IS REQUIRED FOR OUTDOOR LIGHTING |
Conditions
Permit Number - T21CM00886
Permit Status: Complete
Permit Description: OFFICE
| Date | Description | Comments |
|---|---|---|
| 05/14/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 05/14/2021 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 05/14/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 05/14/2021 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 05/14/2021 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 05/14/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/14/2021 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 05/14/2021 | DEFERRED SUBMITTALS: STEEL JOISTS/JOIST GIRDERS, STEEL STAIRS, AND TILT-UP CONCRETE PANEL LIFT REINFORCING | |
| 07/28/2022 | AIR BALANCE REPORT |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM00886
Permite Description: OFFICE
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2022 | COT - LCBU - Exterior Clips/Sheathing | N/A | Canceled | {Activity date: 07/08/2022; Status: Not Applicable; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NA} |
| 11/07/2022 | COT - LCME - Mechanical Final | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - FCON - Alarm - Final | N/A | Canceled | Inspection Canceled |
| 11/10/2022 | Building Inspection - Outside Normal Hours Building Inspection | N/A | Partial Pass | Electrical final. new 225 KVA transformer, 600A panel in room #112 |
| 11/07/2022 | COT - FCON - Fire - Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM00886
Permit Description: OFFICE
Total Completed Inspections - 32
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2021 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 07/30/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - AP} | |
| 10/29/2021 | COT - LCBU - Preslab | Passed | {Activity date: 10/29/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP 1 1/2” WATER SERVICE, 3 FEET INSIDE AND 3 FEET OUTSIDE. 100 PSI TEST.} ; {Activity date: 07/09/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Not ready} |
|
| 11/10/2021 | COT - FCON - Underground Flush | Passed | {Activity date: 11/10/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } | |
| 11/10/2021 | COT - FCON - Underground Pressure | Passed | {Activity date: 11/10/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - 200lb test approved saw all pipe and flushed.} ; {Activity date: 07/30/2021; Status: Prior to Final Inspectn; Inspector: wmotto1; Comment: Entered by WMOTTO1 - T21FC00436 Underground permit. I saw the sweep inside the trench. Ok to burry a portion of the sweep so they can poor a footer. Still need a 200lb test along with the rest of the underground fire line.} |
|
| 12/06/2021 | COT - LCPL - Rough Soil | Passed | {Activity date: 12/06/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP Both restrooms and janitors room approved} ; {Activity date: 06/16/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - } ; {Activity date: 06/15/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - PARTIAL OK TO COVER 50 FEET SECTION ADJACENT TO ELEVATOR SHAFT} |
|
| 02/15/2022 | COT - LCEL - Service Upgrade | Passed | {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP TEP ECO} |
|
| 03/30/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 03/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP 2nd floor all areas} ; {Activity date: 03/15/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. 1st floor south half} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. North half 1st floor office area} ; {Activity date: 02/25/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO Screws countersunk into Sheetrock thru out. Surface paper of Sheetrock can not be broken per manufactures specs} |
|
| 04/04/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 04/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CODE EC0/UNIT 1} ; {Activity date: 04/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO} ; {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO} | |
| 06/09/2022 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TUNDBERG; Comment: Entered by VVERA1 - PA 2nd floor ok to install all ceiling tiles} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval 1st floor excludes rm 112 rm 130, 131, 137, 139, 117 and 118, 136 awaiting snorkels for labs} |
|
| 06/09/2022 | COT - LCBU - Stem Wall/Retaining Wall | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/07/2021; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CA} ; {Activity date: 12/02/2021; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CA} ; {Activity date: 09/16/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for walls 1-8 ok for concrete placement} ; {Activity date: 09/10/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for walls 26,27,and 24 ok for concrete placement} ; {Activity date: 09/08/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for walls 9,11,13,18, and 20 ok for concrete placement} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - NR, cancelled by Contractor} ; {Activity date: 09/02/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -PA panels 21, 22, 23, and 25.} ; {Activity date: 08/31/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor } ; {Activity date: 08/30/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Not ready} ; {Activity date: 08/26/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Inspection canceled by contractor} |
|
| 06/09/2022 | COT - LCME - Mechanical Above Ceiling | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TUNDBERG; Comment: Entered by VVERA1 - PA} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval 1st floor excludes rm 112 rm 130, 131, 137, 139, 117 and 118, 136 awaiting snorkels for labs} | |
| 06/09/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/15/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA All soil and domestic water lines on 2nd floor approved. Water tested at 100psi hydro} ; {Activity date: 01/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval first floor only DWV and potable system excluding the lounge room } ; {Activity date: 12/09/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready} ; {Activity date: 12/06/2021; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA} |
|
| 06/09/2022 | COT - LCPL - Plumbing Above Ceiling | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/15/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA} ; {Activity date: 01/06/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA Domestic hot, cold, and return for first level approved. Tested at 110 psi} |
|
| 06/09/2022 | COT - LCEL - Electrical Above Ceiling | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TUNDBERG; Comment: Entered by VVERA1 - PA} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval 1st floor excludes rm 112 rm 130, 131, 137, 139, 117 } ; {Activity date: 03/30/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA. 2nd floor restrooms } ; {Activity date: 03/15/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. Framing & electric in restroom hard-lids} |
|
| 06/09/2022 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. 2nd floor duct approved to wrap} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA. 1st floor duct approved to wrap} ; {Activity date: 12/07/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - . PA Supply duct joints sealed and marked on page m101} |
|
| 06/09/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 01/12/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA} | |
| 06/09/2022 | COT - LCBU - Building Progress | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/30/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for panels 9,12,14,15,16 and 19 ok for concrete placement} | |
| 06/09/2022 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/07/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP 2nd lift/top-out grout at trash enclosure approved.} ; {Activity date: 12/02/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - PA 1st lift of CMU trash inclosure approved.} |
|
| 07/08/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/01/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA} ; {Activity date: 03/24/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Inspection canceled by contractor } ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. 2nd floor} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA 1st floor approved} |
|
| 07/08/2022 | COT - LCBU - Framing | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA 2nd floor kickers not install, OK to sheetrock} ; {Activity date: 01/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval first floor only ok to one side } |
|
| 07/08/2022 | COT - LCEL - Electrical Underground | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/07/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for east light poles 4 each and area from building across drive to east side} ; {Activity date: 12/02/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - PA Underground conduit from north side of building to the christy box and 2 light pole bases approved as noted on page e101.} ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - PA Eight 4” and four 2 1/2” communications conduit starting at new TUSIMPLE Building and terminating in lot to the west for future buildings.} ; {Activity date: 07/20/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for all UG under slab, ok for concrete} ; {Activity date: 06/23/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VLEON1 - PARTIAL UNDER SLAB ONLY} |
|
| 07/08/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/26/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval elevator shaft remains to be inspected} ; {Activity date: 05/13/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready } |
|
| 07/08/2022 | COT - LCBU - Sustainability | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 07/08/2022 | COT - LCPL - Sewer | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/09/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for clean outs and back flow valve ok to cover} ; {Activity date: 07/22/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval need two way clean out and back flow} ; {Activity date: 07/09/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval 4 inch line from building C/O to HCS with 5 C/O total Ok to cover } |
|
| 08/18/2022 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - } ; {Activity date: 07/13/2022; Status: Cancelled; Inspector: CGates; Comment: Entered by CGATES1 - Cancelled per contractor.} | |
| 08/18/2022 | FCON – OH Piping & Hydro | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - Approved 2/28/22 permit T21FC00518} | |
| 08/19/2022 | COT - LCEL - Outdoor Lighting | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/19/2022 | COT - LCPL - Plumbing Final | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/02/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA} ; {Activity date: 07/27/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} | |
| 02/16/2023 | COT - FCON - Fire - Final | Passed | Approved by C Gates on 1/20/2023 | |
| 02/16/2023 | COT - LCBU - Building Final | Passed | ||
| 02/16/2023 | COT - LCEL - Electrical Final | Passed | ||
| 02/16/2023 | ENGR Engineering Final | Passed | N/A |