Permit: T19CM09411
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
3515 E FLOWER ST
Address NEW:
3515 E FLOWER ST
Apply Date:
12/23/2019
Applicant:
Description:
E - CONSTRUCT ADDITION TO SFR
Permit Reviews
Permit Number - T19CM09411
Permit Status: Expired
Permit Description: E - CONSTRUCT ADDITION TO SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/06/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 01/07/2020 | COMPLETED |
| 01/07/2020 | RESUBMITTAL | 01/10/2020 | COMPLETED |
| 09/21/2020 | REVISION - - 1ST | 12/07/2020 | COMPLETED |
| 12/07/2020 | RESUBMITTAL | 03/01/2021 | COMPLETED |
| 12/23/2019 | PLANS OK TO SUBMIT - RES | 12/30/2019 | COMPLETED |
| 12/30/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 01/06/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM09411
Permit Status: Expired
Permit Description: E - CONSTRUCT ADDITION TO SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/23/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T19CM09411
Permite Description: E - CONSTRUCT ADDITION TO SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSME - Mechanical Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | RSBU - Building Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSPL - Plumbing Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Electrical Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM09411
Permit Description: E - CONSTRUCT ADDITION TO SFR
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2020 | COT - RSBU - Preslab | Passed | {Activity date: 01/14/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Clean loose dirt out of footings before pour. Install green tracer wire on abs outside of house, before backfill. Need plumbing wrapped where contacting concrete before pour. Box around shower drain stub up to allow for location adjustment later if needed. Note: bath fixture layout is different from plan. Confirm with owner before pour, their acceptance of the layout change.} |
|
| 01/14/2020 | COT - RSPL - Rough Soil | Passed | {Activity date: 01/14/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Clean loose dirt out of footings before pour. Install green tracer wire on abs outside of house, before backfill. Need plumbing wrapped where contacting concrete before pour. Box around shower drain stub up to allow for location adjustment later if needed. Note: bath fixture layout is different from plan. Confirm with owner before pour, their acceptance of the layout change.} |
|
| 01/14/2020 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 01/14/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Clean loose dirt out of footings before pour. Install green tracer wire on abs outside of house, before backfill. Need plumbing wrapped where contacting concrete before pour. Box around shower drain stub up to allow for location adjustment later if needed. Note: bath fixture layout is different from plan. Confirm with owner before pour, their acceptance of the layout change.} |
|
| 02/05/2020 | COT - RSBU - Roof Nailing | Passed | {Activity date: 02/05/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
| 02/05/2020 | COT - LCBU - Framing | Passed | {Activity date: 02/05/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
| 02/05/2020 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 02/05/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - RS AP, RESEARCH FOUND THAT INSPECTOR MISSED COMMUNCIATING INSPECTION, ROOF NAILING, FRAMING AND INTERMEDIATE AP PRIOR.} | |
| 03/03/2020 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 03/03/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by SFLORES2 - } |