Inspection Status: Passed
Inspection History: COT - LCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2022 |
COT - LCBU - Preslab |
DMUNIZ |
Approved |
Entered by VVERA1 - Approved, front entry. |
| 06/09/2022 |
COT - LCBU - Preslab |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 03/02/2022 |
COT - LCBU - Preslab |
TGAUSP |
Partial Approval |
Entered by VVERA1 - Partial for reinforced slab at the east side of Hanger |
| 01/26/2022 |
COT - LCBU - Preslab |
DMUNIZ |
Approved |
Entered by VVERA1 - Approved |
| 01/26/2022 |
COT - LCBU - Preslab |
DMUNIZ |
Approved |
Entered by VVERA1 - Approved, Administration foundation installed per plan and ok for concrete placement.
Contractor Note: Clean spoils from footings and ensure re bar clearances are kept prior to pour.
|
| 09/30/2021 |
COT - LCBU - Preslab |
ESTEVENS |
Partial Approval |
Entered by VVERA1 - 1015. Partial. Stairwell #2, grid lines D-0.4.
|
| 09/21/2021 |
COT - LCBU - Preslab |
TGAUSP |
Partial Approval |
Entered by NGARCIA3 - Partial for entire 2nd story floor between grid line D and E |
| 05/05/2021 |
COT - LCBU - Preslab |
DMUNIZ |
Partial Approval |
Entered by VLEON1 - Partial, Continued slab from GL- F to GL- E.9 all ok for concrete placement. |
| 04/19/2021 |
COT - LCBU - Preslab |
TGAUSP |
Partial Approval |
Entered by VLEON1 - Partial Approval-PA, for Hanger Gridline B.50-C.50 |
| 04/12/2021 |
COT - LCBU - Preslab |
DMUNIZ |
Partial Approval |
Entered by RSALDAT1 - Partial, Slab inspected from GL-D to C.5.0, & GL-B to B.5.0 these two slabs ok for concrete. |
| 03/30/2021 |
COT - LCBU - Preslab |
DMUNIZ |
Partial Approval |
Entered by VLEON1 - Partial, see previous notes.
|
| 03/26/2021 |
COT - LCBU - Preslab |
DMUNIZ |
Partial Approval |
Entered by VLEON1 - Partial, Slab ok for concrete for (GL-A to B). |