Permit: T18CM09934
Permit Details
Apply Date:
12/21/2018
Applicant:
MATTAMY ARIZONA CONSTRUCTION L L C ** APA **
Description:
SFR F40J18 T18-M0042
Contractors:
- MATTAMY ARIZONA CONSTRUCTION L L C ** APA **
Permit Reviews
Permit Number - T18CM09934
Permit Status: Expired
Permit Description: SFR F40J18 T18-M0042
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/21/2018 | RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU | 12/21/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM09934
Permit Status: Expired
Permit Description: SFR F40J18 T18-M0042
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
12/21/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
12/21/2018 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
12/21/2018 | SPECIAL INSPECTION IS REQUIRED FOR ANCHORS EMBEDDED IN CONCRETE |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM09934
Permit Description: SFR F40J18 T18-M0042
Total Completed Inspections - 35
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2018 | PLUMBING - FINAL | GKOZIOL | Approved | ISSUED WITH CONDITIONS: NO CONNECTION OF THE PRIVATE SEWER TO THE PUBLIC SEWER MANHOLE #5 ON G-17-108 UNTIL THE PUBLIC SEWERS G-2017-062/G-2017-067/G-2017-108 ARE ACCEPTED AND RELEASED AND A MANHOLE TAP PERMIT HAS BEEN ISSUED BY PCRWRD - SYLVIA. QUINLAN@PIMA.GOV - 520-724-6649 NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATIONS (D.A.'S) FOR THE PRIVATE SEWER WITH LIFT STATION & FORCE MAIN(P18SD00009/P18SD00022) AND THE DISCHARGE AUTHORIZATIONS (D. A.'S) FOR PUBLIC SEWERS G-2017-108/G-2017-067/G-2017-062 ARE ISSUED BY PDEQ NO PHYSICAL CONNECTION TO THE PUBLIC SEWER SYSTEM UNTIL THE PUBLIC SEWERS G-2017-108/G-2017-067/G-2017-062 ARE ACCEPTED AND RELEASED BY PCRWRD NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWERS G-2017-108/G-2017-067/G-2017-062 ARE ACCEPTED AND RELEASED BY PCRWRD |
01/22/2019 | PLUMBING - ROUGH, SOIL | BJONES | Approved | |
01/29/2019 | ELECTRIC - UNDERGROUND | DMUNIZ | Approved | |
01/29/2019 | ELECTRIC - UFER | DMUNIZ | Approved | |
01/29/2019 | BUILDING PRE-SLAB | DMUNIZ | Approved | |
01/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | DMUNIZ | Approved | |
01/29/2019 | ELECTRIC - UNDERGROUND | BJones | Approved | |
01/29/2019 | ELECTRIC - UFER | BJones | Approved | |
01/29/2019 | BUILDING PRE-SLAB | BJones | Approved | |
01/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | BJones | Approved | |
02/21/2019 | ROOF NAILING | DQUINN | Approved | |
02/21/2019 | EXT METAL CLIPS/EXT SHEATHING | DQUINN | Approved | |
04/01/2019 | MECHANICAL - INTERMEDIATE | AKLEINSORGE | Approved | Fire foam around hot water heater vent pipe at all levels Completely nail boca plates at 2” drain lines in front living room Move all pex lines at least 12” away from can lights Properly secure 4 gang light switch box’s in living room/kitchen (2 total) Provide blocking on 3 sides of jumper duct boots between living room and office Completely nail boca plate at 3” drain line next to sliding down to backyard Provide blocking on 3 sides of jumper duct boots between hallway and bedroom upstairs Provide blocking on 3 sides of duct boot in upstairs bathroom Potable water had no air pressure in the lines gauge read 0 psi Missing light in 2nd bathroom over tub and cut romex line at gfci Broken can light at top of stairs and missing can light above stair landing |
04/01/2019 | PLUMBING - GAS PRESSURE TEST | AKLEINSORGE | Approved | |
04/03/2019 | PLUMBING - INTERMEDIATE | TVALENCIA | Approved | |
04/03/2019 | ELECTRIC - INTERMEDIATE | TVALENCIA | Approved | |
04/03/2019 | FRAMING | TVALENCIA | Approved | |
04/03/2019 | PLUMBING - INTERMEDIATE | DQUINN | Approved | Bearing top plate no a plates must be totally nailed off, not screwed. |
04/03/2019 | ELECTRIC - INTERMEDIATE | DQUINN | Approved | 4 gangs in living/kitchen still not secured. |
04/03/2019 | FRAMING | DQUINN | Approved | Fire foam b vent escutcheons at all penetrations |
04/16/2019 | PLUMBING - SEWER HCS CONNECT | DMUNIZ | Approved | |
05/16/2019 | SHEET ROCK NAILING | DQUINN | Approved | |
05/23/2019 | TEP CLEARANCE - PM | DQUINN | Approved | CODE ECO |
05/23/2019 | ELECTRIC - CONSTRUCTION POWER | DQUINN | Approved | Clear eco |
07/10/2019 | PLUMBING - YARD WTR LINE/TEST | DMUNIZ | Approved | |
07/10/2019 | GAS CLEARANCE | DMUNIZ | Approved | |
07/12/2019 | FIRE SPKLR - FINAL | gsereno1 | Approved | |
07/12/2019 | ELECTRIC - FINAL | DMUNIZ | Approved | |
07/12/2019 | OUTDOOR LIGHTING FINAL | DMUNIZ | Approved | |
07/12/2019 | PLUMBING - BACK WATER VALVE | DMUNIZ | Approved | |
07/12/2019 | PLUMBING - PROGRESS | DMUNIZ | Approved | |
07/12/2019 | MECHANICAL - FINAL | DMUNIZ | Approved | |
07/12/2019 | ELECTRIC - SERVICE UPGRADE | DMUNIZ | Approved | |
07/12/2019 | BUILDING - FINAL | DMUNIZ | Approved | |
07/12/2019 | BUILDING - PROGRESS | DMUNIZ | Approved |