Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
SINGLE FAMILY ADDITION
Address NEW:
2009 S CAMILLA SV
Apply Date:
06/07/2019
Applicant:
DAN ROMERO
Description:
ADD BATHROOM/NEW AC & DUCT WORK/NEW ELECTRIC PANEL & WIRING
Contractors:
  • PIMA VENTURES LLC

Permit Reviews

Permit Number - T19CM04099
Permit Status: Expired
Permit Description: ADD BATHROOM/NEW AC & DUCT WORK/NEW ELECTRIC PANEL & WIRING
Start Date Submittal Complete Date Status  
06/07/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 06/07/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM04099
Permit Status: Expired
Permit Description: ADD BATHROOM/NEW AC & DUCT WORK/NEW ELECTRIC PANEL & WIRING
Total Outstanding Activity Conditions - 1
Date Name
06/07/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Expired
Permit Number: T19CM04099
Permite Description: ADD BATHROOM/NEW AC & DUCT WORK/NEW ELECTRIC PANEL & WIRING
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/25/2019 BUILDING - FINAL N/A Partial Approval SEE NOTES FOR 3090
07/25/2019 PLUMBING - FINAL N/A Correction Required Gas pipe exiting at the carport and around the corner to the water heater. Black iron gas pipe shall not be buried in the dirt/below grade. All metallic gas piping to be elevated, secured, and elevated 3 1/2 inches above the surface below it.

Open up the gas pipe trench for inspection. Fletcher coated piping (is used in place of black iron uncoated pipe) with sprayed and taped fittings, this needs to be seen/inspected and approved. Spray and tape must be listed for the gas piping application, see plumbing supply house.

Completed Inspections

Permit Status: Expired
Permit Number: T19CM04099
Permit Description: ADD BATHROOM/NEW AC & DUCT WORK/NEW ELECTRIC PANEL & WIRING
Total Completed Inspections - 10
Date Description Inspector Results Comments
06/25/2019 PLUMBING - ROUGH, SOIL AKLEINSORGE Approved Ok to backfill, master bathroom and 2nd bathroom
06/25/2019 BUILDING PRE-SLAB AKLEINSORGE Approved Ok for concrete placement after backfill in master bathroom and 2nd bathroom, wrap all plumbing penetrations with foam before concrete placement
06/25/2019 TEP CLEARANCE - PM AKLEINSORGE Approved CODE INCR
06/27/2019 RESIDENTIAL INTERMEDIATE AKLEINSORGE Approved All corrections complete
06/27/2019 FRAMING AKLEINSORGE Approved All corrections complete, finish installing nail protection plates where required before hanging drywall
06/27/2019 MECHANICAL - INTERMEDIATE AKLEINSORGE Approved Correction complete
07/19/2019 ROOF NAILING AKLEINSORGE Approved
07/25/2019 ELECTRIC - SERVICE UPGRADE GWEST Approved APPROVED PER 2090 APPROVAL
07/25/2019 ELECTRIC - FINAL GWEST Approved
07/25/2019 MECHANICAL - FINAL GWEST Approved

Documents

File Name Document Type  
None CONSTRPLANS VIEW
None DOCUMENTS VIEW