Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18CM06233
Permit Details
Apply Date:
08/09/2018
Applicant:
Timothy Robertson
Description:
ADD MASTER BEDROOM AND REC ROOM
Permit Reviews
Permit Number - T18CM06233
Permit Status: Expired
Permit Description: ADD MASTER BEDROOM AND REC ROOM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/09/2018 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 08/09/2018 | COMPLETED |
09/04/2018 | RESIDENTIAL - BLDG/WWM | 09/12/2018 | COMPLETED |
09/12/2018 | RESIDENTIAL - BLDG/WWM | 09/28/2018 | COMPLETED |
10/23/2018 | REVISION - - 1ST | 12/07/2018 | COMPLETED |
12/07/2018 | REVISION - - 2ND | 12/07/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM06233
Permit Status: Expired
Permit Description: ADD MASTER BEDROOM AND REC ROOM
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/09/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T18CM06233
Permit Status: Expired
Permit Description: ADD MASTER BEDROOM AND REC ROOM
Date | Description | Comments |
---|---|---|
09/04/2018 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM06233
Permit Description: ADD MASTER BEDROOM AND REC ROOM
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/12/2018 | COT - RSBU - Preslab | Passed | {Activity date: 12/12/2018; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 10/29/2018; Status: Denied; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Missing f-2 footers south garage wall Missing holddowns south garage wall Except f-2footers south deck} ; {Activity date: 10/26/2018; Status: Denied; Inspector: ESTEVENS; Comment: Entered by CBELL1 - 3 inch clearance required from rebar to earth. Center footing is two, F-2 footings. Rebar is required at corners} |
|
12/12/2018 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 12/12/2018; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - } ; {Activity date: 12/11/2018; Status: Approved; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - for two piers-caisson at the front entry area. Not for main structure addition.} ; {Activity date: 10/29/2018; Status: Denied; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Missing f-2 footers south garage wall Missing holddowns south garage wall Except f-2footers south deck} ; {Activity date: 10/26/2018; Status: Denied; Inspector: ESTEVENS; Comment: Entered by CBELL1 - 3 inch clearance required from rebar to earth. Center footing is two, F-2 footings. Rebar is required at corners} |
|
12/14/2018 | COT - RSBU - Roof Nailing | Passed | {Activity date: 12/14/2018; Status: Approved; Inspector: ESTEVENS; Comment: Entered by CBELL1 - } | |
12/14/2018 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 12/14/2018; Status: Approved; Inspector: ESTEVENS; Comment: Entered by CBELL1 - } | |
12/17/2018 | COT - BULD - SWG Clearance | Passed | {Activity date: 12/17/2018; Status: Approved; Inspector: ESTEVENS; Comment: Entered by CBELL1 - } | |
02/07/2019 | RSEL - Electrical Progress | Passed | {Activity date: 02/07/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } | |
02/11/2019 | COT - LCBU - Framing | Passed | {Activity date: 02/11/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } ; {Activity date: 02/08/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by CBELL1 - Work is incomplete} ; {Activity date: 02/07/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk. 2- Shall provide blocking at all horizontal sanitary vents every 5 feet. 3- Shall provide (3) sided blocking at all forced air vents.} ; {Activity date: 12/20/2018; Status: Not ready for Inspection; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - Required inspections still need before 1035 Framing can be signed off. Required inspections still need before 1035 Framing can be signed off. 2035 electric intermediate 3035 plumbing intermediate All trades complete inside wall and floor diaphragm. Then framing inspection, 1035. 1035, 2035, 3035, all at the same} |
|
02/15/2019 | COT - RSEL - Service Relocation | Passed | {Activity date: 02/15/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - OK to clear electric INCR this is a cut over from existing to new panel.} | |
02/15/2019 | PDSD Building Division - TEP PMÂ Clearance | Passed | {Activity date: 02/15/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - CODE INCR} | |
02/15/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 02/15/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - } ; {Activity date: 02/07/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1-Shall provide a trap and vent for the 2nd floor shower.} | |
02/15/2019 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 02/15/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - } | |
02/15/2019 | RSME - Mechanical Progress | Passed | {Activity date: 02/15/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - } ; {Activity date: 02/07/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } ; {Activity date: 09/04/2018; Status: Prior to Intermediates; Inspector: KEN; Comment: Entered by KKARSEN1 - MANUAL J-D-S REPORT MUST BE APPROVED PRIOR TO INSPECTION} | |
03/25/2019 | COT - RSME - Mechanical Final | Passed | {Activity date: 03/25/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } | |
03/25/2019 | RSBU - Building Final | Passed | {Activity date: 03/25/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } ; {Activity date: 02/15/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by CBELL1 - stairs up to second floor addition need to be fixed and made to code before final.} | |
03/25/2019 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 03/25/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } | |
03/25/2019 | COT - RSPL - Plumbing Final | Passed | {Activity date: 03/25/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } | |
03/25/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 03/25/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - approved upon 3090 approval from TVALENCIA} ; {Activity date: 10/18/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - 4" main under new garage only} ; {Activity date: 10/17/2018; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by CBELL1 - Plan calls for 3" waste, 4" is installed, DWV not on test} ; {Activity date: 10/15/2018; Status: Denied; Inspector: ESTEVENS; Comment: Entered by VFLORES1 - No access to garage plumbing, P2604.3, backfill shall be free from rocks. No contractor contact number.} | |
03/25/2019 | COT - RSEL - Electrical Final | Passed | {Activity date: 03/25/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } |