Permit: T19CM01829
Permit Details
Status:
Expired
Type:
Commercial Building
Address:
6442 E SPEEDWAY BL
Address NEW:
6442 E SPEEDWAY BL
Apply Date:
03/13/2019
Applicant:
Bobbie Varnum
Description:
NEW MEDICAL OFFICE SHELL
Permit Reviews
Permit Number - T19CM01829
Permit Status: Expired
Permit Description: NEW MEDICAL OFFICE SHELL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/14/2020 | 3RD PARTY REVIEW - REVISION/OTHER | 02/21/2020 | COMPLETED |
| 02/26/2020 | 3RD PARTY REVIEW - REVISION/OTHER | 03/11/2020 | COMPLETED |
| 03/13/2019 | PLANS OK TO SUBMIT - COMM | 09/05/2019 | COMPLETED |
| 09/06/2019 | 3RD PARTY REVIEW - COMMERCIAL | 10/16/2019 | COMPLETED |
| 10/16/2019 | POST 3RD PARTY REVIEW | 10/31/2019 | COMPLETED |
| 10/31/2019 | POST 3RD PARTY REVIEW | 01/14/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM01829
Permit Status: Expired
Permit Description: NEW MEDICAL OFFICE SHELL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/13/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T19CM01829
Permit Status: Expired
Permit Description: NEW MEDICAL OFFICE SHELL
| Date | Description | Comments |
|---|---|---|
| 12/05/2019 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 12/05/2019 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 12/05/2019 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 12/05/2019 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 12/05/2019 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 12/05/2019 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM01829
Permit Description: NEW MEDICAL OFFICE SHELL
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2019 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 12/06/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Exterior perimeter footer OK except north wall, no interior or post footers at this time.} | |
| 01/10/2020 | COT - LCBU - Stem Wall/Retaining Wall | Passed | {Activity date: 01/10/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Builder had drawing from EOR for change to mono pour.} ; {Activity date: 12/23/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by SFLORES2 - Canceled by contractor} ; {Activity date: 12/13/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - Builder wanted footings, but it was approved.} | |
| 02/03/2020 | COT - LCBU - Preslab | Passed | {Activity date: 02/03/2020; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/24/2020; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Observed compacted AB before installation of vapor barrier.} | |
| 02/18/2020 | COT - HCBU - Exterior Clips/Sheathing | Passed | {Activity date: 02/18/2020; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/14/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by SFLORES2 - Wall sheathing and stucco on column line 0.A grid line 0.2 to 1.0.} | |
| 04/10/2020 | COT - LCBU - Roof Nailing | Passed | {Activity date: 04/10/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - } | |
| 04/20/2020 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 04/20/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Inspection cancel by contractor} ; {Activity date: 04/16/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval exterior sheer is complete, ok to lath} ; {Activity date: 02/19/2020; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Work incomplete. IVR not working to check messages. Super not on site.} ; {Activity date: 02/14/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by SFLORES2 - Wall sheathing and stucco on column line 0.A grid line 0.2 to 1.0.} | |
| 04/22/2020 | COT - LCBU - Framing | Passed | {Activity date: 04/22/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/20/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VFLORES1 - Inspection cancel by contractor} | |
| 06/08/2020 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 06/08/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved shell only } |
|
| 06/19/2020 | ENGR Grading Final | Passed | {Activity date: 06/19/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} ; {Activity date: 02/04/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THIS WAS THE INSPECTION NEEDED FOR TODAY, BUT THE CONTRACTOR POURED THE STRUCTURE BEFORE I INSPECTED THE REBAR. THE HORIZONTAL REBAR IN THE FOOT WAS OK, BUT THE VERTICAL REBAR WAS INCORRECT. THE CONTRACTOR PLACED THE VERTICAL BARS AS #4 AT 48 INCHES ON CENTER AND THEY SHOULD HACE BEEN NO MORE THAN 32 INCHES ON CENTER. I HAVE DIRECTED THE PRIME CONTRACTOR/CAYLOR CONSTRUCTION TO HAVE THE SUBCONTRACTOR DRILL AND DOWL #4 REBAR INTO THE FOOTER AT EVERY LOCATION THAT IS WIDER THA 32 INCHES AND THEN RECALL THE INSPECTION IN PRIOR TO PLACING ANY BLOCKS FOR THE WALL CONSTRUCTION.} | |
| 06/26/2020 | COT - FCON - Alarm - Final | Passed | {Activity date: 06/26/2020; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
| 06/26/2020 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 06/26/2020; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
| 06/26/2020 | COT - FCON - Fire - Final | Passed | {Activity date: 06/26/2020; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
| 06/30/2020 | COT - LCBU - Building Final | Passed | {Activity date: 06/30/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by JSCHNEI2 - Approved} | |
| 06/30/2020 | COT - LCBU - Sustainability | Passed | {Activity date: 06/30/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by JSCHNEI2 - Approved} | |
| 07/08/2020 | ENGR Engineering Final | Passed | {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/02/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME, OK FOR TCO STOCKING ONLY PENDING ALL OTHER INSPECTIONS BEING APPROVED FOR THIS PERMIT, AND CLARIFICATION OF THE ZONING FINAL REQUIREMENTS. ADDITIONAL PERSONNEL HAVE BEEN NOTED WITHIN THIS STRUCTURE ON THIS DATE DURING MY INSPECTION. I HAVE ADVISED DAVID/CAYLOR CONSTRUCTION THAT THEY NEEDED TO LEAVE THIS SITE. NO ONE IS ALLOWED ON THIS SITE EXCEPT CAYLOR PERSONNEL AND THEIR SUBCONTRACTORS.} ; {Activity date: 07/01/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all work on development package Dp18-0280 Before calling for final.} ; {Activity date: 06/26/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Complete all work on development package before final.} ; {Activity date: 02/04/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } |