Permit: T20CM06675

Parcel: 14010029A

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
03/18/2021 EXCAVATION/LAYOUT REBAR & ZON Approved Partial, GL-Q exterior footing, 10 spread footings for building columns, 11 caisson footings for shade structure all ok for concrete placement.
03/17/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - RI canceled
03/16/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
03/15/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
03/10/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial, Exterior footings, & Interior beam ties under slab for (GL 1-10, A-M) Except at depressed slab locations. Ok for concrete placement.
03/03/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial approval for stage area only, ok to pour. Baptismal pool was by third party
02/17/2021 EXCAVATION/LAYOUT REBAR & ZON Approved APPROVED FOR COLUNM LINE M AND BAPTISTRY ONLY
02/11/2021 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection NOT READY, FACE TIMED AT 9:02AM NO ANSWER
02/11/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL, SIX FOOTING ON GL 11 AND FOUR ON GL 1
02/10/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL, REBAR AT BACK OF STAGE AREA (CONTINUATION OF STEM WALL)
02/04/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL OK TO POUR EAST SIDE FOOTER ONLY