Permit: T18RW02982
Permit Details
Apply Date:
07/06/2018
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
See City of Tucson Contract #181908. Reconstruction of Valencia Road and Kolb Road intersection with a Parkway At Grade Intersection (PAGI), widen Valencia Road to 6 lanes (typical) and construct new alignment Northeast Ramp and Southeast Ramp. New 12" sanitary sewer, 12" water line, and storm drains. Valencia Road - Wilmot Road to Kolb Road Improvements Plan No. I-2015-014 09/11/18 - SEE ADDITIONAL NOTES ON TRAFFIC CONTROL PLANS 9/27/18 WORK DESCRIPTION ADDITION: Emergency utility conflict resolution. Century Link contractor to excavate 20' in all directions to adjust elevation of line in conflict. Line is located just west of the intersection of Kolb and Valencia. 12/05/2018-PLAN CHANGE ON TCP- TEMPORARY TC PLAN FOR NIGHT WORK 12/09/2018-NOTES ON TCP ARE AS INDICATED; 25 MILES IN CONSTRUCTION ZONE. WORK HOURS ARE 10:00PM TO 5:00AM* * ALL TRAFFIC CONTROL MOVED BACK TO PERMANET CONFIGURATION. NO LATER THAN 5:00AM 12/10/2018. COVER WHILE NOT IN USE. NOTE: SHERIFFS TO BE ON SITE PERFORMING TRAFFIC CONTROL POINT CONTROL. ALL TURN MOVEMENTS TO BE MAINTAINED. 12/10/18 - PLAN CHANGE - SHIFT TRAFFIC FROM NORTH SIDE OF ROAD TO SOUTH SIDE OF NEW PAVMENT. 12/18/18 REVISED TCP PLANS TO SHOW TRAFFIC SWITCH FOR PHASE 2. SWITCH WILL TAKE PLACE BETWEEN 3 AM AND 6 AM. 01/24/19 - FINAL REVISION 06/19/2019- PLAN CHANGE 07/01/2019-PLAN CHANGE- REMOVAL OF LEFT TURNS AT INTERSECTION A, ADDITION OF INTERSECTION D (LIVE) AND USE OF INTERSECTIONS B AND C (NO SIGNAL). ALSO, REQUESTING 30 DAY RENEWAL OF ROW PERMIT FOR FINAL COMPLETION.
Contractors:
- P.A.C.E. ELECTRICAL CONSTRUCTION INC
Completed Inspections
Permit Status: Final
Permit Number: T18RW02982
Permit Description: See City of Tucson Contract #181908. Reconstruction of Valencia Road and Kolb Road intersection with a Parkway At Grade Intersection (PAGI), widen Valencia Road to 6 lanes (typical) and construct new alignment Northeast Ramp and Southeast Ramp. New 12" sanitary sewer, 12" water line, and storm drains.
Valencia Road - Wilmot Road to Kolb Road Improvements
Plan No. I-2015-014
09/11/18 - SEE ADDITIONAL NOTES ON TRAFFIC CONTROL PLANS
9/27/18 WORK DESCRIPTION ADDITION:
Emergency utility conflict resolution. Century Link contractor to excavate 20' in all directions to adjust elevation of line in conflict. Line is located just west of the intersection of Kolb and Valencia.
12/05/2018-PLAN CHANGE ON TCP-
TEMPORARY TC PLAN FOR NIGHT WORK 12/09/2018-NOTES ON TCP ARE AS INDICATED; 25 MILES IN CONSTRUCTION ZONE. WORK HOURS ARE 10:00PM TO 5:00AM* * ALL TRAFFIC CONTROL MOVED BACK TO PERMANET CONFIGURATION. NO LATER THAN 5:00AM 12/10/2018. COVER WHILE NOT IN USE.
NOTE: SHERIFFS TO BE ON SITE PERFORMING TRAFFIC CONTROL POINT CONTROL. ALL TURN MOVEMENTS TO BE MAINTAINED.
12/10/18 - PLAN CHANGE - SHIFT TRAFFIC FROM NORTH SIDE OF ROAD TO SOUTH SIDE OF NEW PAVMENT.
12/18/18 REVISED TCP PLANS TO SHOW TRAFFIC SWITCH FOR PHASE 2. SWITCH WILL TAKE PLACE BETWEEN 3 AM AND 6 AM.
01/24/19 - FINAL REVISION
06/19/2019- PLAN CHANGE
07/01/2019-PLAN CHANGE-
REMOVAL OF LEFT TURNS AT INTERSECTION A, ADDITION OF INTERSECTION D (LIVE) AND USE OF INTERSECTIONS B AND C (NO SIGNAL). ALSO, REQUESTING 30 DAY RENEWAL OF ROW PERMIT FOR FINAL COMPLETION.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/26/2019 | TDOT-EXCAV GENERAL INSPECTION | BMONG | Approved | THIS JOB IS ASSOCIATED WITH THE KOLB AND VALENCIA JOB |