Permit: T19CM04398
Permit Details
Apply Date:
06/19/2019
Applicant:
Description:
SFR LEN400518 T18-M0079
Permit Reviews
Permit Number - T19CM04398
Permit Status: Expired
Permit Description: SFR LEN400518 T18-M0079
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/19/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 06/21/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM04398
Permit Status: Expired
Permit Description: SFR LEN400518 T18-M0079
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/19/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T19CM04398
Permit Status: Expired
Permit Description: SFR LEN400518 T18-M0079
Date | Description | Comments |
---|---|---|
06/19/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
06/19/2019 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM04398
Permit Description: SFR LEN400518 T18-M0079
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2019 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/09/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - Ok to backfill } |
|
08/09/2019 | COT - RSPL - Sewer | Passed | {Activity date: 08/09/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - Ok to backfill } |
|
08/12/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/12/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/09/2019; Status: Denied; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - Need all dwv to have water in it, dwv in back left of house did not have any water in it at time of inspection, do not backfill until that section is under test and approved} | |
08/16/2019 | COT - RSBU - Preslab | Passed | {Activity date: 08/16/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - Ok for concrete placement } |
|
08/16/2019 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/16/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - } | |
08/19/2019 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/19/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - Ufer is installed } ; {Activity date: 08/16/2019; Status: Denied; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. Missing ufer } |
|
08/19/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/19/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - All corrections complete, ok for concrete placement } ; {Activity date: 08/16/2019; Status: Denied; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. Missing hold downs at garage, 2. Interior footings are too small and missing rebar 3. All exterior footings need to be a minimum of 18" deep } |
|
09/05/2019 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/05/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
09/05/2019 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/05/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
10/01/2019 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 10/01/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DMERANZ1 - CODE ECO} | |
10/01/2019 | COT - RSEL - Construction Power | Passed | {Activity date: 10/01/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (RVI)} | |
11/15/2019 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 11/15/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
11/18/2019 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 11/18/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - All corrections have been made, ok to proceed. } ; {Activity date: 11/15/2019; Status: Denied; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - UFER Not properly attached. Anchor bolts missing at garage opening. Provide minimum clearance from B vent to combustibles. Duct branch fittings and Plenum’s not properly insulated. Duct pinched or compressed through trusses. Provide full radius bends at flex duct, choking at boot boxes not acceptable. Bathtub fitting leaking. Condensate piping penetrating top plate not sealed. Condensate piping draining uphill. Exhaust fans missing out laundry. Inspections stopped at this time this is not a complete list.} |
|
11/18/2019 | COT - LCBU - Framing | Passed | {Activity date: 11/18/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - All corrections have been made, ok to proceed. } ; {Activity date: 11/15/2019; Status: Denied; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - UFER Not properly attached. Anchor bolts missing at garage opening. Provide minimum clearance from B vent to combustibles. Duct branch fittings and Plenum’s not properly insulated. Duct pinched or compressed through trusses. Provide full radius bends at flex duct, choking at boot boxes not acceptable. Bathtub fitting leaking. Condensate piping penetrating top plate not sealed. Condensate piping draining uphill. Exhaust fans missing out laundry. Inspections stopped at this time this is not a complete list.} |
|
11/18/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 11/18/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - All corrections have been made, ok to proceed. } ; {Activity date: 11/15/2019; Status: Denied; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - UFER Not properly attached. Anchor bolts missing at garage opening. Provide minimum clearance from B vent to combustibles. Duct branch fittings and Plenum’s not properly insulated. Duct pinched or compressed through trusses. Provide full radius bends at flex duct, choking at boot boxes not acceptable. Bathtub fitting leaking. Condensate piping penetrating top plate not sealed. Condensate piping draining uphill. Exhaust fans missing out laundry. Inspections stopped at this time this is not a complete list.} |
|
11/18/2019 | RSME - Mechanical Progress | Passed | {Activity date: 11/18/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - All corrections have been made, ok to proceed. } ; {Activity date: 11/15/2019; Status: Denied; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - UFER Not properly attached. Anchor bolts missing at garage opening. Provide minimum clearance from B vent to combustibles. Duct branch fittings and Plenum’s not properly insulated. Duct pinched or compressed through trusses. Provide full radius bends at flex duct, choking at boot boxes not acceptable. Bathtub fitting leaking. Condensate piping penetrating top plate not sealed. Condensate piping draining uphill. Exhaust fans missing out laundry. Inspections stopped at this time this is not a complete list.} |
|
12/02/2019 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 12/02/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
02/10/2020 | COT - BULD - SWG Clearance | Passed | {Activity date: 02/10/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
02/18/2020 | COT - RSME - Mechanical Final | Passed | {Activity date: 02/18/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
02/18/2020 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 02/18/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
02/18/2020 | COT - RSPL - Plumbing Final | Passed | {Activity date: 02/18/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
02/18/2020 | RSPL - Plumbing Progress | Passed | {Activity date: 02/18/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
02/18/2020 | COT - RSEL - Electrical Final | Passed | {Activity date: 02/18/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - } | |
04/09/2020 | RSBU - Building Final | Passed | {Activity date: 04/09/2020; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - Special Inspection Cert filed} ; {Activity date: 02/18/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - APPROVEDBY INSPECTOR CLOSURE IS PENDING SPECIAL INSPECTION CERTIFICATE FOR POST TENSION SLAB} |