Permit: T18CM09112
Permit Details
Apply Date:
11/16/2018
Applicant:
EMPIRE RENEWABLE ENERGY LLC
Description:
PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Contractors:
- EMPIRE RENEWABLE ENERGY LLC
Permit Reviews
Permit Number - T18CM09112
Permit Status: Final
Permit Description: PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/25/2019 | RESUBMITTAL | 02/25/2019 | COMPLETED |
04/25/2019 | REVISION - - 1ST | 04/25/2019 | COMPLETED |
11/16/2018 | PLANS OK TO SUBMIT - COMM | 12/13/2018 | COMPLETED |
12/13/2018 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 01/23/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM09112
Permit Status: Final
Permit Description: PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/16/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T18CM09112
Permit Description: PARKING GARAGE MOUNTED SOLAR PV SYSTEM
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2019 | ELECTRIC - INTERMEDIATE | DMUNIZ | Approved | 1200AMP DG Cabinet TO 800AMP DG Disconnect. DG Disconnect To 800AMP 3-Pole (48VDC Shunt Breaker). 3 sets of Parallel Conductors #300KCMIL, #1/0 Neutral, #1/0 Ground. Solar Cabinet Extension to Existing 8,000AMP SES Approved, Installed extension to Bus bar for Breaker back feed for Line side tap. Third party Inspection acquired and SES Re-certified. No TEP power-kill, Gear was locked out while Work was completed, ok to Re-energize. 1090- Partial. Final Inspection Pending final walk with contractor to insure all labeling is complete and Inverters are bonded. 2090- Partial- Walked job-site with Contractor all grounding and bonding looks ok. Except at one Inverter disclosed with Contractor and is to bond to EGC. Ok to Clear TEP (DGL), Shall Not energize until final Inspections. Note: Talk to Don Herman, Construction Manager regarding payment for after hours Inspection. Contractor disclosed that there have been overpayments on permit, and that Credit would be used for payment. |
05/20/2019 | ELECTRIC - UNDERGROUND | DMUNIZ | Approved | |
05/20/2019 | FRAMING | DMUNIZ | Approved | Special Inspections completed and collected Certificate. |
05/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | DMUNIZ | Approved | |
06/07/2019 | TEP CLEARANCE - PM | BSTEVENS | Approved | CODE DGC |
06/07/2019 | ELECTRIC - FINAL | BSTEVENS | Approved | |
06/07/2019 | BUILDING - FINAL | BSTEVENS | Approved |