Permit Details

Status:
Final
Type:
SOLAR WAIVER - COMM
Address:
875 W CUSHING ST
Apply Date:
11/16/2018
Applicant:
EMPIRE RENEWABLE ENERGY LLC
Description:
PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Contractors:
  • EMPIRE RENEWABLE ENERGY LLC

Permit Reviews

Permit Number - T18CM09112
Permit Status: Final
Permit Description: PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Start Date Submittal Complete Date Status  
02/25/2019 RESUBMITTAL 02/25/2019 COMPLETED Review Details
04/25/2019 REVISION - - 1ST 04/25/2019 COMPLETED Review Details
11/16/2018 PLANS OK TO SUBMIT - COMM 12/13/2018 COMPLETED Review Details
12/13/2018 COMMERCIAL - BLDG/FIRE/ZONING/ENG 01/23/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM09112
Permit Status: Final
Permit Description: PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Total Outstanding Activity Conditions - 1
Date Name
11/16/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T18CM09112
Permit Description: PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Total Completed Inspections - 7
Date Description Inspector Results Comments
05/20/2019 ELECTRIC - INTERMEDIATE DMUNIZ Approved 1200AMP DG Cabinet TO 800AMP DG Disconnect.
DG Disconnect To 800AMP 3-Pole (48VDC Shunt Breaker). 3 sets of Parallel Conductors #300KCMIL, #1/0 Neutral, #1/0 Ground. Solar Cabinet Extension to Existing 8,000AMP SES Approved, Installed extension to Bus bar for Breaker back feed for Line side tap. Third party Inspection acquired and SES Re-certified. No TEP power-kill, Gear was locked out while Work was completed, ok to Re-energize.
1090- Partial. Final Inspection Pending final walk with contractor to insure all labeling is complete and Inverters are bonded.
2090- Partial- Walked job-site with Contractor all grounding and bonding looks ok. Except at one Inverter disclosed with Contractor and is to bond to EGC.
Ok to Clear TEP (DGL), Shall Not energize until final Inspections.
Note: Talk to Don Herman, Construction Manager regarding payment for after hours Inspection. Contractor disclosed that there have been overpayments on permit, and that Credit would be used for payment.
05/20/2019 ELECTRIC - UNDERGROUND DMUNIZ Approved
05/20/2019 FRAMING DMUNIZ Approved Special Inspections completed and collected Certificate.
05/20/2019 EXCAVATION/LAYOUT REBAR & ZON DMUNIZ Approved
06/07/2019 TEP CLEARANCE - PM BSTEVENS Approved CODE DGC
06/07/2019 ELECTRIC - FINAL BSTEVENS Approved
06/07/2019 BUILDING - FINAL BSTEVENS Approved

Documents

File Name Document Type  
001_PV 1.0.TIF CONSTRPLANS VIEW
002_PV 2.0.TIF CONSTRPLANS VIEW
003_PV 3.0.TIF CONSTRPLANS VIEW
004_PV 3.5.TIF CONSTRPLANS VIEW
005_PV 4.0.TIF CONSTRPLANS VIEW
006_PV 5.0.TIF CONSTRPLANS VIEW
007_PV 7.0.TIF CONSTRPLANS VIEW
008_PV 8.0.TIF CONSTRPLANS VIEW
002_PV 9.0.TIF CONSTRPLANS VIEW
ELEVATIONS CONSTRPLANS VIEW
010_C0.0.TIF CONSTRPLANS VIEW
011_C3.1.TIF CONSTRPLANS VIEW
012_S0.1.TIF CONSTRPLANS VIEW
013_S0.2.TIF CONSTRPLANS VIEW
014_S0.3.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW