Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
09/12/2018
Applicant:
RICHMOND AMERICAN CONSTRUCTION INC
Description:
SFR T25BMV T17-M0055
Contractors:
  • RICHMOND AMERICAN CONSTRUCTION INC

Permit Reviews

Permit Number - T18CM07233
Permit Status: Final
Permit Description: SFR T25BMV T17-M0055
Start Date Submittal Complete Date Status  
09/12/2018 RESIDENTIAL - BLDG/ZONING-WALKTHRU 09/12/2018 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T18CM07233
Permit Status: Final
Permit Description: SFR T25BMV T17-M0055
Total Outstanding Activity Conditions - 1
Date Name
09/12/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T18CM07233
Permit Description: SFR T25BMV T17-M0055
Total Completed Inspections - 25
Date Description Inspector Results Comments
09/25/2018 PLUMBING - SEWER HCS CONNECT TVALENC1 Approved IVRS - Inspection :*
09/25/2018 PLUMBING - YARD WTR LINE/TEST TVALENC1 Approved IVRS - Inspection :*
09/25/2018 PLUMBING - ROUGH, SOIL TVALENC1 Approved IVRS - Inspection :*
09/28/2018 BUILDING PRE-SLAB BJONES Approved
09/28/2018 ELECTRIC - UNDERGROUND BJONES Approved
09/28/2018 EXCAVATION/LAYOUT REBAR & ZON BJONES Approved
10/29/2018 EXT METAL CLIPS/EXT SHEATHING TVALENCIA Approved
10/30/2018 ROOF NAILING TVALENCIA Approved
11/16/2018 ELECTRIC - UFER DMUNIZ Approved 1) Seal 2 car Garage front chases.
2) Block combustion and relief vents.
3) Replace damaged H2O heater B-vent.
4) Correct swaled top plates above cut studs at garage relief vents.
5) West entry top plates need fire foam.
6) Rebuild Tub diverter wall in east hall bath.
7) Move N. Kitchen counter GFCI to window stud.
8) S.E. Bedroom- staple romex out of box.
9) Fire foam N. Kitchen & S.E. bedroom top plates.
10) Secure Master BR. 4 gang switch box.
11) Move PEX from master shower can light, need 12" clearance.
12) Master BR. ABS needs FHA & stud shoe.
13) Laundry recept needs to be tied into circuit.
14) Nail off dryer FHA strap.
11/16/2018 ELECTRIC - CONSTRUCTION POWER DMUNIZ Approved
11/16/2018 ELECTRIC - CABLE DROP DMUNIZ Approved
11/21/2018 MECHANICAL - INTERMEDIATE DMUNIZ Approved
11/27/2018 PLUMBING - GAS PRESSURE TEST MHASSAN Approved
11/27/2018 PLUMBING - INTERMEDIATE MHASSAN Approved
11/27/2018 ELECTRIC - INTERMEDIATE MHASSAN Approved
11/27/2018 FRAMING MHASSAN Approved
12/17/2018 SHEET ROCK NAILING DQUINN Approved
12/17/2018 BUILDING - FINAL DQUINN Approved Called in due to 1045 not being on permit
01/18/2019 TEP CLEARANCE - AM DMUNIZ Approved ECO
02/12/2019 PLUMBING - GAS RECONNECT DMUNIZ Approved CLEAR GAS
02/13/2019 GAS CLEARANCE DMUNIZ Approved
02/19/2019 MECHANICAL - FINAL DMUNIZ Approved
02/19/2019 PLUMBING - FINAL DMUNIZ Approved
02/19/2019 OUTDOOR LIGHTING FINAL DMUNIZ Approved
02/19/2019 ELECTRIC - FINAL DMUNIZ Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
None CONSTRPLANS VIEW