Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel14106009E
JurisdictionTucson
City of Tucson ZoningC-1, PAD-26
Water Course

Washes

Airport Environs Zone

Tucson International AEZ Paddle

,

NCD-B Davis Monthan AEZ Paddle

Tucson WardWard 4
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Permits

Date - 09/20/2024 6:49 p.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
T18RW02982 Final 07/06/2018 07/04/2019 ROW See City of Tucson Contract #181908. Reconstruction of Valencia Road and Kolb Road intersection with a Parkway At Grade Intersection (PAGI), widen Valencia Road to 6 lanes (typical) and construct new alignment Northeast Ramp and Southeast Ramp. New 12" sanitary sewer, 12" water line, and storm drains. Valencia Road - Wilmot Road to Kolb Road Improvements Plan No. I-2015-014 09/11/18 - SEE ADDITIONAL NOTES ON TRAFFIC CONTROL PLANS 9/27/18 WORK DESCRIPTION ADDITION: Emergency utility conflict resolution. Century Link contractor to excavate 20' in all directions to adjust elevation of line in conflict. Line is located just west of the intersection of Kolb and Valencia. 12/05/2018-PLAN CHANGE ON TCP- TEMPORARY TC PLAN FOR NIGHT WORK 12/09/2018-NOTES ON TCP ARE AS INDICATED; 25 MILES IN CONSTRUCTION ZONE. WORK HOURS ARE 10:00PM TO 5:00AM* * ALL TRAFFIC CONTROL MOVED BACK TO PERMANET CONFIGURATION. NO LATER THAN 5:00AM 12/10/2018. COVER WHILE NOT IN USE. NOTE: SHERIFFS TO BE ON SITE PERFORMING TRAFFIC CONTROL POINT CONTROL. ALL TURN MOVEMENTS TO BE MAINTAINED. 12/10/18 - PLAN CHANGE - SHIFT TRAFFIC FROM NORTH SIDE OF ROAD TO SOUTH SIDE OF NEW PAVMENT. 12/18/18 REVISED TCP PLANS TO SHOW TRAFFIC SWITCH FOR PHASE 2. SWITCH WILL TAKE PLACE BETWEEN 3 AM AND 6 AM. 01/24/19 - FINAL REVISION 06/19/2019- PLAN CHANGE 07/01/2019-PLAN CHANGE- REMOVAL OF LEFT TURNS AT INTERSECTION A, ADDITION OF INTERSECTION D (LIVE) AND USE OF INTERSECTIONS B AND C (NO SIGNAL). ALSO, REQUESTING 30 DAY RENEWAL OF ROW PERMIT FOR FINAL COMPLETION.

Documents

File Name Document Type  
T18RW02982.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R2.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R3.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R4.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R5.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R6.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 A1.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R7.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R8.PDF ROW-RIGHT OF WAY VIEW
T18RW02982 R10.PDF ROW-RIGHT OF WAY VIEW