Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | Not Ready | ||
| 01/10/2025 | COT - LCPL - Plumbing Intermediate | Re-inspection required | 11/17/23: only wanted a mechanical inspection registers not blocked on three sides 5/13/24:only wanted a mechanical inspection registers not blocked on three sides 1/10/24: support bathroom exhaust flex above trusses with approved strap, plumbing in wall under pressure. DWV under pressure and per plans. Seal all penetrations going through top plate and vapor barrier. Ok to proceed. Items listed will be checked at re-inspection. Electrical rough-in not ready and house must be lathed. |
|
| 05/15/2026 | COT - LCPL - Plumbing Intermediate | Not Ready | 5/15/2026 the condition of materials have been exposed to weather. The integrity of the osb sheathing has been affected due to weather and time of being exposed. Previous notes have not been corrected or completed. | |
| 06/11/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 09/07/2023 | COT - LCPL - Plumbing Intermediate | Not Ready |