Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/19/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by RSALDAT1 - IS APPROVED |
| 02/04/2020 |
ENGR Grading Final |
DROBERTS |
Not ready for Inspection |
Entered by DMERANZ1 - THIS WAS THE INSPECTION NEEDED FOR TODAY, BUT THE CONTRACTOR POURED THE STRUCTURE BEFORE I INSPECTED THE REBAR. THE HORIZONTAL REBAR IN THE FOOT WAS OK, BUT THE VERTICAL REBAR WAS INCORRECT. THE CONTRACTOR PLACED THE VERTICAL BARS AS #4 AT 48 INCHES ON CENTER AND THEY SHOULD HACE BEEN NO MORE THAN 32 INCHES ON CENTER. I HAVE DIRECTED THE PRIME CONTRACTOR/CAYLOR CONSTRUCTION TO HAVE THE SUBCONTRACTOR DRILL AND DOWL #4 REBAR INTO THE FOOTER AT EVERY LOCATION THAT IS WIDER THA 32 INCHES AND THEN RECALL THE INSPECTION IN PRIOR TO PLACING ANY BLOCKS FOR THE WALL CONSTRUCTION. |