Inspection Status: Passed
Inspection History: COT - LCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2021 |
COT - LCBU - Preslab |
TLUNDBERG |
Approved |
Entered by RSALDAT1 - AP
4 FT SPACER SLAB BETWEEN TILT-PANEL AND EXISTING FLOOR SLAB OK ON SOUTH AND WEST WALLS. |
| 10/19/2021 |
COT - LCBU - Preslab |
TLUNDBERG |
Partial Approval |
Entered by NGARCIA3 - Partial approved. This partial is a 4 foot pour back between the tilt panels and slab on the north and east walls. |
| 08/02/2021 |
COT - LCBU - Preslab |
WGALLAGHER |
Partial Approval |
Entered by RSALDAT1 - Partial approval main building slab ok
|
| 10/29/2021 |
COT - LCBU - Preslab |
TLUNDBERG |
Approved |
Entered by NGARCIA3 - AP
1 1/2” WATER SERVICE, 3 FEET INSIDE AND 3 FEET OUTSIDE. 100 PSI TEST. |
| 07/09/2021 |
COT - LCBU - Preslab |
WGALLAGHER |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready |