Permit Details

Status:
Complete
Type:
Commercial Building
Address:
260 S CHURCH AV
Apply Date:
12/03/2020
Applicant:
Michael Becherer
Description:
New Meeting room addition to the existing Tucson Convention Center for foundations.

Permit Reviews

Permit Number - T20CM08455
Permit Status: Complete
Permit Description: New Meeting room addition to the existing Tucson Convention Center for foundations.
Start Date Submittal Complete Date Status  
01/27/2021 RESUBMITTAL 03/03/2021 COMPLETED Review Details
12/03/2020 COMMERCIAL - BLDG/FIRE/ZONING/ENG 01/25/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM08455
Permit Status: Complete
Permit Description: New Meeting room addition to the existing Tucson Convention Center for foundations.
Total Outstanding Activity Conditions - 8
Date Name
01/15/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
01/15/2021 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
01/15/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
01/15/2021 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
01/15/2021 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
01/15/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
01/15/2021 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
01/15/2021 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: T20CM08455
Permit Description: New Meeting room addition to the existing Tucson Convention Center for foundations.
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/24/2021 COT - LCPL - Gas Pressure Test Passed {Activity date: 11/24/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Gas lines are under pressure, no meter required at this time.}
11/24/2021 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 11/24/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Primary and secondary roof drains in place and under hydro test.}
07/18/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/10/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled. Will reschedule for 11 February.}
07/18/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - }
07/18/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/17/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - . Partial. Two urinals to be moved. Waste lines relocated and urinals to be mounted to wall. Ok to insulate and cover walls.} ; {Activity date: 09/16/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - 02035. Partial. Level 2, (interior) exterior walls, in wall electric. Ok to insulate and cover walls.}
07/18/2022 COT - LCBU - Framing Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 11/12/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. From manhole number five to manhole number six.} ; {Activity date: 11/08/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready, will reschedule for 10 November} ; {Activity date: 10/07/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. South exterior portion of building is not ready.} ; {Activity date: 09/30/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Contractor cancelled, will reschedule for 1 October.} ; {Activity date: 09/27/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Level #2 interior framing. Contractor cancelled.} ; {Activity date: 09/22/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Framing on Level #2 incomplete. Contractor cancelled.} ; {Activity date: 09/15/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Not ready. Interior framing on Level #1: will recall for inspection 16 September.} ; {Activity date: 09/13/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Not ready. Contractor cancelled, will reschedule for 15 September.} ; {Activity date: 09/03/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - 01035. Not ready. Contractor cancelled.} ; {Activity date: 08/24/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - 01035. Partial. West wall exterior framing at Level #2. Ok to hang exterior sheathing on progress areas.} ; {Activity date: 07/20/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Will reschedule for 23 July.}
07/18/2022 COT - LCEL - Electrical Underground Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/23/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Trenches and conduits (3/4”-1”) throughout Level#1 slab area. Ok to cover progress areas.}
07/18/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 09/23/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Not ready. Contractor cancelled. Will reschedule for 26 September.} ; {Activity date: 08/27/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Not ready. Contractor cancelled.} ; {Activity date: 08/03/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. North extension wall; 7 each grade beams and in fill at Level #2 floor. Ok to place concrete in progress areas.
} ; {Activity date: 07/01/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Rebar for second floor system not in place. Will reschedule for 6 July.} ; {Activity date: 06/29/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 1 July.

} ; {Activity date: 06/28/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule slab inspections for 29 June

} ; {Activity date: 06/25/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 28 June..

} ; {Activity date: 06/22/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - NOT READY CONTRACTOR CANCELLED} ; {Activity date: 06/21/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 22 June.} ; {Activity date: 06/18/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 22 June. 03005. Approved. Waste and vent lines at 2”-6”. Red line plan change, see approved plans} ; {Activity date: 06/18/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 22 June.

} ; {Activity date: 06/17/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - NOT READY CONTRACTOR CANCELLED} ; {Activity date: 06/14/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 16 June.} ; {Activity date: 06/11/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 14 June.} ; {Activity date: 06/10/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 14 June.} ; {Activity date: 06/09/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 14 June.} ; {Activity date: 06/04/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Special Inspections for minute welds and bolt inspection on erected steel beams and columns.

} ; {Activity date: 06/03/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - NOT READY CONTRACTOR CANCELLED} ; {Activity date: 05/13/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Retaining wall on GL: DD/19.2-19.9. Ok to set forms and place concrete in progress areas.} ; {Activity date: 05/12/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Grade beam on GL: 20/CC-Z.4. Ok to place concrete in progress areas.} ; {Activity date: 05/05/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - 01005. Partial. Retaining wall at GL: DD/20.7-22.5. Ok to set forms, prep for concrete placement.} ; {Activity date: 05/11/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Retaining walls on GL; 19.2-20 (CRW #2; CRW #3). Ok to set forms and place concrete in progress areas.} ; {Activity date: 05/11/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - PARTAIL RETAINING WALL AT GL: DD/20.7-22.5 OK TO SET FORMS, PREP FOR CONCRETE PLACEMENT} ; {Activity date: 05/10/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Removing forms and form sets from retaining wall on GL: DD/21.5-20.7.} ; {Activity date: 05/07/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - NOT READY SITE LOCKED} ; {Activity date: 05/07/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - PARTIAL RETAINING WALL AT GL: DD/20.7-22.5 OK TO SET FORMS, PREP FOR CONCRETE PLACEMENT} ; {Activity date: 05/04/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Placing concrete forms on West retaining wall at GL: DD/21.5-20.7.} ; {Activity date: 04/30/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Second floor feed and waste lines tested/complete.
} ; {Activity date: 04/28/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Retaining wall on GL: DD/20.7-21.5 at 15’6” x 40”. Ok to set forms and place concrete.} ; {Activity date: 04/27/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - NOT READY WILL RESCHEDULE FOR 28 APRIL} ; {Activity date: 04/26/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Information only: West elevator sump pump location must be moved away from the doors as per State Elevator Inspector.

} ; {Activity date: 04/23/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Retaining wall at GL: DD/21.5-20.7; 15’6” x 40”. Ok to place concrete in progress area.} ; {Activity date: 04/22/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Retaining wall at GL: DD/20-20.5. Ok to set forms and place concrete.} ; {Activity date: 04/21/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Retaining wall at GL: BB-DD/19 at 15’6”. Ok to place concrete in progress areas.

} ; {Activity date: 04/20/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 04/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. West wall rebar at GL: DD/20.7-19.2 at 6’6”-15’6”} ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Retaining wall at GL: BB-Z.4/19; forms set, Ok to place concrete.} ; {Activity date: 04/13/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Elevator #2 (East Elevator); slab footing. Ok to place concrete.} ; {Activity date: 04/12/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Contractor cancelled will reschedule East Elevator footings for 13 April.} ; {Activity date: 04/08/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - 01005. Partial. Elevator pad (first pour) at 28”-30”. Ok to place concrete in progress areas.} ; {Activity date: 04/08/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Alteration of footing/grade beams at GL: 19/CC-Z. Information only; complete rebar inspection 9 Apri} ; {Activity date: 04/01/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Footing/grade beam at GL: DD/21.5-20.2. Footing to be completed 2 April. Caisson footings and cages at 4’x20’ at GL: AA/19.2; 19.6; 20
07/18/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/02/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Levels #1 and #2; Electric rooms, penetrations have been Fire caulked.}
07/18/2022 COT - LCBU - Preslab Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - }
07/18/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 11/24/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. 4” domestic waste and vent line from level #2 restrooms to roof.} ; {Activity date: 10/06/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Waste and vent lines on Level #2, from lines on Level #1.} ; {Activity date: 10/04/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Pex lines need to be under test} ; {Activity date: 10/01/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Copper domestic lines above ceiling and in walls. Ok to insulate lines.}
07/18/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/22/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. South exterior canopies at Levels #1 & #2, dens glass sheathing on walls and ceilings.} ; {Activity date: 09/16/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - 01025. Partial. Level #2 exterior walls (dens-glas) sheathing on West walls. Ok to waterproof and cover walls. West connecting wall of existing building; Ok to tape and cover walls.} ; {Activity date: 06/16/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Level #2 sub deck; metal Pamela with rebar and Nelson studs reinforced.}
07/18/2022 COT - LCPL - Rough Soil Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 09/17/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Domestic water line (4”) from building to main line. Ok to cover progress areas.} ; {Activity date: 06/02/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. 8” waste line from main System be joined to new addition conference building. Ok to cover and set 4” clean out at joint site.}
07/18/2022 COT - LCBU - Roof Nailing Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 08/19/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Contractor cancelled, will reschedule for 20 August.} ; {Activity date: 08/13/2021; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Not ready. Materials will not arrive until next week. Contractor cancelled.}
07/18/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 08/02/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. West CMU wall at 21’8”-29’on GL: CC/19.9-20.7. Ok to place grout in progress areas.

} ; {Activity date: 05/27/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Back fill at West retaining wall: compaction inspection to be performed by special inspection.} ; {Activity date: 05/26/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevator shafts East and West are topped out and grouted.} ; {Activity date: 05/25/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevator shafts at East and West: 18’ - 24’. Ok to grout progress areas.} ; {Activity date: 05/24/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 25 May.

} ; {Activity date: 05/21/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevators East and West (#1 & #2) at 18’ - 24’. Ok to place grout in progress areas.} ; {Activity date: 05/20/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevators East and West CMU masonry walls (shaft) at 14’-20’. Ok to place grout in progress areas.

} ; {Activity date: 05/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevators #1 & 2 at 8’-12’. Inspections performed on 18 May.} ; {Activity date: 05/18/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevator shafts #1 & #2 at 0’-8’; clean - outs are in place. Ok to place grout in progress areas.

} ; {Activity date: 05/17/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Retaining wall at GL: DD/19.2-19.9. Forms in place, ok to place concrete.

} ; {Activity date: 05/14/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Concrete placement in retaining wall on GL: DD/19.2-19.9.} ; {Activity date: 05/13/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Elevator pits #1 and #2; base waterproofed and slurry placed around pits at four foot level.} ; {Activity date: 05/05/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - SET FORMS AT GRIDLINE 22.5 THRU 20.6/DD. (CELL DISCUSSION WITH JB ON 05/06/21)
} ; {Activity date: 05/06/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevator shafts #1 and #2 at 0’ - 4’. Ok to place concrete in progress areas.} ; {Activity date: 05/06/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Elevator shafts #1 and #2 at 0’ - 4’. Ok to place concrete in progress areas.}
07/18/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/21/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - PARTIAL. Level #1; men’s restroom (correction area). Ok to tape progress area.} ; {Activity date: 10/06/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. One side sheet rock on Level #1. Ok to tape progress areas.}
07/20/2022 COT - FCON - Alarm - Final Passed {Activity date: 07/20/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } ; {Activity date: 01/28/2022; Status: Partial Approval; Inspector: wmotto1; Comment: Entered by WMOTTO1 - 1.tested the exit corridor for the gem show only.Tested tamper and water flow alon with all strobes within the gemshow corridor.}
07/20/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 07/20/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } ; {Activity date: 01/28/2022; Status: Partial Approval; Inspector: wmotto1; Comment: Entered by WMOTTO1 - 1. Did a partial approval to get the exit corridor approved for the gem show only. Tested tamper and water flow and walked all heads on level one and two.}
07/20/2022 COT - FCON - Fire - Final Passed {Activity date: 07/20/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } ; {Activity date: 01/28/2022; Status: Partial Approval; Inspector: wmotto1; Comment: Entered by WMOTTO1 - 1. fire alarms and sprinklers along with exit lighting and emergency lights were tested in the exit corridor for the gem show. These passed.

Ok for TCO for the exiting corridor for the gym show only. This is pending 1 set of doors level one south eleveation and 2 sets of doors on level 2.}
07/21/2022 ENGR Engineering Final Passed {Activity date: 07/21/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/10/2022 COT - LCBU - Building Final Passed {Activity date: 08/10/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED. Please have Ernie remove from active inspections} ; {Activity date: 08/09/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - APPROVED BY INSPECTOR AWAITING CONDITIONS} ; {Activity date: 08/09/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - APPROVED} ; {Activity date: 08/08/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 08/08/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 08/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - APPROVED} ; {Activity date: 07/27/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 07/25/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 07/25/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Note: Please close out all combination permits for this projects.

} ; {Activity date: 07/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED. Please close out all building permits associated with this project, except for the DP inspections.

} ; {Activity date: 07/21/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - APPROVED BY INSPECTOR AWAITNG CONDITIONS} ; {Activity date: 07/21/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - NOTE: All combination permit inspections have been closed out. All that remains open on this project are Fire Finals and the Development permit.

} ; {Activity date: 07/18/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - NOT READY. Please call any and all inspections that have not been approved for closure of any open permits.} ; {Activity date: 07/18/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - INSPECTOR JB APPROVED 1090. PENDING OTHER INSPECTIONS.} ; {Activity date: 07/15/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Need to ensure permits are complete relating to building.

} ; {Activity date: 07/13/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Need to up date and complete all permits.

} ; {Activity date: 07/07/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Permit for meeting hall expansion. Need to up date all permits and close out as much as possible.} ; {Activity date: 02/01/2022; Status: Partial Approval; Inspector: aquiroz; Comment: Entered by AQUIROZ - 1st floor of west meeting room ok for gem show use TCO.}
10/07/2022 COT - LCBU - Building Progress Passed {Activity date: 10/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by KROBLES1 - } ; {Activity date: 07/29/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Need to complete DP in order to close out all permits.} ; {Activity date: 07/28/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Permit up date for Certificate of Occupancy} ; {Activity date: 07/26/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - APPROVED. Please close out all permits/inspections for building structures associated with this address.} ; {Activity date: 07/21/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/20/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - NOT READY. Need to complete all inspections.

} ; {Activity date: 07/19/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - PARTIAL. Spoke with Mike Miller and advised him to call in all open inspections in order to up date permits and move towards a Certificate of Occupancy.

} ; {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 07/12/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Need to update all permits.} ; {Activity date: 07/11/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Need to up date all permits} ; {Activity date: 07/08/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 07/06/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - NOT READY. No inspections required this date. Will reschedule for 7 July.

} ; {Activity date: 07/05/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - NOT READY. No inspections required this date.} ; {Activity date: 07/01/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/30/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/29/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.

} ; {Activity date: 06/28/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/27/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date

} ; {Activity date: 06/24/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date. Can we remove this inspection from an every day request?} ; {Activity date: 06/23/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date} ; {Activity date: 06/22/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.

} ; {Activity date: 06/21/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/20/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.} ; {Activity date: 06/17/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/16/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/15/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.} ; {Activity date: 06/14/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/13/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.} ; {Activity date: 06/10/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.} ; {Activity date: 06/09/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/08/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - NOT READY. No inspections required this date.

} ; {Activity date: 06/07/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - NOT READY. No inspections required this date.} ; {Activity date: 06/06/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.

} ; {Activity date: 06/03/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.} ; {Activity date: 06/02/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date

} ; {Activity date: 06/01/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this.} ; {Activity date: 06/01/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. No inspections required this.} ; {Activity date: 05/31/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required this date.

} ; {Activity date: 05/27/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.} ; {Activity date: 05/26/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial.. schedule for final Certificate of Occupancy inspection.} ; {Activity date: 05/25/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date} ; {Activity date: 05/24/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required for this date.

} ; {Activity date: 05/23/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - NOT READY. No inspections required this date.

} ; {Activity date: 05/20/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - NOT READY. No inspections required this.} ; {Activity date: 05/19/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. No inspections required at this time.} ; {Activity date: 05/18/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.} ; {Activity date: 05/17/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - NOT READY. No inspection required for this date.} ; {Activity date: 05/11/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. No inspections required this date.} ; {Activity date: 05/10/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FOUNDATION STRUCTURAL CALCS.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOREPORT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW