Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T18CM09112
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2019 | ELECTRIC - INTERMEDIATE | Approved | 1200AMP DG Cabinet TO 800AMP DG Disconnect. DG Disconnect To 800AMP 3-Pole (48VDC Shunt Breaker). 3 sets of Parallel Conductors #300KCMIL, #1/0 Neutral, #1/0 Ground. Solar Cabinet Extension to Existing 8,000AMP SES Approved, Installed extension to Bus bar for Breaker back feed for Line side tap. Third party Inspection acquired and SES Re-certified. No TEP power-kill, Gear was locked out while Work was completed, ok to Re-energize. 1090- Partial. Final Inspection Pending final walk with contractor to insure all labeling is complete and Inverters are bonded. 2090- Partial- Walked job-site with Contractor all grounding and bonding looks ok. Except at one Inverter disclosed with Contractor and is to bond to EGC. Ok to Clear TEP (DGL), Shall Not energize until final Inspections. Note: Talk to Don Herman, Construction Manager regarding payment for after hours Inspection. Contractor disclosed that there have been overpayments on permit, and that Credit would be used for payment. |