Permit Details

Status:
Issued
Type:
Commercial Building
Address:
7211 S PARK AV
Apply Date:
05/18/2020
Applicant:
Description:
FOUNDATION AND UNDERSLAB UTILITY

Permit Reviews

Permit Number - T20CM03065
Permit Status: Issued
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Start Date Submittal Complete Date Status  
05/18/2020 COMMERCIAL - TI 07/22/2020 COMPLETED Review Details
07/01/2020 RESUBMITTAL 08/24/2020 COMPLETED Review Details
08/24/2020 RESUBMITTAL 09/11/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM03065
Permit Status: Issued
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Total Outstanding Activity Conditions - 1
Date Name
05/18/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T20CM03065
Permit Status: Issued
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Date Description Comments
07/24/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
07/24/2020 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
07/24/2020 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
07/24/2020 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
07/24/2020 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/24/2020 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/24/2020 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
07/24/2020 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/24/2020 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T20CM03065
Permite Description: FOUNDATION AND UNDERSLAB UTILITY
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T20CM03065
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/18/2021 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 03/18/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, GL-F 6 piers, GL-D 3 piers ok for concrete placement.} ; {Activity date: 03/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial. 4 Stems for piers @ GRID A ok for concrete placement.} ; {Activity date: 03/05/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Stem walls for elevator shaft ok for concrete placement. Stems for 7 Columns GL-A & 2 @ GL 7 E3 all ok for concrete placement.}
06/10/2022 COT - LCBU - Preslab Passed {Activity date: 06/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, front entry.} ; {Activity date: 06/09/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for reinforced slab at the east side of Hanger} ; {Activity date: 01/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 01/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Administration foundation installed per plan and ok for concrete placement.

Contractor Note: Clean spoils from footings and ensure re bar clearances are kept prior to pour.

} ; {Activity date: 09/30/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1015. Partial. Stairwell #2, grid lines D-0.4.

} ; {Activity date: 09/21/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for entire 2nd story floor between grid line D and E} ; {Activity date: 05/05/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Continued slab from GL- F to GL- E.9 all ok for concrete placement.} ; {Activity date: 04/19/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VLEON1 - Partial Approval-PA, for Hanger Gridline B.50-C.50} ; {Activity date: 04/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Slab inspected from GL-D to C.5.0, & GL-B to B.5.0 these two slabs ok for concrete.} ; {Activity date: 03/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, see previous notes.
} ; {Activity date: 03/26/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Slab ok for concrete for (GL-A to B).}

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
ECHOTECH REPORT.PDF DOCUMENTS VIEW
FINAL SIC.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PROJECT SPECIFICATIONS.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
SUMMARY OF AREA FOR TI AND EXPANSION.PDF DOCUMENTS VIEW