Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 6175 S KOLB RD
Search
Parcel Attributes
Parcel | 14106009E 14103036B 14103037B 14103038B 14103039A 14105043G 14105043K 14105043L 14106009G 14106009H 14106020A 14106020C 14106020D 14106020E |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | PAD-26, C-1 |
Water Course | Washes |
Airport Environs Zone | NCD-B Davis Monthan AEZ Paddle ,Tucson International AEZ Paddle |
Tucson Ward | Ward 4 |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Permits
Address: 6175 S KOLB RD
Date - 11/13/2024 4:57 a.m.
Total Number Of Permits - (10)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-1222-00374 | Issued | 12/28/2022 | 10/13/2024 | Commercial Building | Interior remodel of an existing convenience store. install new food reheating equipment | |
TF-FOP-1223-01977 | Complete | 12/22/2023 | 05/07/2025 | Fire Operational Permit | DOUBLE EXPEDITE - Relocate bulk CO2 tank and CO2 detection system. | |
TF-FCP-1223-01392 | Void | 12/12/2023 | N/A | Fire Construction Permit | VOID-Submit a Fire Other IFC Construction Permit, Attach AZROC, Attach COT Business License, Add Owner information & Apply for a General Operational Permit - Bulk CO2 relocation and installation of CO2 monitoring system | |
T22RW02876 | Complete | 08/11/2022 | 03/16/2023 | Right-of-Way (ROW) | WO 6332496. DIG 1-4' HOLE, 1-5' HOLE & 1-6' HOLE TO INSTALL 3 POLES AND 1780' OF OVERHEAD WIRE. Work Order: 6332496 LAW ENFORCEMENT TO WAIT ON STANDBY UNTIL INSTRUCTED BY CONTRACTOR TO STOP AND HOLD TRAFFIC ON VALENCIA RD TO ALLOW CREW TO RUN AERIAL LINE CROSSING. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
TF-FCP-0324-00195 | Complete | 03/11/2024 | 09/28/2024 | Fire Construction Permit | DOUBLE EXPEDITE - Install CO2 Detection System for existing to remain bulk CO2 tank | |
TR-ROW-0224-00166 | Issued | 02/14/2024 | 06/03/2024 | Right-of-Way (ROW) | Sewer work along Loop Ramp Rd. at Valencia Rd. Work associated with Development package TD-DEV-0323-00170. | |
T18RW02982 | FINAL | 07/06/2018 | 07/04/2019 | ROW | See City of Tucson Contract #181908. Reconstruction of Valencia Road and Kolb Road intersection with a Parkway At Grade Intersection (PAGI), widen Valencia Road to 6 lanes (typical) and construct new alignment Northeast Ramp and Southeast Ramp. New 12" sanitary sewer, 12" water line, and storm drains. Valencia Road - Wilmot Road to Kolb Road Improvements Plan No. I-2015-014 09/11/18 - SEE ADDITIONAL NOTES ON TRAFFIC CONTROL PLANS 9/27/18 WORK DESCRIPTION ADDITION: Emergency utility conflict resolution. Century Link contractor to excavate 20' in all directions to adjust elevation of line in conflict. Line is located just west of the intersection of Kolb and Valencia. 12/05/2018-PLAN CHANGE ON TCP- TEMPORARY TC PLAN FOR NIGHT WORK 12/09/2018-NOTES ON TCP ARE AS INDICATED; 25 MILES IN CONSTRUCTION ZONE. WORK HOURS ARE 10:00PM TO 5:00AM* * ALL TRAFFIC CONTROL MOVED BACK TO PERMANET CONFIGURATION. NO LATER THAN 5:00AM 12/10/2018. COVER WHILE NOT IN USE. NOTE: SHERIFFS TO BE ON SITE PERFORMING TRAFFIC CONTROL POINT CONTROL. ALL TURN MOVEMENTS TO BE MAINTAINED. 12/10/18 - PLAN CHANGE - SHIFT TRAFFIC FROM NORTH SIDE OF ROAD TO SOUTH SIDE OF NEW PAVMENT. 12/18/18 REVISED TCP PLANS TO SHOW TRAFFIC SWITCH FOR PHASE 2. SWITCH WILL TAKE PLACE BETWEEN 3 AM AND 6 AM. 01/24/19 - FINAL REVISION 06/19/2019- PLAN CHANGE 07/01/2019-PLAN CHANGE- REMOVAL OF LEFT TURNS AT INTERSECTION A, ADDITION OF INTERSECTION D (LIVE) AND USE OF INTERSECTIONS B AND C (NO SIGNAL). ALSO, REQUESTING 30 DAY RENEWAL OF ROW PERMIT FOR FINAL COMPLETION. | |
T20RW02647 | FINAL | 05/11/2020 | 07/10/2020 | ROW | VALENCIA ROAD - WILMOT ROAD TO KOLB ROAD INTERSECTION & PAVING IMPROVEMENT, PLAN NO. I-2015-014 DEMO CONCRETE LINED CHANNEL, INSTALL APPROXIMATELY 600 LF OF 36" RCP PIPES AND NEW DRIVEWAY ACCESS. | |
T21RW02422 | FINAL | 05/17/2021 | 06/20/2021 | ROW | AIR-VACUUM EXCAVATION OF 27 UTILITY POTHOLES APPROXIMATELY 12"X12" IN SIZE FOR THE COT DOT DESIGN PHASE OF VALENCIA ROAD: KOLB ROAD TO HOUGHTON ROAD PROJECT | |
T21RW03858 | FINAL | 08/19/2021 | 11/22/2021 | ROW | VALENCIA ROAD: WILMOT ROAD TO KOLB ROAD COT PLAN NO. I-2015-014, TIP ID #158.07 INSTALLATION OF TUFF CURB AND PREFORMED MARKERS ON THE GROUND PER THE ATTACHED APPROVED COT PLANS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 08/25/2021 - PLAN ADD - R1 PLAN ADD FOR OBLITERATION OF MERGE ARROWS |
Plans
Address: 6175 S KOLB RD
Date - 11/13/2024 4:57 a.m.
Total Number Of Plans - (3)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
C15-18-07 | EFFECTED | 12/17/2018 | 06/07/2019 | Original City Zoning -- REZONE | ||
T18PRE0124 | PLAN CK | 10/29/2018 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
T19PRE0096 | CLOSED | 06/03/2019 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | BASSETT PROPERTIES |
Record Requests
Address: 6175 S KOLB RD
Date - 11/13/2024 4:57 a.m.
Total Number Of Requests - (2)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0424-03238 | Complete | 04/30/2024 | 05/02/2024 | Requests | Sewer work along Loop Ramp Rd. at Valencia Rd. Work associated with Development package TD-DEV-0323-00170. We are looking to pour the scupper and 212 manhole collars this week. Looking to clean up grade in advance of any concrete pours. Need an additional time will be less than 30 days. |
REQ-1122-00075 | Complete | 11/09/2022 | 12/22/2022 | Requests | *(Please renew for 60 days)* WO 6332496. DIG 1-4' HOLE, 1-5' HOLE & 1-6' HOLE TO INSTALL 3 POLES AND 1780' OF OVERHEAD WIRE.L; Work Order: 6332496 |