Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/08/2020 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by JSCHNEI2 - Approved. |
| 07/02/2020 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by RSALDAT1 - PARTIAL AT THIS TIME, OK FOR TCO STOCKING ONLY PENDING ALL OTHER INSPECTIONS BEING APPROVED FOR THIS PERMIT, AND CLARIFICATION OF THE ZONING FINAL REQUIREMENTS.
ADDITIONAL PERSONNEL HAVE BEEN NOTED WITHIN THIS STRUCTURE ON THIS DATE DURING MY INSPECTION. I HAVE ADVISED DAVID/CAYLOR CONSTRUCTION THAT THEY NEEDED TO LEAVE THIS SITE. NO ONE IS ALLOWED ON THIS SITE EXCEPT CAYLOR PERSONNEL AND THEIR SUBCONTRACTORS. |
| 07/01/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Complete all work on development package Dp18-0280 Before calling for final. |
| 06/26/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Complete all work on development package before final. |
| 02/04/2020 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by DMERANZ1 - |