Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2019 | ELECTRIC - FINAL | Approved | ||
| 07/19/2019 | ELECTRIC - FINAL | Denied | 1. Need 2 diagonal braces coming off service riser (over 3’ tall), notes from 2065 inspection 2. Need to expose or install bonding wire to new gas line 3. Need to secure whip coming out of bottom of electrical panel and secure to wall at 2 locations for roof top heat pump 4. Label panel stating no water bond non metallic plumbing |