Permit: T19CM07022
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
990 W 34TH ST
Address NEW:
990 W 34TH ST
Apply Date:
09/25/2019
Applicant:
Jose Martinez
Description:
NEW SFR
Permit Reviews
Permit Number - T19CM07022
Permit Status: Inspections
Permit Description: NEW SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/25/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 09/25/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM07022
Permit Status: Inspections
Permit Description: NEW SFR
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/10/2021 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
| 09/25/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 09/25/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T19CM07022
Permite Description: NEW SFR
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 05/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 11/24/2025 Ensure lath and windows are in place prior to intermediate. Add nails to h25 clips. Add shot pins to interior walls 6" from edges and every 24" o.c. Pex lines have to be 12" from any can lights. Seal all exterior and top penetrations. Missing smoke detector in hallway. Flex duct have to be replace due to weather damage. Secure ABS pipes mid way throughout. Add Boca plates to both top and bottom plates at lines that are less than an 1 1/4". Secure pex lines ' vertically and 32" horizontally. Provide 18" off copper before transition to pex at main water line and water heater. Electrical panel is not grounded. 5/27/26: per previous notes, pex A using pex B fittings, damaged NM cable at master bedroom. |
| 09/07/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 05/27/2026 | RSEL - Electrical Progress | N/A | Re-inspection required | 11/24/2025 Ensure lath and windows are in place prior to intermediate. Add nails to h25 clips. Add shot pins to interior walls 6" from edges and every 24" o.c. Pex lines have to be 12" from any can lights. Seal all exterior and top penetrations. Missing smoke detector in hallway. Flex duct have to be replace due to weather damage. Secure ABS pipes mid way throughout. Add Boca plates to both top and bottom plates at lines that are less than an 1 1/4". Secure pex lines ' vertically and 32" horizontally. Provide 18" off copper before transition to pex at main water line and water heater. Electrical panel is not grounded. 5/27/26: per previous notes, pex A using pex B fittings, damaged NM cable at master bedroom. |
| 05/27/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 5/27/26: Not ready (shear panels throughout), anchor bolts required throughout |
| 10/27/2022 | COT - LCBU - Framing | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections
Permit Number: T19CM07022
Permit Description: NEW SFR
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - APPROVED} | |
| 05/10/2022 | COT - RSBU - Preslab | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - APPROVED} | |
| 05/10/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - APPROVED} | |
| 03/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 07/10/2025 | RSME - Mechanical Progress | Passed | All registers have been blocked on 3 sides. | |
| 05/15/2026 | COT - RSPL - Rough Soil | Passed | 05/15/2026 Verified holding under test. |
|
| 06/11/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/11/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 06/11/2026 | RSEL - Electrical Progress | Passed | ||
| 06/11/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/02/2026 | COT - LCBU - Framing | Passed |