Permit: T20CM03065
Permit Details
Apply Date:
05/18/2020
Applicant:
Description:
FOUNDATION AND UNDERSLAB UTILITY
Permit Reviews
Permit Number - T20CM03065
Permit Status: Issued
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/18/2020 | COMMERCIAL - TI | 07/22/2020 | COMPLETED |
07/01/2020 | RESUBMITTAL | 08/24/2020 | COMPLETED |
08/24/2020 | RESUBMITTAL | 09/11/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T20CM03065
Permit Status: Issued
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/18/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T20CM03065
Permit Status: Issued
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Date | Description | Comments |
---|---|---|
07/24/2020 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
07/24/2020 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
07/24/2020 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
07/24/2020 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
07/24/2020 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
07/24/2020 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
07/24/2020 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
07/24/2020 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
07/24/2020 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T20CM03065
Permite Description: FOUNDATION AND UNDERSLAB UTILITY
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/27/2022 | COT - LCEL - Electrical Final | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Underground | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Grounding/Bonding | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T20CM03065
Permit Description: FOUNDATION AND UNDERSLAB UTILITY
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/18/2021 | COT - LCBU - Stem Wall/Retaining Wall | Passed | {Activity date: 03/18/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, GL-F 6 piers, GL-D 3 piers ok for concrete placement.} ; {Activity date: 03/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial. 4 Stems for piers @ GRID A ok for concrete placement.} ; {Activity date: 03/05/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Stem walls for elevator shaft ok for concrete placement. Stems for 7 Columns GL-A & 2 @ GL 7 E3 all ok for concrete placement.} | |
06/10/2022 | COT - LCBU - Preslab | Passed | {Activity date: 06/10/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, front entry.} ; {Activity date: 06/09/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for reinforced slab at the east side of Hanger} ; {Activity date: 01/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 01/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Administration foundation installed per plan and ok for concrete placement. Contractor Note: Clean spoils from footings and ensure re bar clearances are kept prior to pour. } ; {Activity date: 09/30/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1015. Partial. Stairwell #2, grid lines D-0.4. } ; {Activity date: 09/21/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for entire 2nd story floor between grid line D and E} ; {Activity date: 05/05/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Continued slab from GL- F to GL- E.9 all ok for concrete placement.} ; {Activity date: 04/19/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VLEON1 - Partial Approval-PA, for Hanger Gridline B.50-C.50} ; {Activity date: 04/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Slab inspected from GL-D to C.5.0, & GL-B to B.5.0 these two slabs ok for concrete.} ; {Activity date: 03/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, see previous notes. } ; {Activity date: 03/26/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Slab ok for concrete for (GL-A to B).} |