Permit Details

Status:
Final
Type:
COMMERCIAL NEW
Apply Date:
09/25/2020
Applicant:
SCOTT FELTHEIM
Description:
NEW METAL BUILDING WITH CHURCH SANCTUARY, WASHROOMS AND OFFICES
Architects:
  • FELTHEIM SCOTT
Contractors:
  • KAPPCON INC

Permit Reviews

Permit Number - T20CM06675
Permit Status: Final
Permit Description: NEW METAL BUILDING WITH CHURCH SANCTUARY, WASHROOMS AND OFFICES
Start Date Submittal Complete Date Status  
01/21/2021 RESUBMITTAL 03/01/2021 COMPLETED Review Details
05/17/2021 3RD PARTY REVIEW - REVISION/OTHER 08/12/2021 COMPLETED Review Details
09/18/2020 COMMERCIAL - NEW 11/10/2020 COMPLETED Review Details
11/16/2020 RESUBMITTAL 12/17/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T20CM06675
Permit Description: NEW METAL BUILDING WITH CHURCH SANCTUARY, WASHROOMS AND OFFICES
Total Completed Inspections - 47
Date Description Inspector Results Comments
01/25/2021 STEM WALL/RETAINING WALL TTREMBULAK Approved APPROVED
03/18/2021 EXCAVATION/LAYOUT REBAR & ZON DMUNIZ Approved Partial, GL-Q exterior footing, 10 spread footings for building columns, 11 caisson footings for shade structure all ok for concrete placement.
05/12/2021 MECHANICAL - ABOVE CEILING TTREMBULAK Approved
05/12/2021 ELECTRIC - ABOVE CEILING TTREMBULAK Approved
07/06/2021 BUILDING PRE-SLAB DMUNIZ Approved Approved
07/23/2021 PLUMBING - INTERMEDIATE TGAUSP Approved Approved, all copper waterlines and DWV and Baptistry.
08/05/2021 FRAMING RELEFANTE Approved AP
08/11/2021 GAS CLEARANCE TGAUSP Approved CODE
08/11/2021 PLUMBING - GAS PRESSURE TEST TGAUSP Approved Approved, please send clearance to SWG for meter set
08/20/2021 PLUMBING - YARD WTR LINE/TEST DMUNIZ Approved Approved
08/20/2021 PLUMBING - ROUGH, SOIL DMUNIZ Approved Approved
08/24/2021 SHEET ROCK NAILING DMUNIZ Approved Approved
08/26/2021 MECHANICAL - INTERMEDIATE DMUNIZ Approved Approved
08/26/2021 U VALUE FOR WINDOW DMUNIZ Approved Approved
08/27/2021 PLUMBING - MD GAS/PRECONST MTG DMUNIZ Approved Not Applicable.
08/27/2021 ELECTRIC - CABLE DROP DMUNIZ Approved Not Applicable.
08/27/2021 SITE - SEWER DMUNIZ Approved Approved
08/27/2021 PLUMBING - ABOVE CEILING DMUNIZ Approved Approved
08/27/2021 PLUMBING - PRE SLAB DMUNIZ Approved Approved
08/27/2021 ELECTRIC - INTERMEDIATE DMUNIZ Approved Approved
08/27/2021 EXT METAL CLIPS/EXT SHEATHING DMUNIZ Approved Approved
09/22/2021 ROOF NAILING DMUNIZ Approved Approved
09/23/2021 ELECTRIC - CONSTRUCTION POWER DMUNIZ Approved Approved, Clear TEP ECO (2950 E IRVINGTON RD, BUILDING 2)
09/23/2021 ELECTRIC - UNDERGROUND DMUNIZ Approved Approved
09/23/2021 ELECTRIC - UFER DMUNIZ Approved Approved
09/28/2021 TEP CLEARANCE - PM TGAUSP Approved CODE INCR/POWERKILL/BUILD 1 AND SHED (METER #159477361)
09/28/2021 ELECTRIC - SERVICE UPGRADE TGAUSP Approved Approved, INCR Clearance was called into TEP (Powerkill) for Bldg #1 and Shed (meter# 159477361)
10/05/2021 ELECTRIC - OUTDOOR LIGHTING TGAUSP Approved - Approved foundation and uffer, okay to pour
10/19/2021 BUILDING ABOVE CEILING TGAUSP Approved Approved
10/21/2021 OUTDOOR LIGHTING FINAL DMUNIZ Approved Approved
10/21/2021 PLUMBING - GAS PRESS TEST FNL DMUNIZ Approved Approved
10/27/2021 RIGHT OF WAY - FINAL AF Approved
10/28/2021 FIRE - ALARM FINAL MRoss Approved -Need to verify A/V shutdown
-Test front lobby microphone at annunciator panel
-Need to test HVAC shutdown for units inside the building
10/28/2021 MECHANICAL - FINAL RSHERRY Approved REVIEW OF AIR BALANCE REPORT COMPLETED
10/28/2021 ENGINEERING - FINAL DROBERTS Approved IS PARTIAL, OK FOR TCO
10/28/2021 MECHANICAL - FINAL DMUNIZ Approved PARTIAL, submit AIR balance report for review.
10/28/2021 ELECTRIC - FINAL DMUNIZ Approved Approved
10/29/2021 PLUMBING - FINAL DMUNIZ Approved APPROVED
10/29/2021 FIRE - FINAL wmotto1 Approved 1. Ok to TCO per tucson fire. remaining hvac untits tested and passed.
10/29/2021 FIRE SPKLR - OH PIPING & HYDRO wmotto1 Approved
10/29/2021 FIRE SPKLR - UG PIPING FLUSH wmotto1 Approved
10/29/2021 FIRE SPKLR - UG, PIPING, HYDRO wmotto1 Approved
12/01/2021 FIRE SPKLR - FINAL MRoss Approved
12/14/2021 SIGN - FINAL DROBERTS Approved
12/14/2021 LANDSCAPE - FINAL DROBERTS Approved
12/14/2021 NPPO - FINAL DROBERTS Approved
12/15/2021 BUILDING - FINAL DMUNIZ Approved Partial, Final COfO pending Engineering and Fire Final approvals.

Documents

File Name Document Type  
ADD CHANGE.PDF DOCUMENTS VIEW
FINAL SIC DOOR CHURCH C.O.T. FINAL (2).PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
REVISION PLAN.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW
CONTRACTOR LETTER HEAD.PDF DOCUMENTS VIEW
SEWER RECEIPT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
UDDATE APPLICATION 2.PDF DOCUMENTS VIEW
UPDATE APPLICATION 3.PDF DOCUMENTS VIEW
UPDATE APPLICATION 1.PDF DOCUMENTS VIEW
STRUCTURAL PLANS.PDF CONSTRPLANS VIEW