Permit: T19CM07022

Parcel: 118110470


Addresses:

990 W 34TH ST

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
11/18/2021 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. TGAUSP Not ready for Inspection Entered by RSALDAT1 - NR, cancelled by Owner - no progress on project
01/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/17/23: only wanted a mechanical inspection registers not blocked on three sides
5/13/24:only wanted a mechanical inspection registers not blocked on three sides
1/10/24: support bathroom exhaust flex above trusses with approved strap, plumbing in wall under pressure. DWV under pressure and per plans. Seal all penetrations going through top plate and vapor barrier. Ok to proceed. Items listed will be checked at re-inspection. Electrical rough-in not ready and house must be lathed.
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5/13/24:only wanted a mechanical inspection registers not blocked on three sides
05/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/24/2025 Ensure lath and windows are in place prior to intermediate. Add nails to h25 clips. Add shot pins to interior walls 6" from edges and every 24" o.c. Pex lines have to be 12" from any can lights. Seal all exterior and top penetrations. Missing smoke detector in hallway. Flex duct have to be replace due to weather damage. Secure ABS pipes mid way throughout. Add Boca plates to both top and bottom plates at lines that are less than an 1 1/4". Secure pex lines ' vertically and 32" horizontally. Provide 18" off copper before transition to pex at main water line and water heater. Electrical panel is not grounded.
5/27/26: per previous notes, pex A using pex B fittings, damaged NM cable at master bedroom.
06/11/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/17/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/17/23: only wanted a mechanical inspection registers not blocked on three sides
11/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 11/24/2025 Ensure lath and windows are in place prior to intermediate. Add nails to h25 clips. Add shot pins to interior walls 6" from edges and every 24" o.c. Pex lines have to be 12" from any can lights. Seal all exterior and top penetrations. Missing smoke detector in hallway. Flex duct have to be replace due to weather damage. Secure ABS pipes mid way throughout. Add Boca plates to both top and bottom plates at lines that are less than an 1 1/4". Secure pex lines ' vertically and 32" horizontally. Provide 18" off copper before transition to pex at main water line and water heater. Electrical panel is not grounded.