Permit: T20CM08455

Parcel: 11720029A


Addresses:

260 S CHURCH AV


Inspection Status: Passed

Inspection History: COT - LCBU - Masonry Pregrout 

Permit Number - T20CM08455

Inspection Description - COT - LCBU - Masonry Pregrout 

Inspection Status - Passed

Date Description Inspector Results Comments
07/18/2022 COT - LCBU - Masonry Pregrout  JBURGE Approved Entered by RSALDAT1 -
08/02/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by RSALDAT1 - Partial. West CMU wall at 21’8”-29’on GL: CC/19.9-20.7. Ok to place grout in progress areas.
05/27/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Back fill at West retaining wall: compaction inspection to be performed by special inspection.
05/26/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevator shafts East and West are topped out and grouted.
05/25/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevator shafts at East and West: 18’ - 24’. Ok to grout progress areas.
05/24/2021 COT - LCBU - Masonry Pregrout  JBURGE Not ready for Inspection Entered by VLEON1 - Not ready. Contractor cancelled will reschedule for 25 May.
05/21/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevators East and West (#1 & #2) at 18’ - 24’. Ok to place grout in progress areas.
05/20/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevators East and West CMU masonry walls (shaft) at 14’-20’. Ok to place grout in progress areas.
05/19/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevators #1 & 2 at 8’-12’. Inspections performed on 18 May.
05/18/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevator shafts #1 & #2 at 0’-8’; clean - outs are in place. Ok to place grout in progress areas.
05/17/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Retaining wall at GL: DD/19.2-19.9. Forms in place, ok to place concrete.
05/14/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Concrete placement in retaining wall on GL: DD/19.2-19.9.
05/13/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Elevator pits #1 and #2; base waterproofed and slurry placed around pits at four foot level.
05/05/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by RSALDAT1 - SET FORMS AT GRIDLINE 22.5 THRU 20.6/DD. (CELL DISCUSSION WITH JB ON 05/06/21)
05/06/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevator shafts #1 and #2 at 0’ - 4’. Ok to place concrete in progress areas.
05/06/2021 COT - LCBU - Masonry Pregrout  JBURGE Partial Approval Entered by VLEON1 - Partial. Elevator shafts #1 and #2 at 0’ - 4’. Ok to place concrete in progress areas.