Permit: T20CM06291
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
9013 E OLD VAIL RD BLDG 6
Address NEW:
9013 E OLD VAIL RD BLDG 6
Apply Date:
09/14/2020
Applicant:
Chris Guinter
Description:
NEW COMMERCIAL SHELL BUILDING
Permit Reviews
Permit Number - T20CM06291
Permit Status: Complete
Permit Description: NEW COMMERCIAL SHELL BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/07/2022 | RESUBMITTAL | 03/02/2022 | COMPLETED |
| 03/14/2022 | RESUBMITTAL | 04/15/2022 | COMPLETED |
| 09/09/2020 | COMMERCIAL - NEW | 11/25/2020 | COMPLETED |
| 12/06/2021 | RESUBMITTAL | 02/07/2022 | COMPLETED |
| 10/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/26/2023 | REQUIRES RESUBMIT |
| 11/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/03/2023 | APPROVED |
Conditions
Permit Number - T20CM06291
Permit Status: Complete
Permit Description: NEW COMMERCIAL SHELL BUILDING
| Date | Description | Comments |
|---|---|---|
| 09/14/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/13/2020 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
| 10/13/2020 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 10/13/2020 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 12/14/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 10/13/2020 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 10/13/2020 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T20CM06291
Permite Description: NEW COMMERCIAL SHELL BUILDING
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Building Final | N/A | Not Ready | |
| 10/05/2023 | COT - LCBU - Sustainability | N/A | Not Applicable | |
| 10/05/2023 | COT - LCBU - Building Above Ceiling | N/A | Not Applicable | |
| 10/05/2023 | COT - LCEL - Temporary Service | N/A | Not Applicable | |
| 10/05/2023 | COT - LCEL - Construction Power | N/A | Not Applicable | |
| 10/18/2023 | ENGR Engineering Final | N/A | Partial Pass | Good for level four T.C.O. |
Completed Inspections
Permit Status: Complete
Permit Number: T20CM06291
Permit Description: NEW COMMERCIAL SHELL BUILDING
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 06/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 07/11/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 07/11/2022 | COT - LCBU - Preslab | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 07/11/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/25/2022 | COT - LCPL - Sewer | Passed | {Activity date: 08/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 11/15/2022 | COT - LCEL - Electrical Intermediate | Passed | ||
| 11/15/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 11/15/2022 | COT - LCME - Mechanical Intermediate | Passed | ||
| 11/22/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 02/03/2023 | COT - LCEL - Electrical Underground | Passed | 2 @ 3” conduit from building 6 to transformer at SE corner of building 7. | |
| 04/05/2023 | COT - LCPL - Yard Water Line | Passed | March 29th: Water lines not connected to buildings, however they are under pressure and approved to cover except t back flow connections and building connections April 5th: back flow connections and building connection complete. |
|
| 07/03/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 07/10/2023 | BULD - Electrical Clearance | Passed | Building 6 - ECO Clearances to TEP are required for 3 meters (units 6113, 6133, 6163) | |
| 08/25/2023 | COT - LCBU - Building Final | Passed | 8/25/23: OK to issue a Letter of Completion. | |
| 10/05/2023 | COT - LCME - Mechanical Final | Passed | ||
| 10/05/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 10/05/2023 | COT - LCBU - Building Progress | Passed | ||
| 10/05/2023 | COT - LCBU - Framing | Passed | ||
| 10/05/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 10/05/2023 | COT - LCEL - Electrical Final | Passed | ||
| 10/16/2023 | COT - FCON - Fire - Final | Passed | ||
| 02/26/2025 | ENGR Engineering Final | Passed | No issues found, DP has been cleared by Josh and Ben |