Inspection Status: Passed
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 02/11/2019 |
COT - LCBU - Framing |
TVALENCIA |
Approved |
Entered by CBELL1 - |
| 02/08/2019 |
COT - LCBU - Framing |
TVALENCIA |
Not ready for Inspection |
Entered by CBELL1 - Work is incomplete |
| 02/07/2019 |
COT - LCBU - Framing |
TVALENCIA |
Denied |
Entered by CBELL1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk.
2- Shall provide blocking at all horizontal sanitary vents every 5 feet.
3- Shall provide (3) sided blocking at all forced air vents. |
| 12/20/2018 |
COT - LCBU - Framing |
DMCCARTHY |
Not ready for Inspection |
Entered by CBELL1 - Required inspections still need before 1035 Framing can be signed off.
Required inspections still need before 1035 Framing can be signed off.
2035 electric intermediate
3035 plumbing intermediate
All trades complete inside wall and floor diaphragm. Then framing inspection, 1035.
1035, 2035, 3035, all at the same |